2.0
Installation
2.1
Unpacking and Handling
When unpacking or moving the product always lift it by its base or by both ends of the
main body. Never lift it by its work tube or the surrounding insulation. Use two or more
people to carry the product and control box. Remove any packing material from inside
the product before use.
If an optional or special stand is separately supplied, assemble the product on to it.
Some models may be supplied for customer mounting and may require customer
preparation of mounting components before installation.
NOTE: This product contains Refractory Ceramic Fibre (also known as
Alumino Silicate Wool - ASW). For precautions and advice on handling
this material see section 8.2.
2.2
Siting and Setting Up
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
Work tubes:
It is recommended that the work tube has either insulation plugs or
radiation shields fitted to minimise heat loss from both ends of the work
tube. If the work tube has open ends, a significant amount of energy
could be radiated from the ends of the work tube. Adjacent surfaces
should always be made from a non-flammable material.
Ensure that the ends of the work tube are positioned
at least 500 mm
away from any adjacent surface so that any energy radiated cannot heat
an adjacent surface to a dangerous temperature.
7
2.0 Installation
Содержание CARBOLITE GERO TZF 16/90/610
Страница 6: ...1 0 Symbols and Warnings Caution Double Pole Neutral Fusing 6 ...
Страница 50: ......
Страница 51: ...Notes Service Record Engineer Name Date Record of Work ...