44
HORIZON – Installation and Operation Manual
B
NON-COMBUSTIBLE
FRAMING (STEEL STUD)
CLEARANCE
D
84" (2.13m)
This section must
remain empty
Non-combustible
material
Non-combustible
finishing material
Refer to the building code or the local code for regulations
concerning the need to install finishing material inside the
chase around the fireplace.
NOTE
THIS FIREPLACE IS BUILT IN ORDER TO MAINTAIN A 1/2"
GAP MINIMUM BETWEEN THE FIREPLACE AND THE
FACEPLACE.
IT IS RECOMMANDED TO HAVE THE NON-COMBUSTIBLE
MATERIAL FLUSH WITH THE FIREPLACE.
Содержание HORIZON
Страница 10: ...10 HORIZON Installation and Operation Manual 2 3 Measurements ...
Страница 11: ...HORIZON Installation and Operation Manual 11 ...
Страница 50: ...50 HORIZON Installation and Operation Manual ...
Страница 74: ...74 HORIZON Installation and Operation Manual ...
Страница 75: ...HORIZON Installation and Operation Manual 75 APPENDIX 9 EXPLODED DIAGRAM AND PARTS LIST ...
Страница 80: ...80 HORIZON Installation and Operation Manual ...