14
14
UVL Series
Troubleshooting
Honeywell Valve (UVL-R series)
• Supply line hooked up
• Shutoff valve open
• Lockout has engaged. Wait 60 seconds
and try again
• Piezo screws are tight for good ground
• For spark at electrode while depressing
piezo - 1/8” gap to pilot hood needed
• All wiring connections
• Replace piezo ignitor
• For air in the lines
• Thermopile needs a minimum of 325mV
• All wiring connections
• Replace thermopile
• Thermocouple needs a minimum of 14mV
• Defective valve. turn to pilot, meter should
read greater than 100mV. If not, replace the
valve.
• Valve turned on
• Wall switch is not turned on
• Thermopile needs a minimum of 325mV
• Plugged burner
Gas supply on
Pilot lights with Piezo
Pilot stays lit
Pilot lights main
burner
System OK
YES
YES
YES
YES
START
CHECK
NO
NO
NO
NO
Содержание UVL18MN
Страница 20: ...2020 UVL Series ...