Vermont Castings SDDVT Series Скачать руководство пользователя страница 22

22

Stardance Direct Vent/Natural Vent Gas Heater

20012734

Supporting DIRECT-TEMP: Vertical Support

Vertical installations can be supported by two methods:
Ceiling Support (CS) (used in flat ceiling installation) 
comes with a support plate and a support collar. Install 
it by screwing the support plate to the top of the prop-
erly framed ceiling joist opening, using screws provided. 
A round trim plate (TP) is attached to the ceiling, using 
screws, to provide a finished appearance once in-
stalled. (Fig. 35)

�����
�������
����������������
����

Ceiling Support 
Plate

Ceiling Support 
Collar

Trim Plate

ST923

Fig. 35

  Ceiling support.

The Cathedral Ceiling Support (CCS) may be used in 
pitched or flat ceiling installations and comes with a 
support collar and a decorative two part square trim 
plate. Install by inserting the support box down through 
the framed joist opening (end with round hole first) in 
the ceiling using tin snips, cut the corners of the open 
end of the box such that the sides can be folded down 
over the top of the joist framing members. Nail the 
folded sides to the top of the framing. (Fig. 36)

�����
�������������������
����

Two Part Square 
Trim Plate

Support Box

Support Box Collar

ST926

Fig. 36

  Support box.

A two-part square trim plate is provided to give a fin-
ished look once installed. Simply fit the two halves of 
the trim plate around the cathedral ceiling support box 
hanging below the ceiling (overlapping if necessary) 
and screw them to the ceiling. Both the ceiling support 
and cathedral ceiling support can support a maximum 
of 40’ (12 m) of pipe.

Offsets:

If any offsets are necessary in the vertical system, an 
Offset Support (OS) should be installed directly above 
the upper elbow of the offset. Install by attaching the 
offset support band to the pipe with two #8 x 1/4” sheet 
metal screws (minimum ) and secure the offset support 
straps to surrounding structure. (Fig. 37)

�����
��������������������
����

Nail to top of 
framing

Offset Support 
Strap

Offset Support 
Collar

ST927

Fig. 37

  Offset support.

Supporting DIRECT-TEMP: Horizontal Support

Horizontal runs of Direct-Temp should be supported 
every 4’ (122 cm) of pipe. This can be done with the use 
of plumbers strapping or the offset support.

Adjustable Length (AJ)

An Adjustable Length is available to accommodate 
installations where non-standard lengths are necessary. 
The adjustable length telescopes down over a standard 
length of pipe and provides an extension range of 3

¹⁄₂

” 

(89 mm) to 10

¹⁄₂

” (267 mm). Install by sliding the inlet 

end of the adjustable length over the outlet end of a 
standard length of pipe. After positioning the adjustable 
length appropriately, secure it to the standard length 
with two (2) #8 x1/4” sheet metal screws (provided). 
Seal the area between both the top and bottom of the 
adjustable length outer wall and the outer wall of the 
standard length with an approved silicone sealant.

Fire Stopping

DIRECT-TEMP must be firestopped wherever it passes 
through floors, ceiling or walls. The only location where 
a firestop is not required is at the roof level. Both verti-
cal support components with trim plates provide for 
firestopping. The wall thimble also acts as a firestop. 
at other locations, a firestop spacer (FS) should be in-
stalled. In the attic the firestop should be placed on top 
of the joist framing to prevent debris from falling into the 
joist framing. (Fig. 38)

Horizontal Installation

1.  Determine the appliance location. Refer to the appli-
ance manufacturer’s installation instructions for clear-
ance to combustible requirements, termination options, 
number of elbows, maximum length, etc. Then posi-
tion the appliance and plan vent routing accordingly. 

Содержание SDDVT Series

Страница 1: ...re department DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE This appliance may be installed in an after market permanently located...

Страница 2: ...l Vent ONLY 12 Venting Requirements and Options Direct Vent ONLY 13 Assembly Install the Optional Fan 15 Procedures Venting System Assembly Direct Vent 16 Install Vent Adapter Pipe 16 Side Wall Termin...

Страница 3: ...h the roof Conventional venting systems Natural Vent take air from the room for com bustion and vent the exhaust vertically through the roof to the atmosphere This appliance is approved for bedroom in...

Страница 4: ...terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTR...

Страница 5: ...ention The Stardance stove is shipped from the factory as a Direct Vent Gas Heater This heater may be converted into a Natural Vent unit in the eld If a Natural Vent heater is desired the Vermont Cast...

Страница 6: ...ated out of traf c and away from furniture and draperies The surface of the Heater Is hot when it is in use Young children should be watched carefully when they are in the same room when the Heater is...

