Head, Probe, & Sample Preparation
Basic AFM Operation
Rev. D
Dimension 3100 Manual
105
7.2.5 Remove the Dimension SPM Head
1. Tighten the screw located on the right side of the Dimension SPM head dovetail to release
the Dimension SPM head (see
Figure 7.2d
SPM Head Dovetail and Signal Connector
Note:
Dovetail engagement actuates with a spring. Failing to engage the spring-
loaded dovetail causes a large increase in image noise due to reduced rigidity of
the mechanical support of the SPM head.
2. Unplug the connector wire that runs from the SPM head to the Dimension base.
3. Carefully slide the Dimension SPM head up and out of the dovetail groove.
7.2.6 Install the Cantilever Holder
If you are changing cantilevers, we recommend you select
Stage
>
Load new sample
before
removing the old cantilever. The stage moves to the front of the Dimension base, which becomes
useful in laser alignment (refer to
for laser alignment). Because the laser sum signal
will reach zero once the cantilever is removed, the motor interlock will prevent this is in the future.
CAUTION:
When using the
Stage
>
Load New Sample
command, be sure
there are no objects taller than the height of the cantilever in-
between current location of the scanner and the front of the sample
chuck. An object in this path could damage the scanner and/or tip.
Dovetail Release
Screw
Connector
Содержание Dimension 3100
Страница 12: ...xii Dimension 3100 Manual Rev D ...
Страница 20: ...List of Figures xx Dimension 3100 Manual Rev D ...
Страница 72: ......
Страница 106: ......
Страница 118: ......
Страница 214: ...Scanning Tunneling Microscopy STM Etching Tungsten Tips 194 Dimension 3100 Manual Rev D ...
Страница 222: ......
Страница 266: ......
Страница 274: ......