NOTICE
Risk of improper power-supply connection. Cancause equipment damage and loss of warranty coverage.
Prior to connecting any equipment to a mainor alternate power source (for example: back-up generator
systems) for start-up, commissioning, testing, or normal operation, ensure that these sources are correctly
adjusted to the nameplate voltage and frequency of all equipment to be connected. Ingeneral, power-source
voltages should be stabilized and regulated to within±10%of the load nameplate nominal voltage. Also, ensure
that no three-phase sources are single-phased at any time.
See transformer label for primary tap connections. Installer will need to change transformer primary taps if
applied unit voltage is other thanpre-wired tap voltage.
NOTE: Seal openings around piping and electrical connection to prevent air leakage. Failure to do so
could reduce the unit’s cooling performance.
The electrical and unit-to-unit connections are described inthe submittal documents included inthe
The following table lists the relevant documents by number and title.
Document Number
Title
DownflowUnits
Electrical FieldConnections, DownflowCW038toCW084
Electrical FieldConnections, Downflow, CW106andCW114
Electrical FieldConnections, Downflow, CW146andCW181
UpflowUnits
High-voltage Connections, Upflow, CW038toCW084
Low-voltage andEthernetConnections, Upflow, CW038toCW084
High-voltage Connections, Upflow, CW106andCW114
Low-voltage andEthernetConnection, UpflowCW106andCW114
Unit-to-Unit Networking
Liebert®iCOMUnit-to-unit Network Connections
Table 6.1 Electrical Field-connection Drawings
Vertiv | Liebert® CW™Installer/User Guide
40
Содержание Liebert CW 038
Страница 14: ...Vertiv Liebert CW Installer User Guide 14 Thispageintentionally left blank...
Страница 22: ...Vertiv Liebert CW Installer User Guide 22 Thispageintentionally left blank...
Страница 38: ...Vertiv Liebert CW Installer User Guide 38 Thispageintentionally left blank...
Страница 44: ...Figure 7 2 Lowering EC fans into floor steps 8 through 9 Vertiv Liebert CW Installer User Guide 44...
Страница 80: ...Vertiv Liebert CW Installer User Guide 80 Thispageintentionally left blank...
Страница 102: ...Vertiv Liebert CW Installer User Guide 102 Thispageintentionally left blank...
Страница 105: ...2 Check contactorsfor pitting Replaceifpitted 3 Check Re torquewireconnections 11 PreventiveMaintenanceChecklist 105...
Страница 108: ...Vertiv Liebert CW Installer User Guide 108 Thispageintentionally left blank...
Страница 167: ...Vertiv Liebert CW Installer User Guide...