background image

- 14 -

 STEP 7

Support the horizontal pipes every 36 inches (914mm) with
metal pipe straps.  Make sure that the horizontal vent pipe
is installed on a level horizontal plane.

 STEP 8

Recheck the fireplace to make sure that it is levelled,
properly positioned, and nailed or screwed to the floor.

If applied, the fireplaces adjustable frame drywall strips
(nailing flanges) should be fastened.  See "Framing &
Finishing.

Fig. 24

DO NOT BACK FILL AROUND SNORKEL.
SOIL SHOULD NOT BE LESS THAN 4"
(100mm) BELOW SNORKEL.

BELOW GRADE INSTALLATIONS

When it is not possible to meet the required vent terminal
clearances of 12 inches (305mm) above grade level a
model 7DVSKS vent kit is required.  It allows installation
depth of down to 7 inches (178mm) below grade level.  The
7 inches is measured from the centre of the horizontal vent
pipe as it penetrates through the wall.

If venting system is installed below ground,
we recommend a window well with adequate
and proper drainage.

INSTALLATION

Ensure sidewall venting clearances are observed.

The maximum horizontal run with 24"  (610mm)
vertical rise is 36" (914mm) from the back of the
fireplace to the face of the exterior wall.  See
vent graph (Fig. 18) for extended horizontal run
if the vertical exceeds 24" (610mm).

1.

Establish vent hole through the wall.  See page 12

2.

Remove soil to a depth of approximately 16"
(406mm) below base of snorkel.  Install window well
(not supplied).  Refill hole with 12" (305mm) of
coarse gravel leaving a clearance of approximately
4" (100mm)below snorkel. (Fig. 25)

3.

Install vent system.  See page 12, Steps 2 through
5.

4.

Ensure a watertight seal is made around the vent
pipe coming through the wall.

5.

Apply high temperature sealant caulking (supplied)
around the 4 and 7 inch 7DVSKS's snorkel collars.

6.

Slide into vent pipe and secure to the wall.

7.

Level the soil so as to maintain a 4"
(100mm)clearance below snorkel (Fig. 25).

DRAIN

7DVSKS

(SNORKEL)

GROUND LEVEL

WINDOW

WELL

A MINIMUM OF 24" (610mm)

VERTICAL PIPE MUST BE

INSTALLED WHEN USING

THE 7DVSKS KIT

4" (100mm) MIN. CLEARANCE

Fig. 25

Содержание DVRS3

Страница 1: ...ns If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJU...

Страница 2: ...stallation 12 Below Grade Installations 14 Vertical Through the Roof Applications 15 Vertical Through the Roof Installations 16 DVR Series Crimped End Venting Components 17 ASSEMBLING TWIST LOCK VENT...

Страница 3: ...rds of the high surface temperatures of this fireplace and should stay away to avoid burns or ignition of clothing 3 CAUTION Due to high glass surface temperature childrenshouldbecarefullysupervisedwh...

Страница 4: ...uch paint or lacquer must be heat resistant to prevent discolouration Ref Mantel Width Ref Height from Top Louvre V 10 254 mm A 12 305 mm W 8 203 mm B 10 254 mm X 6 152 mm C 8 203 mm Y 4 101 mm D 6 15...

Страница 5: ...non insulated exterior wall or chase it is mandatory that the outer walls be insulated to conform to applicable insulation codes Non combustible materials such as brick and tile can be extended over...

Страница 6: ...s always best to consult your local authority and the CAN CGA B149 1 or 2 Installation code or for U S A Installations consult the current National Fuel Gas Code ANSI Z223 1 The fireplace valve must n...

Страница 7: ...m minimum B clearance to window or door that may be opened C clearance to permanently closed window minimum 12 inches 305mm recommended to prevent con densation on window D vertical clearance to venti...

Страница 8: ...ith no side wall G Combustible 24 610mm Non Combustible 18 457mm G Balcony with perpendicular side wall H 24 610mm J 20 508mm H J B Recessed Location C Maximum depth of 48 1219mm for recessed location...

Страница 9: ...x 240mm hole through the exterior wall and frame as shown Fig 11 Non Combustible Walls Hole opening must be 7 5 190mm in diameter To locate hole centre consult with appropriate fireplace specificatio...

Страница 10: ...e in the vent system to meet the perimeters identified in the venting graph 7 5 90 2286mm 20ft 6100mm 48 1220mm 305 mm 12 15ft 4572 mm VENT TERMINATION MAXIMUM SIDE VIEW 7DVT90 ELBOW Vertical Dimensio...

Страница 11: ...tical height is 8 ft from fireplace base height If one 90 degree elbow is required in the horizontal vent it must be reduced to 17 ft 120 3048mm 90 elbow 3 7 90 2286mm 84 2134mm Fig 16 SIDE VIEW Fig 1...

Страница 12: ...alls VERTICAL SIDEWALL APPLICATION SEE PAGE 14 FOR VENTING REQUIREMENTS FOR SNORKELS 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17...

Страница 13: ...JUSTABLE ZERO CLEARANCE SLEEVE ADJUSTABLE ZERO CLEARANCE SLEEVE 8 SCREWS 2 8 SCREWS 2 Maximum Length 12 294mm FIRESTOP Fig 22 BEAD OF SILICONE Sealing vent pipe and firestop gaps with hi temperature s...

Страница 14: ...w well with adequate and proper drainage INSTALLATION Ensure sidewall venting clearances are observed The maximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace...

Страница 15: ...un For each 45 elbow used on the horizontal level the maximum horizontal length must be reduced by 18 inches 457mm Example Maximum horizontal length 0 45 elbows 10 ft 3048mm 1 45 elbows 8 5 ft 2590mm...

Страница 16: ...TICAL THRU THE ROOF INSTALLATION Fig 33 If there is a room above ceiling level firestop spacer must be installed on both the bottom and the top side of the ceiling joists If an attic is above ceiling...

Страница 17: ...ical Installation Offsets 90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable le...

Страница 18: ...tinue your system with your 4 7 crimped pipe or elbow apply high temperature sealant on crimped end of pipe at 2 in from end and fasten the next pipe with 3 sheet metal screws 3 When you wish to conti...

Страница 19: ...8 STEP 1 Locate vent opening on wall REAR WALL INSTALLATIONS Minimum clearance between vent pipes and combustible materials in one 1 inch 25 mm on sides and bottom and two 2 inch 50 mm on top FINISHED...

Страница 20: ...ut can be located any where in the vent system to meet the perim eters identified in the venting graph SIDE VIEW MAXIMUM 20 ft 6100mm 90 2286mm VERTICAL DIMENSION 7 5 ft MINIMUM WHEN HORIZONTAL RUN IS...

Страница 21: ...etermine the height of the centre of the horizontal vent pipe exiting through the outer wall Using this dimension on the Sidewall Vent Graph Fig 45 locate the point it intersects with the slanted grap...

Страница 22: ...47 STEP 2 Fig 49 Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length MAXIMUM 12 Adjust sleeve to minimum 9 3 8 x 9 3 8 and attach to firestop with 8 sheet metal scre...

Страница 23: ...allows installation depth of down to 7 inches 178mm below grade level The 7 inches is measured from the centre of the horizontal vent pipe as it penetrates through the wall If venting system is insta...

Страница 24: ...r each 45o elbow used on the horizontal level the maximum horizontal length must be reduced by 18 inches Example Maximum horizontal length 0 45o elbows 10 ft 1 45o elbows 8 5 ft 2 45o elbows 7 ft Fig...

Страница 25: ...upper flange of flashing is below the shingles Fig 62 8 Install appropriate pipe sections until above the flash ing See Fig 59 for s 7 8 and 9 9 Install storm collar and seal around the pipe 10 Add a...

Страница 26: ...5 for Vertical Horizontal Offsets 90o transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable length 7TDVP3566 35 to 64...

Страница 27: ...rcumstances should this appliance be operated without the glass front or with a broken glass front Replacement of the glass with gasket as supplied by the manufacturer should be done by a licenced qua...

Страница 28: ...on the glass It is therefore recommended that the glass be cleaned two or three times with a non ammonia household cleaner and warm water we recommend gas fireplace glass cleaner After that the glass...

Страница 29: ...lass See Glass Re moval section 2 Remove logs from packaging B24 B21 B19 B23 B22 B18 B20 LEFT SIDE VIEW RIGHT SIDE VIEW 3 Place main log manifold side B18 4 Place main log B19 5 Place left log manifol...

Страница 30: ...lowest setting 2 Turn off all electric power to the fireplace if service is to be performed 3 Open control access panel it PILOT O F F O N FOR FIREPLACES EQUIPPED WITH SIT 820 MILLIVOLT GAS VALVE 8 Vi...

Страница 31: ...IEZO IGNITOR GENERATES SPARK ELECTRODE CABLE NOT GROUNDED PILOT STAYS ON FLAME ENGULFING THERMOCOUPLE BY 3 8 THERMOCOUPLE ATTACHED TO VALVE MNIMUM MILLIVOLT OPEN CIRCUIT 18MV CLOSED CIRCUIT 5MV VENT S...

Страница 32: ...ment knob located near the centre of the gas control Fig 71 LO H I Turn counterclockwise to increase flame height Turn clockwise to lower flame height Fig 73 3 8 1 2 FLAME CHARACTERISTICS It is import...

Страница 33: ...33 REPLACEMENT PARTS DVRS3 DVRSL DVRSR FOR FIREPLACES EQUIPPED WITH SIT 820 MILLIVOLT GAS VALVE...

Страница 34: ...1298 12 Pilot Tubing w fittings 53211 53211 13 Manifold Tubing w fittings 57318 57318 14 Thermocouple 53373 53373 15 Thermopile 51827 51827 16 Electrode Ignitor w cable 10001297 10001297 17 Ignitor Pi...

Страница 35: ...ALLED MUST BE ELECTRICALLY CONNECTED AND GROUNDED IN ACCORDANCE WITH LOCAL CODES OR IN THE ABSENCE OF LOCAL CODES WITH THE CURRENT CSA C22 1 CANADIAN ELECTRICAL CODE or for U S A INSTALLATIONS FOLLOWL...

Отзывы: