2.10
REMOVING & REFITTING OF THE GLASS FRAME.
2.10.1
Remove the 2 screws which hold the convection slot cover to the
firebox, as shown below in Fig 11
2.10.2
Remove the burner heat shield by unscrewing the 2 off retaining screws
as shown below in Fig. 11
2.10.3
Remove the 4 off M5 retaining nuts as shown below in Fig. 11
2.10.4
Remove the 3 off top retaining screws as shown below in Fig. 11
2.10.5
Remove the 2 off bottom retaining screws as shown below in Fig. 11
2.10.6
Re-assemble in reverse order.
NOTE : Always ensure that a consistent seal between the combustion
chamber and the glass frame is achieved.