background image

Guy Wire Installation

IMPORTANT: 

Guy wires must be installed 45º to 60º 

from vertical to ensure proper functioning.

Standard Steel Cable Clamp

Required Loose Components (Included):
  •  20 ft. Guy Wire (4)
Required Components from Bag # 916290:
  •  Guy Wire Clamp Assembly (4)
  •  Guy Wire Clamp Bolt (4)
  •  Quick Link (8)
  •  U-Bolt Steel Cable Clamp (8)
  •  Turnbuckle (4)
Hardware/Tools Needed (Not Included):
 • Level
  •  Torque Wrench
  •  7/16 in. Socket and Wrench
  •  5/16 in. Socket and Wrench
  •  Adjustable Wrench
  •  Cable Cutters (optional)

  1.  Secure guy wire clamps to the building structure 

using the guy wire clamp bolts and an adjustable 
wrench. Attach guy wires to the eyelets on the guy 
wire clamp assemblies using (4) supplied quick 
links.

DOWNTUBE & MOUNT ASSEMBLY

UG2 GRIPPLE

®

 TURNBUCKLE

GUY WIRE

GUY WIRE

GUY WIRE

GUY WIRE CLAMP ASSEMBLY

GUY WIRE CLAMP BOLT

45º to 60º

UG2 GRIPPLE

®

 TURNBUCKLE

GUY WIRE ATTACHMENT RING

QUICK LINK

  2.  Insert the loose end of each guy wire through the 

eyebolt on a turnbuckle. Turn the guy wire back 
onto itself and align the loose end of the guy wire 
(referred to as the dead-end) with the length of 
guy wire that is attached to the building structure 
(referred to as the live-end).

  3.  Attach the dead-end of each guy wire to the live-

end using (2) of the supplied 0.094 in. u-bolt steel 
cable clamps. Loosely tighten the nuts on the steel 
cable clamps, leaving enough room for the guy 
wire to slide through the steel cable clamps. 

IMPORTANT: 

The first steel cable clamp must be 

installed a minimum of 5-1/2 in. away from the dead-
end of the guy wire to ensure proper functioning.

IMPORTANT: 

Steel cable clamps consist of two parts: 

the u-bolt and the saddle. Steel cable clamps must be 
installed with the u-bolt over the dead-end of the guy 
wire and the saddle over the live-end of the guy wire. 
Failure to install steel cable clamps in this manner may 
result in unsafe operating conditions. Refer to drawing 
below for correct orientation.

TURNBUCKLE

45° TO 60°

DOWNTUBE AND
MOUNT ASSEMBLY

GUY WIRE

CABLE CLAMP

QUICK LINK

EYEBOLT

BEAM CLAMP ASSEMBLY

5-1/2 IN. MIN.

CABLE CLAMP U- BOLT

DEAD END

LIVE END

CABLE CLAMP SADDLE

O

  4.  Attach all (4) turnbuckles to the guy wire 

attachment ring located on the downtube using 
(4) supplied quick links.

  5.  Pull the dead-end of each guy wire through the 

steel cable clamps until taut.

  6.  Tighten the nuts on the steel cable clamps using a 

7/16 in. socket and torque to 54 in∙lbf (6.10 N∙m), 
alternating between nuts until reaching proper 
torque.

  7.  Place a level against the downtube and tighten all 

(4) turnbuckles by hand in a crisscross pattern until 
the guy wires are tight and the fan is level. 

NOTE: 

When leveling the fan, place the level against 

the downtube in-between two neighboring guy wires 
to simplify the leveling process. The level should also 
be moved around the circumference of the downtube 
periodically to ensure that the fan is level in all 
directions.
  8.  Cut or organize excess guy wires to ensure that 

they do not interfere with fan performance. Make 
sure to leave at least 5-1/2 in. of wire between the 
dead-end of the guy wire and the first wire rope 
clip to ensure proper functioning.

Quick Start 

Guide

Gener

al

 

Information

Pr

e-Installation

Mechanical 

Installation

Fir

e System 

Integr

ation

Electrical

 

Installation

Fan
 

Netw

orking

Oper

ation And 

Maintenance

Troubleshooting

Refer

ence

Overhead Ceiling Fans

25

Содержание VCFI

Страница 1: ...ocation of the fan Socket Wrench with 7 16 in 1 2 in 9 16 in 3 4 in and 17mm Sockets 7 16 in 1 2 in 9 16 in and 3 4 in Wrenches Adjustable Wrench Torque Wrench up to 50 ft lbf Torque Wrench up to 120...

Страница 2: ...inglet Installation 26 27 Hub Plate Installation 27 LED Light Installation Optional 28 Fire System Integration Fire System Integration Optional 29 Electrical Installation Motor Cable Connection 30 32...

Страница 3: ...EMBLY 1 2 in 13 x 1 75 GRADE 8 BOLT 1 2 in WASHER 1 2 in 13 GRADE 8 NYLON LOCKNUT 1 2 in 13 GRADE 8 BOLT BY OTHERS 1 2 in 13 GRADE 8 NYLON LOCKNUT 1 2 in WASHER SQUARE WASHER PLATE STEEL TRUSS BAR JOI...

Страница 4: ...8 BOLT 1 2 in 13 GRADE 8 NYLON LOCKNUT 1 2 in WASHER 1 2 in 13 GRADE 8 NYLON LOCKNUT 1 2 in WASHER 1 2 in 13 GRADE 8 NYLON LOCKNUT DOWNTUBE MOUNT ASSEMBLY Z PURLIN BY OTHERS STRUCTURAL STEEL ANGLES B...

Страница 5: ...CAL CABLES FROM MOTOR MUST BE ON SAME SIDE AS BLACK PLASTIC VFD COVER CABLES ARE NOT LONG ENOUGH TO REACH CIRCUIT BOARD FROM OPPOSITE SIDE MOTOR MUST BE REMOVED AND ROTATED 180 IF INSTALLED INCORRECTL...

Страница 6: ...UE TO 25 FT LBF 34 N m TORQUE TO 60 IN LBF 6 8 N m SUPPLIED FIRE RELAY RED WHITE YELLOW NC BLUE COMMON BLACK RED FIRE ALARM CONTROL PANEL RED WHITE FIRE ALARM RELAY INSTALLATION MANUAL PAGE 29 IMPORTA...

Страница 7: ...N PROPER ORIENTATION FOR FAN OPERATION STEP 7 MOTOR CABLE CONNECTION TO VFD RED BLACK WHITE GREEN POWER SOURCE L3 L2 L1 GROUND BLACK WHITE GREEN POWER SOURCE L2 L1 GROUND 1 PHASE INPUT POWER OR 3 PHAS...

Страница 8: ...Off Off Off 2 3 Off On Off Off Off 3 4 On On Off Off Off 4 5 Off Off On Off Off 5 6 On Off On Off Off 6 7 Off On On Off Off 7 8 On On On Off Off 8 9 Off Off Off On Off 9 10 On Off Off On Off 10 11 Off...

Страница 9: ...FACTORY SUPPLIED SHIELDED 90 ADAPTER CAT 5e CABLE STEP 11 CONTROLS INSTALLATION STANDARD TOUCHSCREEN CONTROL REFER TO CONTROL MANUAL PAGE 2 FACTORY INSTALLED RJ12 CABLE TO TOUCHSCREEN INTERFACE TOUCHS...

Страница 10: ...8 IMPORTANT BLADE COUNT AND FAN SIZE MUST BE SET APPROPRIATELY IN CONTROL MENUS FOR PROPER FAN OPERATION STEP 12 FAN START UP RECESSED MOUNT ADVANCED TOUCHSCREEN CONTROL REFER TO CONTROL MANUAL PAGES...

Страница 11: ...ic shock or injury to persons observe the following 1 Installation work and electrical wiring must be done by qualified person s in accordance with all applicable codes and standards including fire ra...

Страница 12: ...venience to the user Indoor The ideal environment for the storage of fans and accessories is indoors above grade in a low humidity atmosphere that is sealed to prevent the entry of blowing dust rain o...

Страница 13: ...E WITH RJ45 SPLITTER LIGHT POWER PLUG OPTIONAL LIGHT COMMUNICATION PLUG OPTIONAL Shielded CAT 5e Control Cable 1 DS 3 DS 6 Motor Hub Assembly 1 Guy Wire Fastener Kit Bag 916290 GUY WIRE CLAMP ASSEMBLY...

Страница 14: ...Gripple Installation Kit Optional 20 Ft Guy Wire 4 GUY WIRE GUY WIRE GUY WIRE CLAMP ASSEMBLY GUY WIRE CLAMP BOLT LE CONNECTOR QUICK LINK Gripple Fastener Kit Optional Bag 916290 No 4 Gripple 5 GUY WIR...

Страница 15: ...he center of four adjacent sprinklers with at least 3 ft of vertical clearance between the fan and sprinkler deflectors Fan must also be interlocked to shut down upon receiving a waterflow signal from...

Страница 16: ...A 3 FT CLEARANCE AROUND BLADES 2X FAN DIAMETER FROM HVAC MINIMUM 10 FT ABOVE FINISHED FLOOR HVAC DIFFUSER WHEN FULL DIFFUSER OUTLET IS BELOW HVLS FAN HVLS FAN MUST BE 1X FAN DIAMETER AWAY 3 FT CLEARAN...

Страница 17: ...ts Included I Beam Clamping Plate 2 I Beam Clamping Plate Shim 2 Required Components from Bag 915428 1 2 in 13 x 2 1 2 in Grade 8 Hex Bolt 4 1 2 in 13 Grade 8 Nylon Locknut 4 1 2 in Washer 8 Hardware...

Страница 18: ...tructural engineer 2 Mount structural steel angles to steel trusses bar joists using 4 grade 8 1 2 in 13 bolts by others to accommodate varying material thickness and supplied 8 1 2 in washers 4 squar...

Страница 19: ...ate desired fan hanging location Using the supplied wood beam brackets as a template mark and drill 4 9 16 in holes in the wood beam Be sure bottom of brackets are flush or slightly below bottom of wo...

Страница 20: ...Using the supplied z purlin mounting brackets as templates mark and drill 4 9 16 in holes in each z purlin Z PURLIN BACKING PLATE 1 2 in 13 x 1 3 4 in GRADE 8 HEX BOLT Z PURLIN 1 2 in WASHER Z PURLIN...

Страница 21: ...d 8 ft For span lengths up to 8 ft a minimum of 2 Unistrut channels are required Size of Unistrut channels must be specified by a structural engineer Unistrut channels must be a minimum of 1 5 8 x 1 5...

Страница 22: ...h the optional LED light assembly connect the male light power 3 pin and light communication 2 pin plugs in the motor hub assembly to their corresponding female connectors in the downtube DOWNTUBE AND...

Страница 23: ...p edges 3 Align the loose end of the safety cable referred to as the dead end with the length of cable that is wrapped around the mounting structure referred to as the live end 4 Attach the dead end o...

Страница 24: ...he No 4 Gripple connector Note that the cable will only feed through the Gripple connector in one direction marked on the Gripple connector with an arrow 6 Pull the loose end of the safety cable throu...

Страница 25: ...bolt and the saddle Steel cable clamps must be installed with the u bolt over the dead end of the guy wire and the saddle over the live end of the guy wire Failure to install steel cable clamps in th...

Страница 26: ...rfere with fan rotation NOTE If necessary the guy wires can be loosened by inserting the long end of a 1 16 in allen wrench into either of the pin holes on the No 4 Gripple connector and pulling the c...

Страница 27: ...E 8 HEX BOLT 2 PER BLADE MOTOR STRUT AIRFOIL BLADE AIRFOIL BLADE AIRFOIL RETAINING RING AIRFOIL RETAINING RING AIRFOIL RETAINING RING SHIM 4 Repeat steps 1 through 3 on remaining airfoil blades Torque...

Страница 28: ...e u nuts on the LED light mounting bracket are aligned with the mounting holes in the hub retention bracket Install 2 1 4 in 20 x 3 4 in grade 5 hex bolts into the u nuts using a magnetic nut driver e...

Страница 29: ...closed PAM 1 fire alarm relay or an equivalent electromechanical or reed relay for proper function of the fire alarm emergency stop feature Solid state relays or other digital switching relays cannot...

Страница 30: ...und and hall sensor cables into the VFD circuit board as shown below The motor power and hall sensor cables are designed to only fit in one orientation Use the wire color references below and photos o...

Страница 31: ...Connection Quick Start Guide General Information Pre Installation Mechanical Installation Fire System Integration Electrical Installation Fan Networking Operation And Maintenance Troubleshooting Refer...

Страница 32: ...tion Reference Troubleshooting Operation And Maintenance Fan Networking Electrical Installation Fire System Integration Mechanical Installation Pre Installation General Information Quick Start Guide O...

Страница 33: ...rt the electrical plug into the receptacle and twist to lock the plug in place 4 Secure any loose power cable to the building structure to ensure it does not interfere with fan performance Without Opt...

Страница 34: ...lded CAT 5e by others that complies with the following specifications Cable must be twisted pair shielded 26 ga CAT 5e cable with a drain wire and must be compliant with ISO 11801 Cable must use shiel...

Страница 35: ...te amount of cable and cut to length IMPORTANT Individual CAT 5e cable lengths must not exceed 200 ft in order to prevent network communication issues 2 Strip and remove 2 in of CAT 5e cable jacket le...

Страница 36: ...sition 6 On Position 7 Off Position 8 Off 4 Verify that the low voltage wiring terminal strip on the VFD circuit board is wired as shown in the diagram and picture on this pages 36 37 Reinstall the bl...

Страница 37: ...k Start Guide General Information Pre Installation Mechanical Installation Fire System Integration Electrical Installation Fan Networking Operation And Maintenance Troubleshooting Reference Overhead C...

Страница 38: ...Dipswitch 3 Fan Number Modbus Address Position 1 Position 2 Position 3 Position 4 Position 5 Position 6 7 8 N A 1 RESERVED FOR HVLS FAN CONTROLS Do Not Modify 1 2 On Off Off Off Off 2 3 Off On Off Of...

Страница 39: ...eneral Information Pre Installation Mechanical Installation Fire System Integration Electrical Installation Fan Networking Operation And Maintenance Troubleshooting Reference All Remaining Fans Overhe...

Страница 40: ...fasteners for tightness Adjust and tighten as necessary 24 Hour Interval Inspect all fan components Check all fasteners airfoil retaining ring the safety cable and guy wires if applicable Adjust and...

Страница 41: ...must have a unique Modbus address setting on dipswitch bank 3 8 Are motor power motor ground and hall cables connected to all VFDs Yes No No connection between motor and VFD Connect motor power motor...

Страница 42: ...ct factory Everything is working properly Problem Advanced Touchscreen control will not turn on 1 Is the power adapter cable wired into the control panel Yes No No supply power to control panel Wire t...

Страница 43: ...g persists test shielded CAT 5e cables for functionality and replace faulty cables if applicable Otherwise contact factory 6 Does communication wiring on VFD of fan 2 directly connected to fan 1 via s...

Страница 44: ...d blade count set appropriately in the control for all installed fans Yes No Incorrect torque speed command to fans Set fan size and blade count using instructions in the appropriate control manual Fa...

Страница 45: ...address setting on dipswitch bank 3 6 Do fans operate as expected Yes No Contact factory Everything is working properly Problem One or more fans run but are making excessive noise vibrating 1 Have all...

Страница 46: ...es 170LV or 170HV set dipswitch 1 position 1 to ON and dipswitch 1 position 2 to OFF 7 Do fans operate as expected Yes No Contact factory Everything is working properly Problem One or more fans not op...

Страница 47: ...fan VFDs and reconnect fire alarm relay wiring Turn fans on using control Do fans operate as expected Yes No Fire alarm relays and or fire alarm relay wiring are defective Replace defective component...

Страница 48: ...female plugs in the downtube Reconnect the motor hub assembly 7 6 Are the LED light power 3 pin and communication 2 pin plugs connected between the motor hub assembly and the LED light assembly of th...

Страница 49: ...ring diagram on pages 36 39 6 Does LED light operate as expected Yes No Contact factory Everything is working properly Problem LED light is flickering 1 Are the LED light power 3 pin and communication...

Страница 50: ...ions on in appropriate control manual 4 Install blades on fan 3 Motor Over Temperature Internal motor temperature exceeds maximum value resulting in reduced fan speed or shutdown Ambient temperature t...

Страница 51: ...Fault Code Values are retained after power cycle 7 Second Last Fault R R xxx 8 Third Last Fault R R xxx 9 Fourth Last Fault R R xxx 10 Fifth Last Fault R R xxx Diagnostics 11 Firmware Version R R xxx...

Страница 52: ...es Airfoils will be installed a minimum of 10 feet above finished floor Airfoils will be installed with a minimum horizontal and vertical clearance of 3 feet to any obstructions Center of fan will be...

Страница 53: ...he specifications included in the IOM Individual CAT 5e cable lengths do not exceed 200 feet CAT 5e Cable Functionality All CAT 5e cables have been tested for functionality including continuity of the...

Страница 54: ...ence Safety Cable and Guy Wires I have taken photos showing close up views of the installed safety cable and guy wires for at least one representative fan Photos have been saved for future reference V...

Страница 55: ..._______Time______________ AM PM Notes ____________________________________________ _________________________________________________ _________________________________________________ _________________...

Страница 56: ...nco Products 56 As a result of our commitment to continuous improvement Venco reserves the right to change specifications without notice Our Commitment Phone 1 833 881 0565 Fax 715 355 2399 E mail inf...

Отзывы: