Mechanical Installation
Vertiv
| Liebert
®
EXM
™
Parallel Cabinet User Manual |
10
3.
Connect the ground and any necessary main bonding jumper to the equipment ground busbar.
4.
See
for all power connections.
5.
Tighten the connections to the proper torque (see
).
Ensure correct phasing
.
6.
Connect the control wiring from the Liebert EXM Parallel Cabinet terminal block TB1 to the Liebert EXM UPS
Bypass Module (X9 J23 and J26). Tighten the connections to the proper torque (see
).
7.
Replace the panels. If your system has an SKRU interlock, refer to
NOTE
The grounding and neutral bonding arrangement must be in accordance with local and national
codes of practice.
NOTE
Care must be taken when routing power cables. Ensure that the cables do not touch other
busbars.
Table 1
Power wiring for Liebert EXM UPS to Liebert EXM Parallel Cabinet
System Configuration
From
To
Liebert EXM 10-20kVA 2+0
Liebert EXM 10-40kVA 1+1
Utility
UPS 1 AC Input
Utility
UPS 2 AC Input
Utility
TB4
UPS 1 AC Output
TB1
UPS 2 AC Output
TB2
TB1
MOB1
TB2
MOB2
TB5
Critical Load
Liebert EXM 30-40kVA 2+0
Utility
UPS 1 AC Input
Utility
UPS 2 AC Input
Utility
MBB
UPS 1 AC Output
TB1
UPS 2 AC Output
TB2
TB1
MOB1
TB2
MOB2
TB5
Critical Load
Liebert EXM 10-40kVA 2+1
Utility
UPS 1 AC Input
Utility
UPS 2 AC Input
Utility
UPS 3 AC Input
Utility
TB4
UPS 1 AC Output
TB1
UPS 2 AC Output
TB2
UPS 3 AC Output
TB3
TB1
MOB1
TB2
MOB2
TB3
MOB3
TB5
Critical Load
Содержание EXM Parallel Cabinet
Страница 1: ...Liebert EXM Parallel Cabinet User Manual 10 200kVA 60Hz ...
Страница 36: ...Specifications Vertiv Liebert EXM Parallel Cabinet User Manual 32 ...
Страница 37: ......