Страница 7: ...ue centerline Wall Centerline from Floor ST131b Stardance wall thimble 9 28 00 djt A Direct Vent Only ST131b Effective Minimum Wall Thimble 56 1480 mm CFM Pipe Centerline 52 1378 mm Simpson Duravent...

Страница 8: ...and operational procedures For assistance or additional information consult a quali ed installer service agency or the gas supplier Horizontal Termination Direct Vent ONLY The vent must rise verticall...

Страница 9: ...ictor Plate Vertical Terminations must be within this area Unacceptable Venting Con guration Restrictor Plate Adjustment for Extended Pipe Runs The Stardance stove is shipped with a restrictor plate i...

Страница 10: ...exterior wall or siding Horizontal vent runs must be level toward the vent termination Clearances around the vent termination must be maintained For installations using Simpson DuraVent pipe parallel...

Страница 11: ...t outlet 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh...

Страница 12: ...Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible and noncombustible exteriors G Combustible 6 152 mm Noncombustible 2 51 mm F Combustible 6 152...

Страница 13: ...Chimney Conversion Kit Kit A 6 8 46DVA KCA Kit B 6 10 46DVA KCB Kit C 6 13 46DVA KCC Masonry Chimney Conversion Kit 46DVA KMC Vertical Termination Cap High Wind 46DVA VCH Vertical Termination Cap Low...

Страница 14: ...pe Ring 1 Hardware Package Vertical Termination Kit 7 12 12 12 Pitch 7TDVSKVB 1 7 12 12 12 Flashing and all of the other Vertical Termination parts Vertical Termination Flat Roof 7DVSKVF 1 Flat Flashi...

Страница 15: ...the rheostat tightening with a wrench Do not over tighten Attach the control knob to the rheostat shaft Use the wire tie to secure the fan and rheostat wire harnesses together ST473 Fan parts 2767 FK2...

Страница 16: ...rter pipe assembly listed on Page 7 slide the inner section out to allow access Run a bead of sealant around the bottom end of the starter pipe and attach the assembly to the stove using three 1 4 20...

Страница 17: ...se approximately one quarter turn to lock in place The outlet end of the adapter is standard DIRECT TEMP construction For connection of Direct Temp to units with 4 x 7 ue outlets the following methods...

Страница 18: ...with the screws provided and caulk the joint with weatherproof sealant 11 For CFM only Install Charcoal Gray Pipe Rings 7FSDRG or Polished Brass Pipe Rings 7FS DRP at pipe joints if desired ST215 mea...

Страница 19: ...10 x 10 254 x 254mm 4 Plumb any additional opening through the roof or other construction that may be needed In all cases the opening must provide a minimum of 1 25 mm clearance to the vent pipe 5 Pla...

Страница 20: ...n the outer wall of the inlet end which are designed to Twist Lock into place upon attachment to the appliance outlet Align the adapter indentations with the entry slots of the appliance outlet and sl...

Страница 21: ...gth Appliance Adapter AAV ST924 Vertical Venting Gasket Lock Tab Inlet End Outlet End ST922 To Termination To Appliance Fig 33 Joint connection Fig 34 Selkirk Venting Components Pipe Length Appliance...

Страница 22: ...the offset support band to the pipe with two 8 x 1 4 sheet metal screws minimum and secure the offset support straps to surrounding structure Fig 37 Nail to top of framing Offset Support Strap Offset...

Страница 23: ...liance Plan for a level to 1 4 per foot rise 6 mm per 305 mm from inlet to outlet in the horizontal system if not speci ed by the appliance manufacturer Horizontal runs should be supported every 4 122...

Страница 24: ...ot back ll Ensure that grade level slopes away from the building Fig 39 Vertical Installation Fig 43 1 Determine the location of the appliance Choose a location which provides adequate clearance from...

Страница 25: ...und the pipe covering the sides and upper ares of the ashing base with roo ng material How ever be sure the lower unnailed portion of the base covers the roo ng material 14 Position the storm collar a...

Страница 26: ...h their seams if any toward the wall sections usually do not need to be fastened at each joint other than slip sections If the layout includes a slip section this should be the last section of pipe vi...

Страница 27: ...48 Position the log over air hole in ember bed 4 Install the right log by mating the notch on the bottom of the log with the raised notch on the ember bed Fig 48 Position the log over air hole in emb...

Страница 28: ...nada consult the local authority and CSA B149 1 installation code Always check for gas leaks with a mild soap and water solution Do not use an open ame for leak testing Light the pilot according to th...

