HUMIDITY SENSOR MOUNTING IN THE EXTRACT AIR DUCT
CAUTION!
The humidity sensor must be installed in the air duct prior to the unit mounting.
HV1 humidity sensor mounting sequence:
•
Remove the screws that retain the panel on side of the extract spigot and remove it.
•
Place the humidity sensor in the mount.
•
Connect the humidity sensor connector to the connector with a cable from the control unit. The connector is mounted by the
manufacturer.
HV2 humidity sensor mounting sequence:
•
Remove the screws that retain the panel on side of the extract spigot and remove it.
•
Place the humidity sensor in the mount.
•
Connect the humidity sensor connector to the connector with a cable from the control unit. The connector is mounted by the
manufacturer.
Extract
air duct
9
www.ventilation-system.com
VUT/VUE 200/250 V(B) EC
MOUNTING AND SET-UP
ПЕРЕД МОНТАЖОМ ИЗДЕЛИЯ ВНИМАТЕЛЬНО ОЗНАКОМЬТЕСЬ
С РУКОВОДСТВОМ ПОЛЬЗОВАТЕЛЯ
Содержание VUT V EC A11 Series
Страница 20: ...20 VUT VUE 200 250 V B EC www ventilation system com ...
Страница 21: ...21 www ventilation system com VUT VUE 200 250 V B EC ...
Страница 22: ...22 VUT VUE 200 250 V B EC www ventilation system com ...
Страница 24: ...V106 5EN 04 ...