background image

 

 

Vertex™ Rx-C 6D Calcium Reactor / Instruction Manual

   

           © Vertex Aquaristik ™GmbH, Deutschland 2014

 

 

 

 

 

 

 

 

  

 

 

 

  

 

P

a

ge

 

14

 

 

assembling and putting the unit back in operation. For any further maintenance of the Sicce™ motor block simply 
refer to the Sicce™ manual supplied. 

*

Useful Tips:

 

Before  reassembling  the  pump;  ensure  the  inner  motor-block’s  bearing  inside  the  pump  is  properly  seated. 
Further  to  all  the  instruction  above  on  how  to  disassemble  the  reactor  body  and  pump  the  following 
maintenances are recommended to be performed from time to time or when necessary: 

 

Apply a small amount of food-grade silicone lubrication to  O-Rings 

 

Apply a

 

small amount of food-grade silicone lubrication to the Bayonet’s Screw-side 

 

Inspect for any blockage in the tubes or the reactor. 

 

Check your reactor often, the valves, push to connect fittings, tubing, flow meter and other parts can 
quickly become blocked with deposits, causing a buildup of CO2 inside the unit. 

 

The size of the drops on each brand of reactor will be different and irregular. For this very reason 
Vertex™ utilizes a miniature flow meter allow betting monitoring of Effluent’s flow rate. However 
due to the small amount  of flow monitored,  the  meter  requires up to  100 seconds to display the 
proper flow rate after each adjustment. The flow rate is significantly affected by temperature and 
specific gravity of water. (An estimation of accuracy without considering actual water temperature, 
specific gravity and other factors is approxi/- 11%) 
 

Tip: Although the Flow meter can be used continuously; it is recommended to bypass the flow meter 
after the initial set up has been completed.  Calcium Reactor Effluent can cause rapid calcification.  
There are also small particles present in the effluent that can block the meter. If used continuously 
the meter WILL require more frequent cleaning/ maintenance regiment. To bypass the Flow meter 
simply disconnect it from the system and deliver the effluent to your system right after the onboard 
needle valve. For future adjustments you can simply reinstall the meter in  seconds. If disconnected 
from  the  system  it  is  best  to  be  placed  in  clean  RO  Water  or  cleaned  properly  to  store.DO  NOT 
DISSASEMBLE  THE  METER.  To  clean  the  meter;  place  it  in  a  VERY  mild  solution  of  Acetic  Acid 
(Household white vinegar) overnight and then clean with RO water. DO NOT USE STRONG ACIDS OR 
HOUSEHOLD CLEANING CHEMICALS. 
 

 

Having multiples of failsafe is always the best method to ensure the health of your system. If possible 
we recommend monitoring the PH at 3 points: 

 

1-

 

Aquarium water 

2-

 

Primary Chamber 

3-

 

Last stage Effluent 

This ensure proper monitoring and maintenance of PH and other parameters of your tank. 

Содержание Rx-C 6D

Страница 1: ...nse Do not touch the plug and or the electrical outlets with wet hands Always dry your hands first Rx C 6D and its components are solid heavy objects impact can cause bodily harm loss of life and or damage to property Do not attempt to service the unit while in operation or connected to electricity Unless you are qualified service only by authorized service professionals Do not attempt to alter th...

Страница 2: ... and run with water and no media for a few hours Please follow this guide without using any media Once you are satisfied that your reactor is devoid of any defects you can simply fill it with desired media s and put in operation 3 Rinse your Media with RO water Only use coarse media 4 Remove Primary Chamber from the box Do not lift or hold the chamber by its upper manifold 5 Gently unscrew the Pri...

Страница 3: ... connection yet 15 Remove the Syncra pump from the packaging Ensure the metal shaft is properly in place 16 Gently place the pump on its dedicated spot within the base To further reduce operation noise large rubber dampeners have been utilized These dampeners Rubber Feet have also dedicated machined circles within the base that they sit on 17 Mach the pump with its bearing plate fixed behind the p...

Страница 4: ...forced against this connection can break rendering the secondary chamber unusable 27 Hold the Bottom sub chamber s body with one hand and the upper sub chamber s body with the other hand Twist in opposite directions and the bottom sub chamber Secondary Chamber for Carbonate Media will separate 28 If desired this chamber can be filled with additional Calcium Carbonate media to remove any excess CO2...

