2.0
Installation
2.1
Unpacking and Handling
When unpacking or moving the product always lift it by its base. Do not use the door or
any other protruding parts. The product contains a transformer and is heavy: use two
or more people to carry the product.
Some models may alternatively be lifted by fitting lifting bolts to captive threads in the
top of the case.
Remove any packing material.
NOTE: This product contains Refractory Ceramic Fibre (also known as
Alumino Silicate Wool - ASW). For precautions and advice on handling
this material see section 8.2.
2.2
Siting and Setting Up
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
7
2.0 Installation
Содержание CARBOLITE GERO BLF 18/3
Страница 38: ...4 0 3508 Dual Loop Cascade Power Limit View 38 ...
Страница 59: ...10 0 Wiring Diagrams 10 1 195 1 1013 59 10 0 Wiring Diagrams ...
Страница 61: ...Please refer to the rating label for product specific information 61 11 0 Fuses and Power Settings ...
Страница 63: ...Notes Service Record Engineer Name Date Record of Work ...