background image

GEIST™ S

WITCH

A

IR

AIRFLOW MANAGEMENT DEVICE

 

Quick Installation Guide

VM1180/590-2244-501A

   

 1

Models: 

SA2-004

Switch Type: 

Front (Port) Air Intake - Rear 

Exhaust 1U Switches

CAUTION:

 Ensure the required 

airflow for safe operation of 

equipment is not compromised 

when installing the Geist SwitchAir 

device.

WARNING: 

Take precaution to 

avoid interference with the switch’s 

input power cords when installing 

behind a live switch.

1. Installing the airflow

channel

s

Using customer-provided

hardware, insert the cage nuts

into the four holes on the front

of the channel.
Select a 2U space in the rack.

With the channel facing the

centerline of the rack, hold the

channel on the inside of the left

rack upright. Fasten in place

using screws only in the top and

bottom holes of the 2U space.
Repeat the procedure to install

the airflow channel on the

opposite side.

2. Installing the switch

Slide the network switch into

the bottom 1U at the rear of the

rack’s 2U space. Using

customer-provided cage nuts

and screws, mount the switch

to the rear rack uprights.

Geist Network Switch Installation

Geist SwitchAir Airflow Management Device

Geist SwitchAir Rack Rail Installation

1

Left front 

rack upright

Top and bottom 

screws of 2U space

CEN

TER

LIN

OF

 RA

CK

2

Cage nuts x4

RACK 

FRONT

RACK 

REAR

Left rear 

rack upright

Network 

switch

RACK 

FRONT

RACK 

REAR

Side airflow

channel

Side airflow

channel

Отзывы: