SECTION
DATE
SUPERSEDES
TITLE
ET6/8/12 SERIES CRANES
C200
03-08-19J
07-30-18H
INSTALLATION DWG
900530A
CRANE OPERATION AND MAINTENANCE INSTRUCTIONS
SAFETY
Before operating this crane, read and understand these instructions, the "CRANE SAFETY AND
HAZARDS" pages, and review all safety and instruction labels on the crane.
CRANE INSPECTION
Before operating this crane, inspect for wear, damage, and oil leakage. After the wire rope has
been run out, check for wear, kinks, and broken strands. Check the hook and safety latch for
damage. Correct problems before using the crane.
CAPACITY
Before operating this crane, review the capacity charts on the sides of the boom to relate the load
to be lifted to the boom length and angle. The boom angle is indicated by a gravity arrow.
LOAD BLOCK
If the load exceeds:
1000 lbs. for the ET6K, or
1600 lbs. for the ET8 Series and ET10K(X), or
1750 lbs. for the ET12 Series,
or if reduced winching speed for better control of smaller loads is required, use the load block to
rig the crane for two-part line operation. Refer to your crane's "MAXIMUM LOAD CAPACITY"
page within this manual.
CONTROLS
This crane is operated by a remote control pendant. The pendant should be unplugged and
stored in a compartment or the cab when the crane is not in use.
Before plugging the pendant in, inspect the plug, socket, cord, oandant head, and switches for
damage. Actuate all switches in both directions to verify that they all have the same feel and
sound, and that they return to the center position.
Plug the pendant into the socket on the right side of the crane and, if applicable, snap the strain
relief tether to the crane housing.
Turn on the Master Disconnect Switch. Use "WINCH DOWN" to release tension on the wire rope
and unhook it from the storage tie-down position.
Use "BOOM UP" to elevate the boom from the boom rest position.
Check all control functions to see that they are working correctly.
®
VENCO VENTURO INDUSTRIES LLC
CINCINNATI, OHIO
Содержание ET12KP-16
Страница 2: ......
Страница 4: ......
Страница 5: ...TFDUJPO 100 EFTDSJQUJPO TQFDJGJDBUJPOT 7607100B...
Страница 14: ......
Страница 15: ...SECTION 150 SAFETY 8604150...
Страница 23: ...SECTION 200 INSTALLATION 7607200A...
Страница 30: ......
Страница 31: ...SECTION 300 MAINTENANCE SERVICE 7607300A...
Страница 39: ...SECTION 400 PARTS 7607400A...
Страница 63: ......