Страница 5: ...y to be free of debris and or any media particles Caution Debris or any particles present between the lid and the body or the threading can damage the threads rendering the reactor unusable Such damages are not covered under warranty 39 Now the Secondary Chamber can be placed on its dedicated slot within the reactor s base A dedicated small rectangular slot has been milled into the reactor s base ...

Страница 6: ...eat set up assembly You can simply run any tube through any of the 5 machined holes 44 Use a sharp knife to cut the tubing in desired lengths It is Imperative to cut the tubes with clean and straight ends edges Angled cuts will possibly be the cause of leaks immediately or after some time Diagram 2 exhibits how the tubes should be cut Diagram 2 45 When connecting the tubes to the fittings insert t...

Страница 7: ...econdary Chamber Sub Chamber C Bottom Secondary Chamber Sub Chamber D Gas Interface Chamber E Bubble Counter F Flow Meter G Needle Valve H Effluent Exit Primary Chamber I PH Probe Port J Unused CO2 Recycle Primary Chamber K Unused CO2 Recycle Manifold L Source Water Input M CO2 Input Manifold N CO2 Output Bubble Counter O CO2 Input Source Bubble Counter P Custom Sicce Syncra Pump Q Secondary Chamb...

Страница 8: ...urce Water and Carbon Dioxide A Media I Calcium Carbonate Media Primary Media Different type of Media can be utilized in a Calcium reactor such as Dead Coral Skeleton Broken shells of different mollusks Vertex Aquaristik only recommends the use of coarser media with a minimum Average particle size of 12mm or larger in diameter Smaller particle size media do break down much faster and get compacted...

Страница 9: ...ired to dissolve the Calcium Carbonate Media Due to the fact that C02 is supplied in a pressurized container it is imperative that you observe and follow all safety precautions to allow presence of such equipment in your living commercial space Only use CO2 Safe tubing Respect and follow local state and Federal rules and guideline as how CO2 tanks and equipment must be handled used stored and or o...

Страница 10: ...can cause CO2 tanks Regulators Solenoids and or any other related devices must be installed handled maintained and or serviced only by qualified professionals Improper install maintenance operation or service can cause damage to your system property loss of livestock bodily harm or loss of life Vertex Aquaristik cannot be held liable for damages caused by the use of a pressurized gas tank systems ...

Страница 11: ...he relation between amount of gas injected flow and PH value However these relations are not always linear and must be monitored and observed on each system individually Diagram 5 Warning A balanced relation and concentration between Calcium and Alkalinity is required and while the points above apply they are all affected if one value is reduced or increased Explaining as how an equilibrium can be...

Страница 12: ... pH too quickly which could be harmful to the inhabitants Caution Always start at low output and allow a few days to bring the reactor to its maximum desired output level The recommended flow guidelines in this document should only be used as a marker Every system is different and without considering all the factors such as size consumption levels it is impossible to make a proper assessment of wh...

Страница 13: ...ny spillage 4 Remove your reactor from its environment one chamber at a time 5 Follow the assembly guide in reverse to disassemble your reactor fully 6 Now you can clean service or refill your reactor 7 To put back in operation simply follow the assembly section of this manual Disassembling your pump for decalcification removing any possible debris from pump head and or any other service can be ac...

Страница 14: ...low rate after each adjustment The flow rate is significantly affected by temperature and specific gravity of water An estimation of accuracy without considering actual water temperature specific gravity and other factors is approximately 11 Tip Although the Flow meter can be used continuously it is recommended to bypass the flow meter after the initial set up has been completed Calcium Reactor Ef...

Страница 15: ...ock and or personal injury please follow all these instruction and or consult with a professional Vertex Aquaristik will not be held liable for any damages the misuse modifications and or improper installation of this unit may cause Further to all the above due to the fact that this device requires a pressurized gas tank to operate which requires scheduled inspections monitoring and adjustment onl...

Страница 16: ... Vertex Aquaristik products please either consult with your dealer or any of the following resources Website www vertexaquaristik com E mail info vertexaquaristik com By Phone Global 49 0 2234 99366 0 Monday Friday 9am to 5pm UTC Americas 1 604 278 1474 Monday Friday 9am to 5pm PST By Mail Vertex Aquaristik GmbH 19A Max Planck Street Cologne Germany 50858 ...

Отзывы: