ENG 20190826
Owners Manual A1200
Run in Phase
Despite very high precision, minimal manufacturing tolerances can not be avoided in
the manufacture of the bearings. This condition may generate noise during the start-
up phase of the pump. However, this is normal and does not pose a long-term
problem. During post-fabrication testing, all pumps are tested for performance,
concentricity and noise. The start-up phase can take a few days, depending on the
operating mode. The following figure clearly shows the difference between a brand
new bearing (left) and a bearing after the break-in phase (right). After the break-in
phase, these operating noises will almost disappear.
12
new
after use
Содержание Abyzz A1200 IPU
Страница 1: ...Owners Manual A1200 IPU...
Страница 15: ...ENG 20190826 Owners Manual A1200 15...
Страница 16: ...ENG 20190826 Owners Manual A1200 Wartung 16...
Страница 23: ...ENG 20190826 Owners Manual A1200 All dimensions in Millimeter mm 23...
Страница 26: ...ENG 20190826 Owners Manual A1200 WWW ABYZZ DE 26...