8
4 Mounting
Process module • VEGABAR series 80
1013720-EN-220826
1
Fig. 5: Double chamber housing
1 Position of the screw
4. Remove the housing
4.3 Mounting steps new process component
1. Place the housing onto the new process component.
2. Depending on the housing, tighten the locking screw on the base
with a screwdriver
3. Insert the locking ring with the pliers
4. Tighten the screws of the limit angle and the locking ring with a
Phillips screwdriver size 1
5. Insert the electronics module carefully.
Information:
Make sure that the plug is in the correct position. The marking notch
must be in position "18.00 h".
1
Fig. 6: Plug position
1 Notch
6. Tighten the two holding screws with a screwdriver (Torx size T 10
or slot size 4)
7. Connect the connection cables according to the operating
instructions manual of the respective sensor
8. Screw the housing lid back on
The process component is exchanged.
As a rule, the exchange of the process component must be docu-
mented internally when used in Ex applications.
Содержание VEGABAR 80 Series
Страница 1: ...Operating Instructions Process module VEGABAR series 80 Document ID 1013720...
Страница 12: ...12 Notes Process module VEGABAR series 80 1013720 EN 220826...
Страница 13: ...13 Notes Process module VEGABAR series 80 1013720 EN 220826...
Страница 14: ...14 Notes Process module VEGABAR series 80 1013720 EN 220826...
Страница 15: ...15 Notes Process module VEGABAR series 80 1013720 EN 220826...