Vents RO 100 Скачать руководство пользователя страница 3

3

EN

This user’s manual is a main operating document intended for technical, maintenance, and operating staff.
The manual contains information about purpose, technical details, operating principle, design, and installation of the RO/SO 
unit  and all its modifications.
Technical and maintenance staff must have theoretical and practical training in the field of ventilation systems and should 
be able to work in accordance with workplace safety rules as well as construction norms and standards applicable in the 
territory of the country.
The information in this user’s manual is correct at the time of the document’s preparation.
The Company reserves the right to modify the technical characteristics, design, or configuration of its products at any time 
in order to incorporate the latest technological developments.
No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means in any 
information search system or translated into any language in any form without the prior written permission of the Company.

READ THE USER’S MANUAL CAREFULLY BEFORE PROCEEDING WITH INSTALLATION WORKS.

COMPLIANCE WITH THE MANUAL REQUIREMENTS ENSURES RELIABLE OPERATION AND LONG 

SERVICE LIFE OF THE UNIT.

KEEP THE USER’S MANUAL AVAILABLE AS LONG AS YOU USE THE UNIT. YOU MAY NEED TO RE-READ 

THE INFORMATION ON THE PRODUCT SERVICING.

Содержание RO 100

Страница 1: ...AXIAL FAN User s manual www ventilation system com RO SO EN...

Страница 2: ...description 7 Operation guidelines 8 Designation key 9 Mounting and set up 10 Connection to power mains 12 Electronics operation algorithm 14 Technical maintenance 15 Storage and transportation regula...

Страница 3: ...at the time of the document s preparation The Company reserves the right to modify the technical characteristics design or configuration of its products at any time in order to incorporate the latest...

Страница 4: ...ion and maintenance The present user s manual should be carefully read before beginning works Single phasepowermainsmustcomplywiththeactinglocalelectrical norms and standards Fixed electrical wiring m...

Страница 5: ...e carbon monoxide and other combustion products into the room through open chimney flues or other fire protection devices Sufficient air supply must be provided for proper combustion and exhaust of ga...

Страница 6: ...put objects on it The unit is allowed to be used by children aged from 8 years old and above and persons with reduced physical sensory or mental capabilities or no experience and knowledge provided t...

Страница 7: ...described herein is an axial fan for exhaust ventilation of small to medium sized premises heated during winter The fan design can also include a non return valve to prevent back flow when the fan is...

Страница 8: ...in the system must match the pointer on the fan casing Ingress protection rating against access to hazardous parts and water ingress is IP24 The fan is rated for operation at the ambient temperature...

Страница 9: ...ll cord switch T timer TH timer and humidity sensor VT pull cord switch timer VTH pull cord switch timer humidity sensor Motor and impeller modifications Turbo high powered motor Q low noise motor 12...

Страница 10: ...fan is designed for wall or ceiling mounting with direct air exhaust to the ventilation shaft or into the round air duct of matching diameter QF L N Unscrew the retaining screw Remove the front panel...

Страница 11: ...ilation hole drill the mounting holes and install the dowels Fix the fan with the screws Connect the fan to the electric mains according to the connections diagram Install the front panel by turning i...

Страница 12: ...V 50 60 Hz or 12 V 50 Hz single phase AC mains depending on the model WARNING The fans rated for 12 V power voltage stated on the packing box and on the fan casing connect to 12 V AC power mains with...

Страница 13: ...H 60 90 H 2min 30min T N QF LT N L L S RO SOVT VTH 60 90 H 2min 30min T N QF LT N L L Terminal designations on the wiring diagram L line LT timer control line S ON OFF switch N neutral QF automatic ci...

Страница 14: ...imer ranging from 2 to 30 minutes To set the maximum humidity setpoint set the potentiometer to Hmax position 90 To adjust the fan timer turn the control knob T clockwise to increase and counter clock...

Страница 15: ...r supply Unscrew the retaining screw Remove the front panel Clean the fan with a soft dry cloth or a brush Wash the front panel under running water Wipe the fan surfaces dry Cover the fan with the fro...

Страница 16: ...nery for handling and storage operations to prevent possible damage to the unit Follow the handling requirements applicable for the particular type of cargo Theunitcanbecarriedintheoriginalpackagingby...

Страница 17: ...air includes work specific to elimination of faults in the unit operation to ensure its intended use by the user within the guaranteed period of operation The faults are eliminated by means of replace...

Страница 18: ...unit warranty period Violation of the unit transportation regulations by the user Violation of the unit storage regulations by the user Wrongful actions against the unit committed by third parties Un...

Страница 19: ...19 EN Quality Inspector s Stamp Manufacture Date Sold by name and stamp of the seller Purchase Date...

Страница 20: ...V209EN 01 Certificate of acceptance The fan is recognized as serviceable RO 100 turbo V L SO 100 12 T K RO 125 Q TH K1 SO 125 press VT VTH...

Отзывы: