![VERDER CARBOLITE GERO 195-1-1013 Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/verder/carbolite-gero-195-1-1013/carbolite-gero-195-1-1013_installation-operation-and-maintenance-instructions_1003611018.webp)
Function
Temperature Calibration
Tested using certified equipment, frequency
dependent on the standard required
Operational Check
Check that all functions are working nor-
mally
Operational Check
Thorough inspection and report incor-
porating a test of all functions
Performance
Element Circuit
Electrical measurement
Power Consumption
Measure the current drawn on each phase /
circuit
18
Содержание CARBOLITE GERO 195-1-1013
Страница 29: ...8 0 Wiring Diagrams 8 1 195 1 1013 29 ...
Страница 33: ...Notes Service Record Engineer Name Date Record of Work ...