Safety
Power-Up Sequence (Normal Usage)
Rev. D
Dimension 3100 Manual
31
2.6.3 Power-up Checklist (Service and Installation Only)
Power-up (Installation Only)
______
1.
Connect the facilities.
_______
Vacuum (VAC):
≥
24”Hg (IS3K acoustic hood only)
_______
Clean dry air (CDA): 60-100psi
______
2.
Verify that all system components are plugged into AC power with the correct voltage.
______
3.
Verify that all cables are connected properly.
______
4.
Verify that the computer, controllers, and monitors turn on simultaneously.
2.7
Power-Up Sequence (Normal Usage)
2.7.1 Prepare the System for Power-up (Normal Usage)
1. Verify that all system components are plugged into AC power with the correct voltage.
2. Verify that all moving parts are free of obstructions.
3. Verify that all cables are connected properly.
4. Turn on the computer using the push-button switch located on the front of the computer.
5. Turn on the monitors (2) using the push-button switches located on the front of the monitors.
6. Turn on the NanoScope controller using the power switch located on the rear of the
NanoScope controller.
7. Turn on the Dimension 3100 controller using the power switch on the rear of the Dimension
3100 controller.
Содержание Dimension 3100
Страница 12: ...xii Dimension 3100 Manual Rev D ...
Страница 20: ...List of Figures xx Dimension 3100 Manual Rev D ...
Страница 72: ......
Страница 106: ......
Страница 118: ......
Страница 214: ...Scanning Tunneling Microscopy STM Etching Tungsten Tips 194 Dimension 3100 Manual Rev D ...
Страница 222: ......
Страница 266: ......
Страница 274: ......