background image

16

Vermont Castings Aspen

®

 II Multi-Fuel

30003892

can fail to retain sufficient heat to enable the coal to 
combust correctly (particularly with harder grades of 
solid fuel) and can result in the fire going out during 
longer low output burns (e.g. overnight).

5. When the fire is fully established close the damper 

and set the primary air control lever to provide the 
desired output.

refuel while the coals are Still hot

Refuel the stove whilst it is still hot and there are plenty 
of glowing ashes to rekindle the fire.
Wear appropriate heat resistant protective gloves and:
1. Open the primary air control lever.
2. Open the damper.
3. Check the ash level in the pan and empty if neces-

sary.

4. Use the shaker grate to riddle the coal bed, causing 

the ash to fall through into the ash pan. (Fig. 22)

5. Add fuel, taking care not to allow fuel to overflow the 

front grate bars.

6. Close the damper and rest the primary air control as 

soon as the fire is fully reestablished.

operating the Shaker grate

1.  The shaker grate is operated by use of the multi-

function tool.

2.  Locate the hook on the multi-function tool through 

the hole in the shaker bar. (Fig. 22)

3.  Move the shaker bar in a front to back motion to 

shake free any ash deposited on the grate bars.

ash disposal

Remove ash before it reaches the top of the ash pan. 
Check the level at least once a day, and before each 
refuelling. If the ash level is close to the top of the pan, 
empty the ash pan as described below: Failure to do 
this will result in premature failure of the shaker bars 
due to excessive temperatures caused by ash build up.

cautioN:

 Wear suitable heat resistant protective 

gloves.
1.  Open the damper.
2.  Fully open the front doors.
3.  Using the slicer, pull the ash pan fully out of the 

stove, the slicer locates under the lip in the front of 
the ash pan. This provides a secure location and 
allows the slicer to act as a handle for the ash pan. 
(Fig. 23)

4. Remove the ash pan and dispose of the ashes safely
5. Replace the ash pan in the stove.
Ash should be stored outside in a metal container with 
a tight fitting lid, away from any combustible material 
until fully cool. 

it is essential to ensure that any ash 

is fully cooled before final disposal.

Pure wood ash can be composted and used as a 
garden fertiliser. Coal and solid fuel ash, or mixed ash 
should be disposed of with domestic refuse.

34
SHAKERGRATE

Shaker Bar

Multi-function Tool

ST884

fig. 22

  Attach the multi-function tool to the shaker bar.  Move 

the shaker bar forwards and backwards.

ST265

ash pan

12/99

ST265

fig. 23 

 Primary air outlet - keep clear of ash and charcoal 

accumulation.

Ash Pan

Содержание Aspen II 1405C

Страница 1: ...risk of fire follow the installation instructions Failure to follow instructions may result in property damage bodily injury or even death Contact local building officials about restrictions and inst...

Страница 2: ...ove you are making a strong statement for pollution free energy But clean burning depends on both the manufacturer and the operator Please read this manual carefully to understand how to properly oper...

Страница 3: ...eated up to 65 sq m 700 sq ft Loading Front or top Chimney connector 152 mm 6 diameter Chimney flue size 152 mm 6 minimum Flue exit position Reversible top or rear Primary air Manual set thermostatica...

Страница 4: ...ng those referring to national and European standards need to be com plied with when installing this stove Outside Air In some modern super insulated homes there is not enough air for combustion becau...

Страница 5: ...stove to the chimney Connecting Flue Pipes Connector pipes should meet the requirements of the building regulations This can be achieved by the use connecting fluepipes included in the following cate...

Страница 6: ...ap tors attaches directly to the chimney or to the chimney s ceiling support package while the bottom of the adap tor is screwed to the chimney connector These adaptors are designed so the top end wil...

Страница 7: ...guidelines mentioned above for freestanding installations In addi tion give special consideration to the following points Check the clearance between the stove and the chimney connector and any combu...

Страница 8: ...nt because the brick or concrete in front of the fireplace opening is supported by heavy wood framing as in Figure 8 Because heat passes through brick or concrete readily it can easily pass through to...

Страница 9: ...lid noncombustible surfaces e g the sides and rear of Inglenook fire openings constructed from solid masonry other than to allow safe access to the controls of the stove For this reason minimum side c...

Страница 10: ...levation With Shield a t l e a s t 3 x D at least 1 5 x D at least 1 5 x D Plan Without Shield Plan With Shield Air space of at least 12 mm between noncombustible shield and combustible material Fluep...

Страница 11: ...ents from the stove before lifting it to its final position Follow the Grate Removal instructions on Page 21 34 Poker Slicer ST878 Fig 12 Remove poker slicer from its shipping position Install Door Ha...

Страница 12: ...ondary combustion occurs in the secondary com bustion chamber in the rear of the firebox The high temperatures attained in this area encourage further burning of the volatile gases in the smoke reduci...

Страница 13: ...sed 34 DAMPER CONTROLS Damper Open Damper Closed ST882 Fig 17 Damper positions The Glass Door Panel The glass panel used in the door of this stove features a heat reflective coating on the outside sur...

Страница 14: ...or this stove and will give the best output and cleanliness in use As a rough guide hardwoods should be split and stacked and allowed to air dry under cover for 8 18 months depending on the split size...

Страница 15: ...s to fall away into the ash pan 5 Add fuel 6 Close the damper and rest the primary air control as soon as the fire is re established With a thick ember bed and well seasoned wood this may be carried o...

Страница 16: ...ee any ash deposited on the grate bars Ash Disposal Remove ash before it reaches the top of the ash pan Check the level at least once a day and before each refuelling If the ash level is close to the...

Страница 17: ...stove s flue outlet When a chimney Draft Management serves an airtight stove more is not better in fact it can be a disadvantage Hot gases cool off through expansion if we vent a stove with a 152 mm...

Страница 18: ...you should open up the damper to let the smoke rise to the flue more quickly let more air into the firebox and avoid big loads of firewood Run your stove with enough primary air so that you always see...

Страница 19: ...ion Overtightening can crack the glass immediately or cause it to crack if it is unable to expand when hot Maintenance Let the fire in the stove go out and allow the stove to cool completely before be...

Страница 20: ...ss the gasketed part firmly against its normal mating surface to seat the gasket evenly in its ST559 Remove gasket 11 30 00 djt Cement Stove Gasket ST561 Fig 26 Lay a bead of gasket cement then press...

Страница 21: ...sote or soot in the fluepipe connector secondary combustion chamber and inte rior of the stove As a general guide if deposits are 3mm or greater in thickness they should be cleaned off using a stiff b...

Страница 22: ...Secondary Combustion Chamber Firebricks and Damper Assembly 1 The damper assembly is retained by two tab bolts These must first be loosened from both sides of the upper rear face of the stove 2 When l...

Страница 23: ...ifications prices and discontinue colors and products at any time without notice Aspen II Multi Fuel Heater Model 1405CE 3892 Aspen II MF parts 6 07 1 2 3 8 9 12 13 19 10 11 14 14 14 15 17 18 16 21 20...

Страница 24: ...ebrick Side 30002200 21 Lower Fireback 30002107 22 Left Vertical Manifold 30002186 23 Front Linkage 30002150 24 Linkage 30002147 25 Label 1601223 26 Grate 30002116 27 Ashpan 30002130 28 Right Vertical...

Страница 25: ...l hardware stores Stove Serial No __________________________ Dealer _________________________________ ________________________________________ ________________________________________ Phone __________...

Страница 26: ...26 Vermont Castings Aspen II Multi Fuel 30003892...

Страница 27: ...ed catalyst Exclusions Limitations 1 This product must be installed or serviced by a qualified installer preferably NFI or WETT Canada certified as prescribed by the local jurisdiction It must be inst...

Страница 28: ...MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com...

Отзывы: