KSU Installation
3
-
8
Chapter 3: KSU Installation
SBX IP 320 Installation Guide
Figure 3-2
PSU Installation (2 of 2)
Frame Ground Connection
It is very important that the frame of the SBX IP 320 System is grounded:
1.
Turn the grounding screw counter clockwise to loosen, as shown in Figure 3-3.
2.
Insert the grounding wire and tighten the screw.
3.
Then connect the grounding wire to an appropriate ground source (refer to Caution).
Figure 3-3
Grounding the KSU
Содержание SBX IP 320
Страница 1: ...Installation Guide SBX IP 320 ...
Страница 4: ......
Страница 29: ...KSU Installation 3 11 Chapter 3 KSU Installation SBX IP 320 Installation Guide Figure 3 4 Mounting Template ...
Страница 40: ...Expansion KSU Installation 3 22 Chapter 3 KSU Installation SBX IP 320 Installation Guide ...
Страница 58: ...Other Board Installations 4 18 Chapter 4 Board Installation SBX IP 320 Installation Guide ...
Страница 84: ...Basic Programming 6 16 Chapter 6 Starting the SBX IP 320 SBX IP 320 Installation Guide ...
Страница 100: ...Starting S W Upgrade 8 8 Chapter 8 Software Upgrade SBX IP 320 Installation Guide ...
Страница 142: ... Data Display Area 9 42 Chapter 9 Remote Diagnostics SBX IP 320 Installation Guide ...
Страница 148: ...Index IND 4 SBX IP 320 Installation Guide ...