Vents-us MICRA 150 Скачать руководство пользователя страница 2

www.ventsus.com

MIU_54(MICRA_150)-01

Bodor Vents, LLC DBA: VENTS-US
11013 Kenwood Road Cincinnati, Ohio 45242
Phone: (513)348-3853 
e-mail: [email protected]

Fig. 2 Master plate 

2 holes for a Ø 4 7/8 " air duct.

Fill the gaps between the wall and the air 

ducts with a mounting foam. 

2 holes for a Ø 4 7/8 " air duct.

Fill the gaps between the wall and the air 

ducts with a mounting foam. 

4 1/4 " holes 3 1/2 " deep are made using 

the master plate.

4 1/4 " holes 3 1/2 " deep are made using 

the master plate.

Point for cable rounding 

inside the unit 

Point for cable rounding 

inside the unit 

19 

5

"

1

"

1

"

10

 

"

16 

1

"

3

"

22 

5

"

21 

1

"

1

"

3

"

2 holes for a Ø 4 7/8 " air duct.

Fill the gaps between the wall and the air 

ducts with a mounting foam. 

2 holes for a Ø 4 7/8 " air duct.

Fill the gaps between the wall and the air 

ducts with a mounting foam. 

4 1/4 " holes 3 1/2 " deep are made using 

the master plate.

4 1/4 " holes 3 1/2 " deep are made using 

the master plate.

Point for cable rounding 

inside the unit 

Point for cable rounding 

inside the unit 

19 

5

"

1

"

1

"

10

 

"

16 

1

"

3

"

22 

5

"

21 

1

"

1

"

3

"

The unit is designed for installation directly in the premise to be ventilated. Prior to starting mounting operations mark and bore holes in the wall with the master plate, fig. 2. 

1. Fix the master plate on the wall with a self-adhesive 

tape at required level.

2. Indicate two marks for two holes Ø 51/8 " for air ducts 
and four holes Ø 1/4 " for the unit fasteners.  

3. Take off the master plate and drill through holes 
for the air ducts and 3 1/2'' deep holes for the unit 
fasteners. Insert yhe expansion anchors, remove the 
perforated fillers for the air ducts from the master 
plate and re-install the master plate back using a self-
adhesive tape.

4. Fix the outer ventilation hood (not included) or 
Ø 47/8 " ventilation grille on the outer wall of the 
building.
5. Insert the air ducts into the respective openings of 
the master plate.

6. Fill the spaces between the air ducts and the wall with 
a mounting foam through the holes in the master plate. 

7. Insert the unit spigots into the air ducts. 

Отзывы: