5.0 Operation
5.1 Start Up
a. Connect feed water line and all tubing according to instructions. If cabinet
does not have filtration system installed, skip to step e. Open door of cabi-
net to expose filtration system. Turn the water on at the piercing valve or
feed water valve.
b. From the inside of the cabinet, disconnect the tubing from the upper bulk-
head and flush water through filtration system into a pan or bucket by open-
ing the feed water ball valve.
c. Once water runs clear, close ball valve and reconnect tubing to upper bulk-
head.
d. For filtration configured coolers, open feed water ball valve. For non-filtration
coolers, turn water on at the piercing valve.
e. Make sure Cold and Hot power switches at back of cooler are OFF before
plugging the cooler into 110-volt wall socket. (See Figure 7a)
Figure 7
Hot/Cold Power
Switches
f. Plug in power cord. Cooling chamber fill valve will automatically open (with
audible click) allowing water to fill cooling chamber until full (30-60 seconds
for no filter and ‘F’ configurations. Valve will then close automatically. NOTE:
The chilling chamber has a re-circulation pump that will come on automati
cally when plugged in. The pump may make noise if the tank has not yet
filled with water.
g. To dispense cold water press Cold dispense button & hold until water dis-
penses in a full stream ( about 5-10 seconds). Water will now dispense on
demand.
h. To fill hot tank with water, first press and hold the lock button on the front
panel of the cooler. A beep sound will be heard after 1 second indicating that
the hot button has been unlocked. Next, press and hold (within 5 seconds of
beep sound ) the hot water dispense button until water starts dispensing from
spigot ( about 1 minute) Water will now dispense on demand.
Figure 8
Control Panel
10
i.
System Flush:
It is recommended to flush both the cold and hot systems by
dispensing 16-32 ounces of water out of each at Initial start-up. First press and
hold the cold dispense button until 16-32 oz have been dispensed. Then
press hot lock until beep and then press and hold hot dispense button until 16-
32 oz of water have been dispensed. The system is now ready to operate.
j. Turn on hot and cold switches on the back of the cooler. Heating and
cooling will start.
k. The temperature of cold water is set at the factory. Using a flat screw
driver, the temperature can be adjusted, if needed, by turning the
temperature control slot Clockwise for colder and Counterclockwise for
warmer (See Figure 3).
CAUTION: If you turn the COLD POWER button off, wait at least 3 minutes
before turning on again to protect the compressor from damage.