
130-USM.01
User Manual VebaBox Accessories
21
4. Cut the tube to the correct length so that it fits between the
two brackets and hammer the side caps at both ends with the
M8 nut.
5. With the M8 bolt, you can temporarily hold the bracket in
place.
6. Slide the box until it almost reaches the top. Pull out the
hole where the drain hose will pass through the pipe and then
drill the hole here.
7. Slide the box all the way against the limit switch and install
the drain hose for condensate water.
8. Click on the supplied tension straps on the installation
guide.
9. Tighten the tension straps with constant force.
Содержание PSB 75 12 1 GL 0
Страница 4: ...130 USM 01 User Manual VebaBox Accessories 4...
Страница 7: ...130 USM 01 User Manual VebaBox Accessories 7 Component name 250Ah Models...
Страница 8: ...130 USM 01 User Manual VebaBox Accessories 8 75Ah and 150Ah models...
Страница 11: ...130 USM 01 User Manual VebaBox Accessories 11 How the control panel works...
Страница 16: ...130 USM 01 User Manual VebaBox Accessories 16...
Страница 17: ...130 USM 01 User Manual VebaBox Accessories 17...
Страница 19: ...130 USM 01 User Manual VebaBox Accessories 19...