Страница 29: ...ast iron bosses Control Door Bottom tabs engage notch in the leg ST474 Fig 52 Install the front plate This completes assembly of the Stardance stove Operation The Stardance is operated with the front...

Страница 30: ...ob for SIT valve LO H I FP390 FLAME ADJUSTMENT KNOB 11 21 96 Turn counterclockwise to increase flame height Turn clockwise to decrease flame height Flame Characteristics It is important to periodicall...

Страница 31: ...c tions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS...

Страница 32: ...E This pilot burner assembly utilizes both a thermocouple and a thermopile The thermocouple operates the main valve operation On and Off Clean and or adjust pilot for maximum ame impingement on thermo...

Страница 33: ...ition the transmitter will now control the main valve ame modulation level and fan control 7 If the manual switch is in the LOCAL position the valve will be at the highest xed pressure setting and the...

Страница 34: ...ecognition process to occur between the receiver valve and transmitter 3 Use functions as described in TRANSMITTER sec tion Troubleshooting 1 Locate LED light on valve 2 LED will blink after every val...

Страница 35: ...Yes Local Path If manual switch is set to LOCAL did main burner light and fan turn on Move switch from local to remote Press any key on transmitter Move switch back to local Turn pilotstat knob to PI...

Страница 36: ...dis play the room and tempera ture setting Auto Path Move switch from LOCAL to REMOTE Press any key within 30 seconds If the setting is above room temperature on the transmitter does the main valve an...

Страница 37: ...ches at the top left and right corners of the glass frame Page 42 Fig 76 3 Pull the top edge of the glass and frame assembly away from the rebox face Place the assembly out of the way on a at padded s...

Страница 38: ...cation 2 Replace pilot ori ce Pilot Type 1 Remove pilot hood by lifting up Fig 67 Do not remove snap ring to remove pilot hood NOTE It is not necessary to remove the pilot tube for conver sion Remove...

Страница 39: ...d When burner is slid into place the three 3 pem studs should slide down through clearance holes into the bottom of the control panel 2 Thread and tighten 3 8 nuts back onto pem studs on underneath si...

Страница 40: ...ut BTU h Model Kit Ori ce Part Minimum Maximum SDDVT 20012903 20 000 SDDVTC 20012905 38 101 20009310 22 000 28 000 Table 2 Injector Ori ce Size Matrix Conversion to LP Input BTU h Model Kit Ori ce Par...

Страница 41: ...keep the painted surfaces looking new Use high temperature stove paints available through your local dealer to touch up areas as needed Clean areas to be painted with a wire brush and be sure to cove...

Страница 42: ...ibed ST179 glass gasket detail 11 99 ST179 Fig 77 Wrap the gasket material around the outside iedge of the glass Inspect the Vent System Annually Have the vent system inspected annually by a quali ed...

Страница 43: ...LACED IT MUST BE REPLACED WITH TYPE SF 2 200 C WIRE OR ITS EQUIVALENT FAN JUNCTION BOX FAN POWER CORD Strain Relief Chassis Ground BLK GRN GRN WHT ON OFF Rheostat Chassis Ground RHEOSTAT SNAPSTAT BOX...

Страница 44: ...41 7 8 36 17 18 31 1d 1 2 16 19 34 37 13 14 15 28a b 29a b 50 51 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any...

Страница 45: ...8 19 Valve Gas Honeywell Convertible RFN RV8310E 20003719 20a Pilot Assembly 3Way N DV RN 0 199 706 10002264 Pilot Assembly 3Way N DV RP 0 199 703 10002265 20b Pilot PSE NA175 20001115 Pilot PSE LP175...

Страница 46: ...o LP SDDVTC Series Kit 20012904 Conversion Kit LP to NG SDDVT Series Kit 20012903 Conversion Kit LP to NG SDDVTC Series Kit 20012905 Shell Enamel Part Numbers Color Top Left End Right End Front OP Lef...

Страница 47: ...re IMTFK Wall mounted thermostat control Screen Kit An optional screen S30SK for use with the operable doors is available to allow the doors to be left in the open position Warming Shelf Warming shelv...

Страница 48: ...48 Stardance Direct Vent Natural Vent Gas Heater 20012734...

Страница 49: ...49 Stardance Direct Vent Natural Vent Gas Heater 20012734...

Страница 50: ...50 Stardance Direct Vent Natural Vent Gas Heater 20012734...

Страница 51: ...Any labor and related repair charges relating to the cost and expenses of replacing or repairing defective components under the Limited Lifetime Warranty are not covered except as provided for under...

Страница 52: ...2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: