background image

FCC ID: K6630163X3S

IC ID: 511B-30163X3S

Alignment

2/6

Vertex Standard Co,. Ltd.

Required Test Equipment

ˆ

  RF Signal Generator with calibrated output level at 200 MHz

ˆ

  Deviation Meter (linear detector)

ˆ

 AF 

Millivoltmeter

ˆ

 SINAD 

Meter

ˆ

  Inline Wattmeter with 5% accuracy at 200 MHz

ˆ

  Regulated DC Power Supply: 13.8 VDC, 10A

ˆ

  50-ohm Non-reactive Dummy Load: 30W at 200 MHz

ˆ

  Frequency Counter: >0.1 ppm accuracy at 200 MHz

ˆ

  AF Signal Generator

ˆ

  DC Voltmeter: high impedance

ˆ

  VHF Sampling Coupler

ˆ

  AF Dummy Load: 4 Ohms, 10 W

ˆ

 Oscilloscope

ˆ

 Spectrum 

Analyzer

ˆ

  GX3500S Marine Transceiver

ˆ

  CMP25 Remote Access Microphone

Alignment Preparation & Precautions

A dummy load and inline wattmeter must be connected to the main antenna jack in all

procedures that call for transmission. Correct alignment is not possible with an antenna.

After completing one step, read the following step to determine whether the same test

equipment will be required. If not, remove the test equipment (except dummy load and
wattmeter, if connected) before proceeding.

Correct alignment requires that the ambient temperature be the same as that of the

transceiver and test equipment, and that this temperature be held constant between 20°C
and 30°C (68°F and 86°F). When the transceiver is brought into the shop from hot or cold
air it should be allowed some time for thermal equalization with the environment before
alignment. If possible, alignments should be made with oscillator shields and circuit boards
firmly affixed in place. Also, the test equipment must be thoroughly warmed up before
beginning.

Note: Signal levels in dB referred to in this procedure are based on 0 dBµ = 0.5 µV (closed
circuit).

Overview of Test Mode

The test mode has been build in the microprocessor in order to adjust and confirm the

performance of transceiver.

The purpose is to adjust transceiver simply and to confirm the performance of

transceiver smoothly.

Содержание CPV350

Страница 1: ...ake complete performance checks to ensure compliance with factory specifications after replacing any faulty components Those who do undertake any of the following alignments are cautioned to proceed at their own risk Problems caused by unauthorized attempts at realignment are not covered by the warranty policy Also Standard Horizon a division of VERTEX STANDARD must reserve the right to change cir...

Страница 2: ...owing step to determine whether the same test equipment will be required If not remove the test equipment except dummy load and wattmeter if connected before proceeding Correct alignment requires that the ambient temperature be the same as that of the transceiver and test equipment and that this temperature be held constant between 20 C and 30 C 68 F and 86 F When the transceiver is brought into t...

Страница 3: ... 0 1 V in the receive mode Use the 16 9 key to set the channel to CH16 adjust TC1002 so that voltage on the TP1008 is below 3 0 V 0 1 V in the transmit mode Adjustment and Confirmation of Transmit Power Adjust power at high and low in the transmit mode and confirm power in the specified bandwidth Adjustment Connect the wattmeter and 50 ohm dummy load to the antenna jack Use the H L NAV key to set ...

Страница 4: ...he center frequency of the spectrum analyzer to 159 00 MHz set SPAN to 20 00 MHz set RBW and VBW to 30 KHz and set SWP to 56 ms Adjust L1001 L1002 L1003 L1004 and L1005 until the wave form shown in below is obtained Note Adjust the output of the tracking generator so that RF AMP and spectrum analyzer will not saturate Figure shows the reference wave form The wave form varies with measuring instrum...

Страница 5: ...a Input NMEA format data output from GPS receiver to NMEA terminal A of transceiver and display it to the LCD of the transceiver NMEA format data output from GPS receiver is applied to NMEA terminal of transceiver s option connector and LCD of transceiver will show data Confirmation Setup the test equipment as shown below Press and hold the H L NAV key confirm that the position data is displayed o...

Страница 6: ... is displayed in the LCD of the test transceiver Confirm that the confirmation transceiver receives the response from the test transceiver and outputs beep Press the CALL MENU key of the confirmation transceiver and turn off the beep Simultaneously confirm that TEST of test transceiver s MMSI is displayed in the LCD of the confirmation transceiver ...

Отзывы: