6. Hang Bay Window Frame assembly over existing glass

frame.

Do not remove existing glass frame

7. Re-install top louvre assembly.

Remove all plastic from brass trims

8. Open the Bottom Bay Louvre door and screw two (2) self

tapping screws (as per step 1 above) to the bottom of the
unit where the hinges were.

9. Bottom brass trim is removable when unit is installed with

marble or tile surround which cover the fireplace bottom.

Fig. 56

CERAMIC REFRACTORY

CERAMIC REFRACTORY

BOTTOM BAY LOUVRE

SCREWS

BAY WINDOW FRAME

BOTTOM

BRASS

TOP LOUVRE

SPACERS

OPTIONAL BAY WINDOW INSTALLATION

for DBR36/DBR39

1. Remove existing bottom louvre and hinges from fire-

place.  (Set aside the two (2) self tapping screws).

2. Remove existing top louvre from fireplace.
3. Remove two (2) pieces of ceramic refractory from Bay

Frame Window; considering that these are very fragile
pieces handle them with special care!

4. Assembly Bay Window Frame to Bottom Bay Louvre by

using four (4) machine screws (from top to bottom), four
(4) nuts (in the bottom) and four (4) spaces (all supplied
with the kit) through the existing four (4) holes in the
bottom of the ay Window Frame and in the top of the
Bottom Bay Louvre.  Spacers to be placed between the
Bay Window Frame and the Bottom Bay Louvre.

5. Insert two (2) pieces of ceramic refractory into the Bay

Window Frame as per drawing below.

Fig. 55

ELECTRICAL BOX

GAS INLET HOLE

INSIDE VIEW

FASTENING 

SCREWS

OUTSIDE VIEW

OPTIONAL EB1 (Receptacle) Hook-Up

The EB-1 Electrical junction box when fitted and
correctly wired gives an easy and convenient power
outlet for the optioal fan kit.

If the EB-1 electrical junction box is being fitted
the fireplace must be electrically connected and
grounded in accordance with local codes or, in
the absence of local codes, with the current CSA
C22.1 Canadian Electric Code.

For U.S.A. installations follow the local codes and
the national electrical code ANSI/NFPA No 70.

It is strongly recommended that the wiring of the
EB-1 Electrical Junction Box be carried out be a
licensed electrician.

Ensure that the power to the supply line has
been disconnected before commencing this
procedure.

To install and connect the EB-1 box to the house
electrical supply follow the steps below.
1.

Disconnect the power to the electrical supply line.

2.

Remove the cover plate over the EB-1 knock-out
the side of the appliance, retain the screw that held
the plate.

3.

Remove the front cover of the EB-1 box.

4.

Remove the plug socket assembly from the EB-1
box.

5.

Feed the electrical supply line in through the EB-1
opening in the side of the appliance and then
through the back of the EB-1 assembly, Fig 55.

6.

Connect the ground wire of the supply line to the
green screw of the socket assembly.

7.

Connect the white wire of the power line to the
chrome screw of the socket assembly.

8.

Connect the black wire of the power supply line to
the brass screw (polarized) of the socket assembly.

9.

Refit the socket assembly back into the electrical
box and replace the front cover plate.  Secure the
cable with the clamp on the outside of the EB-1 base
plate and refit the EB-1 assembly to the appliance
with the screw removed in step 2.

Fig. 54

Black

White
Ground

FAN

TEMPERATURE 
SENSOR

SPEED 
CONTROL

Method B (Using the EB-1 Box.)
For instruction on wiring the EB-1 Electrical Junction Box
see the chapter EB-1 Electrical Box.

Содержание DBR33

Страница 1: ...tric switch do not use any phone in your building Extinguish all flames Immediately call your gas supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS OF LIFE Installation...

Страница 2: ...Graph 13 General Information on Assembling Vent Pipes 13 Vertical Sidewall Installation 14 Below Grade Installations 16 Vertical Through the Roof Applications 16 Vertical Through the Roof Installations 17 Operating Instructions 18 General Glass Information 18 Louvre Removal 18 Glass Frame Removal 18 Glass Cleaning 18 Installation of Logs 19 Ember Material Placement 19 Lava Rock 19 Flame Adjustment...

Страница 3: ...by a qualified service person A profes sional service person should be contacted to inspect this fireplace annually Make it a practice to have all of your gas fireplaces checked annually More frequent cleaning may be required due to excess lint and dust from carpeting bedding material etc 6 Control compartments burners and air passages in this fireplace should be kept clean and free of dust and li...

Страница 4: ...8 606mm I 27 1 2 698mm J 6 1 4 159mm K 8 3 8 213mm L 12 1 2 318mm M 44 1118mm N 62 1 4 1581mm O 31 1 8 790mm ROD 16 1 2 419mm ROW 39 1 2 1003mm ROH 35 889mm FIREPLACE DIMENSIONS Fig 2 DBR36 DBR39 Table 2 Table 3 A 33 838mm B 28 7 8 733mm C 16 3 8 416mm D 31 787mm E 22 1 16 560mm F 111 2 292mm G 14 3 4 375mm H 20 1 4 515mm I 24 1 2 622mm J 5 127mm K 7 1 2 191mm L 8 1 2 216mm M 36 914mm N 51 1295mm ...

Страница 5: ...NCE TO COMBUSTIBLES 1 Choose fireplace location 2 Place fireplace into position and secure to floor with 1 1 2 screws or nails The holes to secure the fireplace to the floor are located just behind the access door grill on the left and right hand side of the fireplace 3 Frame in fireplace with a header across the top It is important to allow for finished face when setting the depth of the frame 4 ...

Страница 6: ...s not obstruct louvre opening GAS SPECIFICATIONS MAX MIN INPUT INPUT MODEL FUEL GAS CONTROL B T U H B T U H DBR33 RN Natural Gas Millivolt Hi Lo 15 000 10 500 DBR33 RP Propane Gas Millivolt Hi Lo 15 000 11 250 DBR36 RN Natural Gas Millivolt Hi Lo 18 000 12 600 DBR36 RP Propane Gas Millivolt Hi Lo 18 000 13 500 DBR39 RN Natural Gas Millivolt Hi Lo 22 000 15 400 DBR39 RP Propane Gas Millivolt Hi Lo ...

Страница 7: ...te to switch 3 Connect wiring to gas valve Fig 8 Fig 8 ALTERNATE SWITCH LOCATION Remote switch can be installed on either side of the access door Simply mount the switch to the switch bracket provided Screw the bracket on either side of the frame lining up the screws with the pre punched holes Fig 9 P I L O T TPTH TP TH THERMOPILE ON OFF SWITCH VALVE DO NOT WIRE MILLIVOLT REMOTE WALL SWITCH FOR GA...

Страница 8: ...sary to use sealant at the twist lock joints The only areas of the venting that need to be sealed with high temperature silicone sealant are the collars on the fireplace and termination and the sliding joint of any telescopic vent pipes used in the system To join the twist lock pipes together simply align the beads of the male end with the grooves of the female end then while bringing the pipes to...

Страница 9: ...vegrade veranda porch deck or balcony 12inches 305mm minimum B clearancetowindowordoorthatmaybeopened 12 306mm C clearancetopermanentlyclosedwindow minimum 12inches 305mm recommendedtopreventcon densationonwindow D verticalclearancetoventilatedsoffitlocatedabove thetermina withinahorizontaldistanceof24inches 610mm fromthecentre lineoftheterminal 18 inches 458mm minimum E clearancetounventilatedsof...

Страница 10: ...lso be used TOP VIEW 20 508mm TOP VIEW CROSS CORNER VENT TO THE LEFT 20 508mm 45 TOP VIEW CROSS CORNER VENT TO THE RIGHT 20 508mm 45 Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible and noncombustible exteriors A Combustible 6 152mm Noncombustible 2 50mm B Combustible 6 152mm Noncombustible 2 50mm A Balcony with no side wall G Combustible No...

Страница 11: ... detail Vent Opening Combustible Wall STEP 4 Slip 4 and 7 pipes onto respective flue collars Make sure to fix to the fireplace collar the 4 pipe with three 3 screws before fixing the 7 pipe on the 7 collar Both pipes must be on a level plane Fig 17 STEP 3 Measure from fireplace collar or elbow face to face of outside wall add 2 for vent pipe overlap Mark pipes and cut to length It is very importan...

Страница 12: ...ocated any where in the vent system to meet the perim eters identified in the venting graph The maximum number of 90 degree elbows per side wall installationis three 3 plusonetransitionelbow 7DVRT90 off back of unit The maximum number of 45 degree elbows permitted per side wall installation is two 2 These elbows can be installed in either the vertical or horizontal run When one 900 elbow is instal...

Страница 13: ... 2 From the point of this intersection draw a vertical line to the bottom of the graph 3 Select the indicated dimension and position the fireplace in accordance with same EXAMPLE A If the vertical dimension from the floor of the unit is 11 feet 3352mm the horizontal run to the face of the outer wall must not exceed 14 feet 4267mm EXAMPLE B If the vertical dimension from the floor of the unit is 7 ...

Страница 14: ...n combustible cut opening to size Fig 25 For combustible walls first frame in opening VERTICAL SIDEWALL INSTALLATION VERTICAL SIDEWALL APPLICATION STEP 2 Fig 26 Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length MAXIMUM 12 305mm Adjust sleeve to minimum 9 3 8 x 9 3 8 and attach to firestop with 8 sheet metal screws supplied Install firestop assembly Zero clearan...

Страница 15: ...eplace STEP 5 Fig 29 Use the appropriate length of pipe section telescopic or fixed and install The 20 508mm section of pipe which goes through the wall is packaged with the 7DVSK kit and can be cut to suit if necessary STEP 6 Fig 30 Apply high temperature sealant to 4 and 7 collars one inch away from crimped end Guide the vent termination 4 and 7 collars into their respective vent pipes Double ch...

Страница 16: ...erved The maximum horizontal run with 24 610mm vertical rise is 36 914mm from the back of the fireplace to the face of the exterior wall See vent graph Fig 21 for extended horizontal run if the vertical exceeds 24 610mm 1 Establish vent hole through the wall See page 14 2 Remove soil to a depth of approximately 16 406mm below base of snorkel Install window well not supplied Refill hole with 12 305...

Страница 17: ... 7 8 and 9 8 Install storm collar and seal around the pipe 9 Add additional vent lengths for proper height 10 Apply high temperature sealant to 4 and 7 collars of vent termination and install VERTICAL THRU THE ROOF INSTALLATION Fig 38 If there is a room above ceiling level firestop spacer must be installed on both the bottom and the top side of the ceiling joists If an attic is above ceiling level...

Страница 18: ...s 3 Under no circumstances should this appliance be operated without the front glass or with a broken glass Replacement of the glass with gasket as supplied by themanufacturershouldbedonebyalicencedqualified service person LOUVRE REMOVAL Fig 41 Fig 38 It will be necessary to clean the glass periodically During start up condensation which is normal forms on the inside of the glass and causes lint d...

Страница 19: ...ny part of the burner assembly front logs Do NOT pack down leave in fluffy loose condition for most realistic ember effect EMBER MATERIAL PLACEMENT Separate the ember material into small pieces roughly 1 2 in diameter and place onto the burner in front of the INSTALLATION OF LOGS Fig 43 FLAME ADJUSTMENT For fireplaces equipped with Hi Lo valves flame adjust ment is accomplished by rotating the Hi ...

Страница 20: ...dically perform a visual check of the pilot and the burner flames Com pare them to the pictorials illustrated below Fig 47 48 49 and 50 If any of the flames appear abnormal call a service person INSPECTING THE VENTING SYSTEM This appliance venting system was designed and constructed todevelopapositiveflowadequatetoremovefluegasestothe outside atmosphere Any foreign objects in the venting system ex...

Страница 21: ...lass Frame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counterclockwise to PILOT C Use only your hand to push in or turn the gas control knob Never use tools If the knob will not push in or turn by hand do not try to repair it call a qualified service technician Applying force or any attempted repair may result in a fire or explosion D Do not use this fir...

Страница 22: ...PIEZO IGNITOR GENERATES SPARK ELECTRODE CABLE NOT GROUNDED PILOT STAYS ON FLAME ENGULFING THERMOCOUPLE BY 3 8 THERMOCOUPLE ATTACHED TO VALVE MNIMUM MILLIVOLT OPEN CIRCUIT 18MV CLOSED CIRCUIT 5MV VENT SAFETY SWITCH TIGHT AND NO SHORTS FOR UNITS EQUIPPED WITH VENT SAFETY SWITCH MAIN BURNER ON REMOTE SYSTEM ON REMOTE SYSTEM WIRE SHORTING OUT MINIMUM MILLIVOLT OPEN CIRCUIT 300MV CLOSED CIRCUIT 165MV F...

