background image

1

  

Introduction 

This manual discusses removal of a TLS-350 console and replacing it with a TLS-450PLUS console. The instruc-
tions assume all site monitoring devices have been previously installed and site wiring is complete.

Contractor Certification Requirements

Veeder-Root requires the following minimum training certifications for contractors who will install and setup the 
equipment discussed in this manual:

Installer Certification (Level 1):

 Contractors holding valid Installer Certification are approved to perform wiring 

and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless 
equipment installation; tank and line preparation; and line leak detector installation.

Technician Certification (Level 2/3):

 Contractors holding valid Technician Certifications are approved to 

perform installation checkout, startup, programming and operations training, system tests, troubleshooting and 
servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection. In addition, 
Contractors with the following sub-certification designations are approved to perform installation checkout, startup, 
programming, system tests, troubleshooting, service techniques and operations training on the designated system. 

• Wireless 2
• Tall Tank

Warranty Registrations

 may only be submitted by selected Distributors.

Safety Precautions

The following safety symbols may be used throughout this manual to alert you to important safety hazards and 
precautions

EXPLOSIVE

Fuels and their vapors are extremely explosive if ignited.

FLAMMABLE

Fuels and their vapors are extremely flammable.

ELECTRICITY

High voltage exists in, and is supplied to, the device. A 
potential shock hazard exists.

TURN POWER OFF

Live power to a device creates a potential shock hazard. 
Turn Off power to the device and associated accessories 
when servicing the unit.

WARNING

Heed the adjacent instructions to avoid damage to 
equipment, property, environment or personal injury.

READ ALL RELATED MANUALS

Knowledge of all related procedures before you begin 
work is important. Read and understand all manuals thor-
oughly. If you do not understand a procedure, ask some-
one who does.

USE SAFETY BARRICADES

Unauthorized people in the work area are dangerous. 
Always use safety cones or safety tape to block access 
to the work area.

STATIC SENSITIVE COMPONENTS

Wear grounded anti-static wrist strap before handling 
the printed circuit board and mounted components.

OFF

Содержание TLS-350l

Страница 1: ...Manual No 577014 074 Revision A Upgrade Instructions TLS 350 To TLS 450PLUS Console...

Страница 2: ...ur Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Contact Veeder Root Customer Service at 800 873 3313 with the specific part numbers and quantities that were missing or received damaged 2 Fax...

Страница 3: ...ions Against Static Electricity 5 Comm Module Slots And Configurable ports 5 Connecting The Power Wires To The Console 8 Initial Startup Procedure For Sites Without Wireless 2 devices 10 For Sites Wit...

Страница 4: ...ation checkout startup programming system tests troubleshooting service techniques and operations training on the designated system Wireless 2 Tall Tank Warranty Registrations may only be submitted by...

Страница 5: ...AC power supply wires at the breaker until all devices are connected 2 Attach conduit from the power panel to the console s Power Area knockouts only 3 Comply with all applicable codes including the N...

Страница 6: ...ally safe wires are labeled and their polarity if applicable noted before removing them Verify all non intrinsically wiring connections are labeled before removing them 5 Unplug the high and low volta...

Страница 7: ...ight Connecting Wiring To Console Modules Refer to the appropriate Control Drawing on page 2 to identify modules that can be installed in the console and the designated devices that can be connected t...

Страница 8: ...ts 1 3 are available for user selectable Comm modules Figure 3 Slots 4 and 5 are fixed and can not be changed see Figure 4 2 Important to avoid attaching a Comm cable to a non configurable NC port ide...

Страница 9: ...6 18 35 BOTTOM VIEW tlsng dim eps Mounting flanges w 1 4 x 3 8 slotted hole typ 4 places 3 1 8 1 2 TYP 5 925 0 65 4 5 8 3 1 8 3 1 8 3 1 8 TOP VIEW Conduit entries to Module bay 3 4 1 I P S knockouts t...

Страница 10: ...3 2 1 4 4 5 L1 G N L2 Comm module clamp securing screw Slots 1 3 Selectable Comm Modules see Figure 3 Slots 4 and 5 Fixed Comm Modules see Figure 4 Slots 1 4 Any combination of USM I O MDIM or LVDIM...

Страница 11: ...The console is prepunched for conduit This should be large enough since the only wires going through this conduit will be for L1 neutral panel ground and earth ground and possibly 1 relay Refer to man...

Страница 12: ...elf adhesive label Re energize the circuit and start up the unit L1 N L2 L1 G L2 To 240 Vac breaker in power panel 240 Vac Power Input 120 Vac Power Input L1 BLK N L2 WHT N L2 BLK G GRN Barrier G Y L1...

Страница 13: ...LS 450PLUS and wait 5 minutes until the console s Discover Mode is complete 2 Setup the TLS 450PLUS FOR SITES WITH WIRELESS 2 DEVICES 1 Power up all wireless devices 2 Power up the TLS RF console and...

Страница 14: ...For technical support sales or other assistance please visit www veeder com...

Отзывы: