2019.10
4 / 21
1. INTRODUCTION
Installation, Operation and Maintenance Instruction concerns energy recovery units manufactured by VENCO.
It consists of basic information and recommendation concerning the design, technical specifications,
installation, operation and maintenance of the energy recovery unit which shall be obeyed to ensure proper
fail-safe operation of the unit. The key to proper and safe operating of the unit, read thoroughly this instruction,
use the unit according to guidelines given in it and follow all safety requirements. The instruction should always
be in proximity of the unit and within easy reach of the service technician.
2. ENERGY RECOVERY UNITS and VHR ER MODELS
VENCO Energy Recovery Units are classified 9 different models; VHR ER 01
– 04 – 06 – 08 – 15 – 28 – 35 –
40
– 51 – 54 (Figure 2.1). In all models, the housing is made from galvanized sheet metal and the cabinet is
fully insulated for sound and heat isolation. The surface of the unit is lacquered with the electrostatic RAL
colors. All models contain two access doors for the service to fresh and exhaust air filters.
READ THE INSTRUCTION BEFORE START-UP THE UNIT and KEEP IT IN
PROXIMITY OF THE UNIT and WITHIN EASY REACH OF SERVICE TECHNICIAN.
THE APPLIER WILL BE RESPONSIBLE FOR DEFECTS OCCURED DUE TO
OPERATING THE UNIT BY NOT AUTHORIZED PERSONEL or USING THE SPARE
PARTS WHICH ARE NOT ORIGINAL.
THE UNIT MUST BE OPERATED APPROPRIATE APPLICATIONS FOR PURPOSES
DESIGN and TECHNICAL SPECIFICATIONS
THE UNIT MUST NOT USED IN THE ENVIROMENTS WHERE CORROSION and
EXPLOSIVE GASSES EXIST
Содержание ER 40
Страница 18: ...2019 10 18 21 SPARE PART LIST Figure 16 1 Energy Recovery Spare Parts ...
Страница 19: ...2019 10 19 21 16 APPENDIX 16 1 APPENDIX 1 Standard Controller SEC Electrical Wiring Diagram ...
Страница 20: ...2019 10 20 21 16 2 APPENDIX 2 Functional Controller FEC Electrical Wiring Diagram ...