It is important to always activate the Port settings before starting a test (next pages for more information)
6.4.5 Operations
STEP ONE
From the Home Menu, access Performance Tests. Enter the On-Demand Testing menu.
A two-tabbed screen will be shown, featuring Available MPXs and Activated MPXs. ReVeal MPX will automatically check the
status of MPX100s that are saved in the Management table
MPX100 e-Manual D07-00-022 Rev A00
Page 30 of 46