background image

Manual No:

 

577013-719

 

 

Revision:

 

G

Site Prep Manual

TLS-IB

Содержание TLS-IB

Страница 1: ...Manual No 577013 719 Revision G Site Prep Manual TLS IB...

Страница 2: ...all components and units as soon as they are received If damaged write a complete and detailed description of the damage on the face of the freight bill The carrier s agent must verify the inspection...

Страница 3: ...TLS IB 14 Cable Specifications 15 Field Wiring 16 Probe to TLS IB Location Level 1 Installations Only 16 Maximum Cable Lengths 16 Ducting Entry to TLS IB Location 16 Equipment Connected To The RS 232...

Страница 4: ...Specifications 41 TLS IB IFSF Commands 41 Figures Figure 1 Control Drawing Showing an Example TLS IB System Site Layout 3 Figure 2 Typical Tank Lid Access Chamber Installation 7 Figure 3 Tank Lid Acc...

Страница 5: ...hip 37 Figure 33 Manually transmitting neuron ID 38 Tables Table 1 PTB Compliant Installation Calculation sheet for determining the correct probe length 12 Table 2 Probe Cable Specification V R P N 22...

Страница 6: ...cations for contractors who will install and setup the equipment discussed in this manual Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit routing equ...

Страница 7: ...GLOVES Wear gloves to protect hands from irritation or injury READ ALL RELATED MANUALS Knowledge of all related procedures before you begin work is important Read and understand all manuals thoroughl...

Страница 8: ...n accordance with Article 504 20 of the latest National Electrical Code NFPA 70 Note Conduit ducting requirements are dependent on local electrical regulations For probe to console wiring shielded cab...

Страница 9: ...ad this manual particularly the sections referring to health and safety Deviation from the specifications contained in this manual can result in rework delays in system installation and additional ins...

Страница 10: ...s and regulations are complied with Also ensure that all recognised safety codes are followed Every person working with Veeder Root equipment is expected to take every safety precaution possible in th...

Страница 11: ...S IB unit IMPORTANT Substitution of specified components may impair intrinsic safety All probe wiring must be contained in dedicated ducts Tank Lid Access Chambers ACCESS CHAMBER INSTALLATION The inst...

Страница 12: ...racy the probe socket must be as close as possible to the longitudinal axis of the tank IMPORTANT The probe entry must not be obstructed by other pipe work A free area above the probe socket of at lea...

Страница 13: ...to 3 inches with suitable fittings The minimum probe entry size that can be used is 2 inches Where possible the canister of the probe should be completely contained within the 3 inch riser In all case...

Страница 14: ...probe chosen Probes specified for tanks with entries smaller than 3 inches must always be long enough to rest on the tank bottom and not hang in the riser adaptor see Figure 7 Figure 7 Canister clear...

Страница 15: ...y Veeder Root authorised engineers An optional cable shield is available if required Part No 705 100 4115 Figure 9 The Veeder Root Riser Cap Assembly and Fitting Tool IMPORTANT Veeder Root strongly re...

Страница 16: ...N 2999 BS2779 must be provided The probe installation arrangement is illustrated in Figure 10 Veeder Root recommend the use of a riser to provide protection to the Mag Probe Canister Figure 10 PTB Com...

Страница 17: ...equipment malfunction The equipment is designed to operate safely under the following range of conditions Altitude up to 2000 m Temperature range of 0 to 40 C A maximum relative humidity of 95 RH non...

Страница 18: ...a dedicated circuit via a fused switched neon indication spur within 1 metre of the console position The spur must be clearly marked to identify it as the means for disconnecting the console Input pow...

Страница 19: ...shows the three designated knockouts one each on top left side and bottom through which power wiring can safely enter the TLS IB Figure 12 TLS IB Dimensions and Designated Conduit Knockouts 0 34 8 6...

Страница 20: ...lyester tape tinned copper drain wire 7 0 30mm Sheath PVC RZ FR hydrocarbon resistant colour blue radial thickness 0 80mm Diameter 6 10mm Conductor Resistance 25 ohm km Drain Wire Resistance 15 ohm km...

Страница 21: ...cessary preliminary work undertaken All necessary holes must be drilled through walls counters etc cable trays fitted ducting with draw cords installed and adequate access for the installation of the...

Страница 22: ...eet to meet intrinsic safety requirements Splices Veeder Root recommends that no splices be made in the wire run between a probe junction box and the console Each splice degrades signal strength and c...

Страница 23: ...each underground probe location install a 14 inch minimum diameter approved manhole according to the manufacturer s instructions Note probes should be located at least 24 inches from the submersible p...

Страница 24: ...tank is overfilled Install an optional split ring collar V R Part No 576008 617 onto the probe shaft to prevent the float from entering the riser pipe Probe riser pipe Tank B A C STP probes tankdia ep...

Страница 25: ...Installation Kit Part No 312020 984 Quantity Description Part Number 1 3 8 Flexible Conduit 5 feet long 576008 294 1 3 8 Adaptor Nut 329972 002 2 3 8 Straight Liquidtite Connectors and related parts...

Страница 26: ...to the 4 inch NPT riser Figure 16 and which is drilled and tapped for an included cord grip Figure 16 Cap and Cord Grip Kit METAL CAP AND RING KIT This riser cap kit contains a metal ring which screws...

Страница 27: ...the cap for a 1 2 14 NPT cord grip fitting thread Figure 18 3 Using UL classified pipe sealant suitable for the fuels involved to ensure watertightness screw a watertight riser cap cord grip fitting...

Страница 28: ...Specialty tools nylon strap oil filter wrench or equivalent and tighten the ring to 35 45 ft lbs Loosen the cord grip nut and push the cable through the metal cap and cord grip then clamp the cap onto...

Страница 29: ...uit Liquidtight fittings from AST kit Mag Probe rests on bottom probes astpbins eps Riser pipe 2 3 or 4 API schedule 40 depending on probe type A A 14 minimum for global mag plus mag plus probes When...

Страница 30: ...the building in a wiring trough only intrinsically safe wires from TLS IB probes can be in the trough Keep all low power intrinsically safe wiring physically isolated from high power wires in all wiri...

Страница 31: ...3 Do NOT terminate drain wire at this location ground drain wire at TLS IB only 4 Seal wire nuts with epoxy sealant following the instructions in Figure 24 CAUTION Epoxy sealant is irritating to eyes...

Страница 32: ...ie wrap Wire nuts From probe sensor or transducer A C B Make sure that the ends of cable sheathing are sub merged in sealant Instructions NOTE When temperature is below 50 F 10 C keep resin in a warm...

Страница 33: ...hout reprogramming the system Connecting Probes to the TLS IB Connect the two color coded marked wires from each probe to the appropriate connectors e g Probe 1 of the Probe Terminal Block as shown in...

Страница 34: ...t probes after the system has been powered they must be manually configured To configure probes for the TLS IB use either the IFSF command Nb Tanks No 1 seeTable 10 on page 41 or the RS 232 Set Tank C...

Страница 35: ...n installing servicing or replacing parts in the system or serious injury or death shock may occur For this system 1 Comply with the latest National Electric Code federal state and local codes and any...

Страница 36: ...elow U switch open up D set switch to closed position down For example to enter a IFSF node address of 06 set switches 2 and 4 up and switches 1 and 3 down Connecting Serial Communication Wiring to th...

Страница 37: ...k the electrical resistance between the console s metal case and the earthing ground wire s connection at the known good earth ground copper rod driven into ground etc It should read less than 1 ohm 2...

Страница 38: ...CLR N M L C L R R12 001 331470 R12 002 R12 003 R12 004 R12 005 R12 006 N L Power Wiring Connect neutral wire to upper terminal of J5 N Connect hot wire to lower terminal L C26 C28 L2 L4 POWER WIRING N...

Страница 39: ...ace in the door of the TLS IB without the use of screws There are two tabs on the top of the board that fit into two slots in the top edge of the door The bottom of the CPU board snaps in place betwee...

Страница 40: ...back to NML position 5 Disconnect the ribbon cable connector from the CPU board Remove the CPU board following the instructions in Replacing the CPU Board on page 34 6 Locate the PROM chip on the boar...

Страница 41: ...ND or equivalent Chip socket Removable chip Chip removal slots Lift up chip when it is free from socket Chip socket consoles h8remov1 eps Chip socket Incorrect Angle Correct Angle INCORRECT ANGLE CORR...

Страница 42: ...he CPU cable from the Power Supply board 3 Tag and disconnect probe power and overfill alarm relay wiring to the Power Supply board Y2 NODE ADDRESS 1 2 3 4 Y3 TLS IB CPU BOARD PROM chip U29 S1 STATIC...

Страница 43: ...igure also locates the IFSF LED D1 which indicates if the neuron application is or is not running If the IFSF status indication LED D1 remains lit replace the CPU board see Replacing the CPU Board on...

Страница 44: ...compliant UL cUL approved and ATEX approved Electrical Specifications TLS IB operating voltage 120 240 Vac 2 A max The Power Supply board fuses F1 and F2 are NOT field replaceable The rating for both...

Страница 45: ...e 27 on page 32 are shown in Table 8 Veeder Root RS 232 command protocol format applies Table 9 lists serial commands recognized by the TLS IB Table 8 TLS IB Serial Interface Connections J7 Connection...

Страница 46: ...and Tank Probe Error Code Database Table 14 A11 Probe Fast Average Buffers A12 Probe Standard Average Buffers Table 10 Tank Level Gauge Database Data Identification Data Element Name 1 Nb_Tanks 3 TLG...

Страница 47: ...2 TP_Status 33 TP_Alarm 64 Product_Level 68 Water_Level 100 TP_Status_Message Table 13 Tank Temperature Table Database Data Identification Data Element Name 1 Temp_height 2 Temp_value Table 14 Tank Pr...

Страница 48: ...For technical support sales or other assistance please visit www veeder com...