![Ventis HE200 Скачать руководство пользователя страница 77](http://html.mh-extra.com/html/ventis/he200/he200_installation-and-operation-manual_1002228077.webp)
HE200 - Installation and Operation Manual
77
2.
Secure
the
6
steel
brackets
(B)
with
6
screws
provided
(C)
on
top
of
the
fireplace
(3
for
each
ducting).
Insert
the
ducting
(A)
(not
provided)
into
each
opening
and
secure
it
in
place
using
the
steel
brackets
(B)
installed
previously
with
6
other
self
‐
tapping
screws
provided
(D).
3.
Secure
the
ducting
(A)
to
the
heat
distribution
box
(E)
with
self
‐
tapping
screws
(3
per
ducting).
Insert
the
adjustable
frame
(F)
in
the
heat
distribution
box,
press
it
against
the
non
‐
combustible
finishing
material
and
secure
with
4
screws
into
the
heat
distribution
box.
Set
the
decorative
plate
(G)
to
the
adjustable
frame
(F).
Содержание HE200
Страница 9: ...HE200 Installation and Operation Manual 9 ...
Страница 38: ...38 HE200 Installation and Operation Manual ...
Страница 45: ...HE200 Installation and Operation Manual 45 INSTALLATION WITHOUT SHELF ...
Страница 58: ...58 HE200 Installation and Operation Manual Direct installation Exterior offset installation ...
Страница 93: ...HE200 Installation and Operation Manual 93 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST ...