OPERATION

User Manual

LOADS CONTROL 3 RELAYS

 

Read all the instructions carefully

DIMENSIONS

INSTRUMENT DESCRIPTION

INSTALLATION

2

5.1

72

60

88

45

72

1
2
3

4.1

4.2

4

5

6

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

Alarm

PRG

PC3R

Out 1

Out 2

Out 3

ON OFF

ON OFF

ON OFF

Reset

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

PRG

connected load

disconnected load

absorbed power

1  2  3

1  2  3

1  2  3

1  2  3

1  2  3

connection 

loads zone

disconnection 

loads zone

delay ON

delay OFF

Time

delay OFF

Power

Setpoint - Hysteresis

Setpoint

Disconnection load 2 (the second one less priority)

Connection 

load 2

Disconnection load 3 (less priority)

Vemer S.p.A.

I - 32032 Feltre (BL) • Via Camp Lonc, 16

Tel +39 0439 80638 • Fax +39 0439 80619
e-mail: [email protected]  -  web site: www.vemer.it 

V3IS00703-011-062018

 

Mod.

 PC3R

  

Red led: on if the absorbed power is higher than the setpoint

  

Keys increase/decrease

  

Key PRG:  instrument programming/confirmation  

- brief pressure = lower than 3 seconds 

- long pressure = higher than 3 seconds

  

Data  view display 

4.1 Measured power  

4.2  Segments for loads status indication  

(connected = fixed on, disconnected = flashing)

  

Power  supply terminals/inputs 

Terminals 6-8: voltage input/instrument power supply 

Terminals 8-9: current input (direct until 32A)

  

Relays terminals for loads connection

Electronic instrument to measure the consumption of active power in single-

phase systems to prevent the activation of the limiter switch of general 

current for overload. For this reason, if the total absorbed power is higher than 

the programmed activation threshold (setpoint), the PC3R provides for the 

disconnection of one or more not priority loads. 

It’s possible to control until 3 loads (or loads groups) through the command of 

as many relays, to whom is assigned a priority which sets the order with whom 

the loads are disconnected.

Code  

Model  

Description

VE467700

 

PC3R 

Loads control 3 relays

SAFETY WARNINGS

 

 During the installation and the operation of the instrument it’s necessary to 

observe the following instructions:

  1)   The instrument must be installed by a qualified person by observing 

scrupulously the connection diagrams.

  2)   The instrument must be installed and activated in compliance with current 

electric systems standards.

  3)   After installation, inaccessibility to the connection terminals without appropriate 

tools must be guaranteed.

  4)  Do not use the instrument for other purposes different from the one specified.

  5)   The instrument must be installed in a closed electrical panel adequately 

protected.

  6)  In the power supply network a bipolar disconnection must be present.

  7)   A protection device against over-currents should be installed in the electrical 

system, upstream of the device.

  8)   Before accessing the connection terminals, verify that the leads are not live.

  9)  Do not power on or connect the instrument if any part of it is damaged.

10)   In case of malfunction do not perform repairs and contact immediately the 

technical support.

11)   The instrument can be used in environments with category of measurement III 

and pollution degree 2, as per standards CEI EN 61010-1. 

TECHNICAL CHARACTERISTICS

•   Power supply: 230Vac (-15% ÷ +10%) 50/60 Hz

•  Maximum own consumption: 8 VA 

•   Voltage input consumption: < 2,5VA

•   Current input consumption: < 2,5VA

•   Measurement precision: 2% full scale

•  Direct current connection until 32A through shunt

•  Maximum overload with maintenance of measurement accuracy: 40A

•  Settable setpoint range: 1 ÷ 10 kW

•  Settable hysteresis range: 0 ÷ 1 kW

•  Output: 3 monostable relays with exchange contact 16A / 250Vac

•  Blocks for cables with maximum section of 6 mm

2

•  Operating temperature: -10°C ÷ +45°C

•  Operating humidity: 10% ÷ 90% non condensing

•  Storage temperature: -10°C ÷ +65°C

•  Container: 4 modules din

•  Protection degree: IP20 / IP51 (on the front panel)

•   Insulation:  reinforced between accessible parts (front panel) and all other terminals

•  Type of actions: 1B

To prevent the disconnection of all loads downstream of the general counter, the 

loads control PC3R must measure the same current of the energy meter.  

For this reason the ideal position for the connection of the instrument is immediately 

downstream of the general switch.

Four loads or groups of loads must be located and so divided:

  

Not disconnectable loads

, that is to say loads which can’t be disconnected and 

that can’t be controlled by PC3R (even if their consumption must be measured by 

PC3R to determine the total consumption)

• 

 Loads with high priority (priority 1)

, which can be disconnected only as a last 

hypothesis to limit the power absorbed

• 

Loads with medium priority (priority 2)

•  

Loads with low priority (priority 3)

, which can be disconnected without 

special problems and they will be disconnected for first if the absorbed power is 

higher than the prefixed threshold.

Note:

  PC3R can be used also as a generic controller of absorbed power by loads 

under control by placing it upstream of the cable for power supply of loads 

themselves.  

Clearly with this second application it’s not possible to prevent the 

disconnection of the general energy meter, because the absorptions of the 

loads not controlled by PC3R are not counted.

OPERATION

The PC3R switches on with the disconnected loads; every DelayOn seconds one load 

is connected (if the absorption conditions allow this).

During the normal operation the instrument shows the 

measured power (expressed with two decimals) and relays 

status (segment on fixed if connected load, flashing segment 

if disconnected load).

The programmed setpoint can be showed for three seconds 

by pressing the key   .

Configuration relays (normally open 

or normally closed) can be showed by 

pressing the key   and then the relays 

priority. Each display is visible for 3 

seconds.

The device reset can be performed by pressing simultaneously the keys   and   : 

the loads are disconnected and then reconnected according to the set priority.

OPERATION LOGIC (T control≠0)

Attention: only a qualified person can modify this value!

With 

T control

 different from zero, for each connection or disconnection of 

one load the PC3R calculates the consumption of the load itself, measuring the 

difference between the absorbed power before and after.

This calculated consumption is valid for all next 

T control

 minutes, where the 

PC3R connects the load if the following condition is verified:

Total absorbed power < Setpoint – hysteresis – C

PX

where C

PX

 is the consumption of the load in question

Note:

   If there are more disconnected loads it’s possible that the less priority load 

verifies the connection condition before the most priority load. In this case 

the less priority load is connected while another load with higher priority is 

disconnected. 

 

 This condition that contrasts with the priorities assigned to the single 

outputs ends in the following cases:

 

-  if before the 

T control

 expiration the absorbed power is such to allow 

the connection of the most priority load (eventually by disconnecting the 

one less priority)

 

-  if the 

T control

 time is expired. In this case for PC3R the estimated 

consumptions are no longer true and it proceeds by disconnecting all 

the loads and by connecting them one at a time according to the priority 

(each 

Delay On

 seconds)

 

-  if a reset is performed by pressing simultaneously the keys   and   . 

In this case the loads are disconnected and then reconnected according 

to the priority.

After 

T control

 minutes on the contrary, for PC3R the consumption of the load 

Cpx is no longer reliable and so the condition to connect the load becomes:

Total absorbed power < Setpoint – hysteresis

which is the same we would have with 

T control=0

.

In practice, if 

T control

 is different from 0, the insertion sequence doesn’t 

respect necessarily the set priority but it will be such to maximise the number of 

connected loads.

DEFINITION AND MODIFICATION OF OPERATION PARAMETERS

• 

 Setpoint

 [kW] represents the activation threshold that is to say the maximum value of accepted consumption before the instrument provides for the disconnection of the 

loads according to the priority.

• 

 Hysteresis

 (or differential) [kW] represents the value to subtract from the setpoint to calculate the value under whom there is the insertion zone (that is to say the zone 

where it’s possible to connect the loads eventually disconnected).  

For example, if the setpoint = 3 Kw and differential = 0.5 kW the loads eventually disconnected can be connected if the value of measured absorbed power is lower than 2.5 kW.

• 

Delay On

 [seconds] represents the minimum time that must elapse from the last connection (or disconnection) of one load before connecting another one. 

•  

Delay Off

 [seconds] represents the delay of disconnection, that is to say how long the absorbed power must result higher than the setpoint before the instrument disconnects one load.

• 

T control

 [minutes] represents how long the consumption of active power estimated for each load can be considered valid. For details see the box 5.1 

To access the modification or the operation parameters display press the key  . 

 REFERENCE STANDARDS

Compliance with Community Directives:

2014/35/EU (LVD) 2014/30/EU (EMCD)

is declared with reference to the following standards:

• EN 61010-1

• EN 61000-6-2 and 61000-6-3

Not 

disconnectable

loads

Disconnectable 

loads

with priority 1

Disconnectable 

loads

with priority 2

Disconnectable 

loads

with priority 3

OPERATION LOGIC (T control=0)

Setpoint modification

Values: 1 ÷ 10 kW

default = 3 kW

Hysteresis modification

Values: 0 ÷ 1 kW

 default = 0 kW

Intervention time 

modification

Values: 10 ÷ 999 s

default = 30 s

Disconnection time 

modification

Values: 10 ÷ 999 s

defaul t= 30 s

T control modification

Values: 0 ÷ 999 min

default = 0 min

Example of valid connection 
with priority and not modified
logic of relays operation