BU installation requires:

- to take off BU front panel;
- to choose BU installation position and to outline it with the pencil (pic. 3);
- to make holes for dowels;
- to screw screws into the dowels;
- to mount BU back panel on screws and to move it upwards;
- to fix it;
- to connect BU to supply network (read about connecting to supply network) 
- to make its configuring and set-up (read about configuring and set-up); 
- to mount BU front panel and fix it.

CAUTION

!!

BU mounting holes' design requires BU to be moved upwards during the installing 
and then fixed.

Installation

3

О

130

m

2

0

Moving sensor operative range is 5 m and viewing angle is 130  (pic. 2).

CAUTION

!

BU

Содержание BU-1-60 TF

Страница 1: ...User s Manual BU...

Страница 2: ...afety requirements 7 Description and structure 8 Installation 9 Connecting to supply network 10 Configuring and set up 11 Storage precautions 12 Manufacturer s warranty 13 Acceptance certificatep 14 W...

Страница 3: ...des cyclic turning the power on and off Using switches you can set any function mode fit to situation For example in the toilet you can use lighting sensor and timer So the fan will turn on when someb...

Страница 4: ...gulations Safety requirements CAUTION NOT ALLOWED BU scheme is under voltage Install only when voltage is off CAUTION Package includes control unit 1pc user s manual 1 pc package box 1pc Voltage 220 2...

Страница 5: ...fan pic 1 BU front panel includes moving sensor option lighting sensor BU function modes are indicated by red LED the fan is on red LED moving sensor actuation option yellow LED lighting sensor actuat...

Страница 6: ...and to move it upwards to fix it to connect BU to supply network read about connecting to supply network to make its configuring and set up read about configuring and set up to mount BU front panel a...

Страница 7: ...60 THPF Install only when the power is off pic 4 Installation should be done carefully to keep BU s electronics safe 2 Connect BU supply wire to outer automatic switch Connecting to supply network S1...

Страница 8: ...minal block Close the fan Scheme marking 8 9 7 Outer switch Function modes switch Input terminal block X On Off S2 1 2 3 4 RP2 RP1 5 Configure BU for your purposes read about configuring and set up 6...

Страница 9: ...h the RP2 regulator according to the table 2 Operating threshold is set with RP1 regulator Yellow LED indicates illumination threshold exceeding The mode is activated by setting switch 1 into ON posit...

Страница 10: ...rating range is limited with 5 m distance and 130 viewing angle After the movement ends the fan keeps working for the time set with RP2 regulator according to the table 2 The mode is activated by sett...

Страница 11: ...counts from the date of manufacture If BU work fails during warranty period and it s manufacturer s fault the customer has the right to change BU at the Manufacturer s Storage precautions Manufacturer...

Страница 12: ...s and is recognized as serviceable Inspector s stamp Date of manufacture Seller Name of the shop seller s stamp Selling date V24EN 03 Warranty card MANUFACTURER isn t responsible for the damage appear...

Отзывы: