Integral Cab Header Installation
LD-16 Door Operator - Modernization
26
© Vertical Express
Single-Speed Center-Opening Doors Integral Cab Header Installation
(continued)
14. Use a 4 mm Allen wrench to remove the door controller cover, and remove the rub-
ber grommet from the operator box.
15. Install the junction box to the door operator. See Figure 22.
16. Route the wiring harness through the 1
1
/
2
" flex conduit, and then install the 1
1
/
2
" flex
and straight connectors.
17. Install the wiring harnesses through the flex conduit; insert the OPERF or OPERR
plug into the COP harness end.
18. Install the CTS to the top of the junction box. See Figure 22.
19. Before routing, cable tie the CTS wiring.
20. Proceed to New/Existing Car Door Panel Installation on page 44.
Figure 22 - Car Top Station Installation
Install Junction Box
Install CTS and
Wiring Harness