Equipment Mounting
590-2115-501A/SL-29430/4200-129
9-1
9.
Equipment Mounting
The equipment can accommodate three types of mounting:
19” rack mount
, stack mount to additional
Vertiv equipment or flush/flat mount. .
If the 19” rack mount option is required, the rack mount angle brackets will need to be installed on each
side of the unit. Use the screws provided to secure the rack mount brackets to the unit. The unit can be
installed in any standard 19” rack or cabinet
.
For 23” rack mounting, 1U rack
extension brackets are
commercially available and would be required.
Figure 7
–
UXCT 19” Rack Mounting
If the stack mount to additional Vertiv equipment option is required, the stack mount brackets will need
to be installed on each side of the unit. Use the screws provided to secure the rack mount brackets to
the unit. Remove the upper two front screws of the existing Vertiv equipment and secure the UXCT to
the equipment by replacing the screws through the stack bracket.
Figure 8
–
UXCT Stack Mounting