Страница 23: ...ES THERMOPILE NEEDS A MINIMUM 325mV ADJUST PILOT FLAME HEIGHT ALL WIRING CONNECTIONS REPLACE THERMOPILE THERMOCOUPLE NEEDS A MINIMUM OF 14mV DEFECTIVE VALVE TURN TO PILOT METER SHOULD READ GREATER THAN 100 mV IF NOT REPLACE THERMODISK PILOT LIGHTS WITH PIEZO IGNITOR YES YES YES YES PILOT STAYS LIT PILOT LIGHTS MAIN BURNER SYSTEM OK START CHECK WALL SWITCH IS NOT TURNED ON WATCH FOR GROUNDED WIRES ...

Страница 24: ...2464 52464 52464 16a Valve Nova 820 RN 52677 52677 52677 16b Valve Nova 820 RP 52678 52678 52678 17 Fan with bracket 54103 54103 54103 18 Electrical Cord 6ft 51865 51865 51865 19 Fan Temperature Sensor 51704 51704 51704 20 Speed Control 51738 51738 51738 21 Speed Control Knob 51882 51882 51882 22 Glass with Gasket 10000481 55686 57437 23 Gasket Glass 57317 57317 57317 24 Frame Window 53690 54113 5...

Страница 25: ... b 15 13 9 8 a b 12 11 14 a b 27 28 29 26 26 25 17 19 16 a b 7 a b 30 2 3 24 32 31 4a b 5 10 34 a b 8 a b 35 36 37 38 1 COMPLETE LOG SET 1 COMPLETE LOG SET DBR36 DBR39 1 COMPLETE LOG SET DBR33 13 REPLACEMENT PARTS REAR BUILDERS SERIES P I L O T ON OFF PILOT ADJ L O H I TPTH TH TP ...

Страница 26: ...mbly and other components are supplied fully wired eliminating the need for a licensed electrician to carry out the installation If hard wiring the fan using Method B following we strongly recommend the use of a licensed electrician 1 Open the lower Louvre assembly Maneuver the fan bracket assembly around the gas valve and lines to locate the unit onto the screw studs on the back of the fireplace ...

Страница 27: ...the optioal fan kit If the EB 1 electrical junction box is being fitted the fireplace must be electrically connected and grounded in accordance with local codes or in the absence of local codes with the current CSA C22 1 Canadian Electric Code For U S A installations follow the local codes and the national electrical code ANSI NFPA No 70 It is strongly recommended that the wiring of the EB 1 Elect...

Страница 28: ...support TOP TRIM SUPPORT BOTTOM TRIM SUPPORT MAIN FRAME Fig 57 1 Remove glass and logs 2 Place refractory side supports so that the hole fits over the screw head on the firebox floor 3 Place refractory base sides on the floor of the firebox 4 Place back refractory small brick edge down into support See Fig 59 5 Attach adjustable tabs packed with refractory onto the studs found on the top of the fi...

Страница 29: ...ets 7DVR45 for Rear Vent Application 90º transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP1864 18 to 34 adjustable length 7DVP3466 34 to 66 adjustable length Pipe sections for vertical or horizontal venting Model 7DVP8 4 per box Model 7DVP12 4 per box Model 7DVP24 4 p...

Страница 30: ...rtical Installation Offsets 7TDR45 for Rear Vent Application 90º transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable length 7TDVP3566 35 to 64 adjustable length Pipe sections for vertical or horizontal venting Model 7TDVP8 Model 7TDVP12 Model 7TDVP24 Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS Attic In...

Страница 31: ... 31 ...

Страница 32: ...foyer au gaz CFM Majestic Inc contre tous défauts de fabrication et de matières premières pour une période d un an à compter de la date d installation sujet aux conditions et limitations suivantes GARANTIE A VIE PROLONGEE Les pièces de l échangeur de chaleur de la chambre à combustion et du brûleur en céramique de tout produit CFM Majestic Inc sont garanties pour la vie de l acheteur d origine le ...

Отзывы: