10
S
et up
-
F
our
-
channel control
10
.
1
G
eneral information
Y
ou require two
VEGATOR
632
signal conditioning instruments for a
four
-
channel control
.
10
.
2
A
djust relay function
D
epending on the switching function of the signal conditioning
instrument
.
S
ee single channel
,
two
-
point or two
-
channel control
.
10
.
3
A
djustment
D
epending on the switching function of the signal conditioning
instrument
.
S
ee single channel
,
two
-
point or two
-
channel control
.
10
.
4
A
djust switching delay
S
ee single channel
,
two
-
point or two
-
channel control
.
10
.
5
A
ctivate line break monitoring
T
he line break monitoring or alarm function de
fi
nes the function of the
instrument in case of failure
.
I
f you are using a probe without line break monitoring
,
a fault signal will
be triggered
.
I
n this case
,
set the switch
(
7
)
to o
ff
.
O
nly failures of channel
1
are monitored
.
A
failure is signalled via the red control lamp on the front plate
.
Alarm
off on
1
2
3
4
5
6
7
F
ig
.
130
:
S
witch block
(
A
)
with switch
(
7
)
for activation of the line break
monitoring
(
alarm
)
VEGATOR
632
•
S
ignal conditioning instrument
41
10
S
et up
-
F
our
-
channel control
35243
-
EN
-
120228