4
Insite360 Connect Installation Option - Scenario 1
Scenario 1 applies to sites where the Insite360 Connect connects to a free serial port in the TLS-300 or TLS-
350. If the TLS-350 has the optional BIR and a Dispenser Interface Module (DIM), Dispenser Volume Events will
be sent to the GVR cloud. The steps in this Insite360 Connect installation require cables contained in kit 330020-
833.
All wiring should be installed and connected in accordance with local regulations. To avoid
injury or property damage, use only the power supply provided with the Insite360 Connect.
1.
Connect the Insite360 Connect’s USB 1 Port to an available RS232 serial port on the ATG, using the USB
to Serial Adapter cable connected to either the DB9 female / DB9 male 6’ cable (Figure 2) or the DB9
female / DB25 male 6’ cable (Figure 3), depending on the ATG’s available serial port connector type.
The USB to Serial Adapter cable’s thumb screws need to be fully threaded into the 6' cable’s
standoffs, and the 6' cable’s thumb screws need to be fully threaded into the RS232 serial port.
2.
Connect the Ethernet Port on the Insite360 Connect to a modem, router, or network switch on your local
area network (LAN) using the kit’s Ethernet cable.
3.
Plug the power supply into the Insite360 Connect. Use the cable clamps and cable ties from the kit as
needed to properly route and secure the cables.
4.
Plug the power unit of the Insite360 Connect power supply into an available wall outlet.
5.
Review the Insite360 Connect Configuration section on page 12 to confirm device activation