Installation V610-Oslo
A V610-Oslo with a width above the 5 meter must be linked.
Attention!
Link exactly above the heart of the click frames.
(See Figure 2)
1 Mounting the feet and side guides
• Mount the feet on the veranda roof. The feet are placed in the middle of the guides.
We advise to place the upper foot 100 mm from the bin, at the bottom also around 1000 mm from the bottom of the
profile
(See Figure 4 and 5)
• Slide the high foot in the side guide and mount the side guide to the foot on the veranda roof.
(See Figure 3)
Attention!
We advise to place a intermediate roll with a projection larger than 3500 mm.
Also mount the fabric roll supports in the side guide.
(See Figure 1 and 3)
•
After all the side guides are mounted, you need to make sure that all side guides are measured equal both parallel and
diagonal.
(See Figure 6)
• Slide the V610-Oslo in the side guides.
Important before installation
Be careful for damages
Don’t use a knife or any other sharp object when opening the packing. This may cause damage to the content of the
package. Put the content of the package on a soft surface.
Be careful when drilling, falling drill cuttings can cause damages.
General warning
Installing the Verano® product yourself is at your own risk. Only use this instruction as a tool and for the installation of
this specific Verano® product. If you cannot install the product yourself, you can always opt for professional installation.
The installation team of Verano® is pleased to help you.
Necessary tools
• Drilling machine
• Metal drill 3,5 mm
• Stitch- or ring wrench 10 mm
• Crosshead screwdriver
• Allen key set
• Ladder
• Tapeline
• Level
• cord
• Pencil
• Plastic hammer
• Installation manual