background image

DCF™ Optimized Rack System

Installer/User Guide

Содержание DCF 42U

Страница 1: ...DCF Optimized Rack System Installer User Guide...

Страница 2: ...any installation or operational issues with your product check the pertinent section of this manual to see if the issue can be resolved by following outlined procedures For additional assistance visi...

Страница 3: ...Inspection 13 4 2 Required Setup equipment 13 4 3 Unloading the DCF Rack 13 4 4 Equipment Layout Repositioning Removal and Installation 14 4 4 1 Installing the Edge Guard 14 4 4 2 Positioning and Att...

Страница 4: ...Vertiv DCF Installer User Guide 4...

Страница 5: ...duct is not intended for use with life support or other U S FDA designated critical devices Maximum loads must not exceed those specified in this manual The maximum load rating for the DCF is found in...

Страница 6: ...Vertiv DCF Installer User Guide 6 This page intentionally left blank...

Страница 7: ...LEVELING FEET WITH CASTERS WITH AND WITHOUT SIDE PANELS WITHOUT DOORS WITH DOORS 42U 76 2 1936 6 77 1956 2 78 1 1984 7 23 6 600 41 8 1062 5 43 3 1100 48U 86 7 2203 3 87 5 2222 9 88 6 2251 4 31 5 800 4...

Страница 8: ...Vertiv DCF Installer User Guide 8 This page intentionally left blank...

Страница 9: ...marking labels on both sides of the rails Front and rear mount rails are installed in the DCF at 29 13 in 740 mm 3 1 2 Full height Rack PDU Cable management Bracket Each DCF rack leaves the factory wi...

Страница 10: ...x 31 5 2100 x 800 31 768 Part 546053G4L Table 3 1 Door dimensions single door FRAME SIZE DOOR DIMENSIONS IN MM PART NUMBER HEIGHT WIDTH EACH DOOR 42U 78 1 x 23 6 2000 x 600 76 1931 5 11 5 293 Part 54...

Страница 11: ...k ITEM DESCRIPTION 1 Cable entry holes 4 holes include edge guards and removable grommets 2 Fan Cable access hole standard 3 3 Mounting Hardware and Tools Hardware to install accessories ships with th...

Страница 12: ...Vertiv DCF Installer User Guide 12 This page intentionally left blank...

Страница 13: ...ding the DCF Rack Before unloading note the weight of the model see Specifications CAUTION Use at least two people when moving the unit 1 Using a pallet jack or forklift move the DCF on its pallet to...

Страница 14: ...acket to rack 2 typical 3 Lag bolt holes for securing anchor bracket to pallet and or floor 4 4 Equipment Layout Repositioning Removal and Installation To keep the unit s center of gravity as low as p...

Страница 15: ...cabinets 1 Determine the installation location of the EIA rails 2 Loosen the M6x12 screws in the rail adjustment brackets securing the 19 EIA rails to the frame member as shown in the following figur...

Страница 16: ...ITEM DESCRIPTION 1 Face of EIA rail 2 Rail adjustment screw 3 Frame member holes 4 Frame member To position EIA rails on 800 mm cabinets 1 Determine the installation location of the EIA rails 2 At th...

Страница 17: ...d by two hinges and held in place by gravity They can be lifted off and reinstalled without tools NOTE Doors are easier to remove if they are open at a 90 angle to the DCF cabinet To reverse the front...

Страница 18: ...and the upper panel hangs on the rack frame Each panel is secured with a lock making the panels simple to remove and replace when installing equipment and performing maintenance To remove a side panel...

Страница 19: ...et for installation with the inside bottom flange of the PDU resting on the flange of the frame member at the top and bottom See the flange in the following figure 2 Hold the PDU bracket in place then...

Страница 20: ...s to the cabinet The outer hole centers the cabinets at 24 in 609 6 mm The center hole puts the cabinets on metric centers Connecting the racks is easier if the are in their final installation positio...

Страница 21: ...It should be cleaned periodically more frequently if the air in the vicinity is not filtered for particulates Dust should be cleaned from installed equipment according to the manufacturer s recommend...

Страница 22: ...Vertiv DCF Installer User Guide 22 This page intentionally left blank...

Страница 23: ......

Страница 24: ...logos referred to are trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracyand completeness herein Vertiv Co assumes no r...

Отзывы: