To contact Vertiv Technical Support: visit www.VertivCo.com
© 2019 Vertiv Co. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names,
trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no
responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions. Specifications are subject to change without notice.
GEIST™ SWITCHAIR AIRFLOW MANAGEMENT DEVICE
Quick Installation Guide
2
VM1192/590-2232-501
4. Installing the SwitchAir
device into the rack
Insert the SwitchAir device into
the open rack space at the
same 3U height as the switch.
As the SwitchAir device is
inserted into the space, the
wipers make contact with the
rear corners of the switch.
The wiper tabs act as a guide to
deflect the wipers past the
switch’s corners and along it’s
sides.
Once the SwitchAir device is
fully seated, install the
mounting screws to fasten the
unit to the front rack uprights.
Airflow
Airflow
SwitchAir
Switch
3
4
Geist SwitchAir Rack Installation Complete
Geist SwitchAir and Network Switch Installation
Front upright
Rear upright
Airflow channel
Airflow channel