6
Operation by the contractor
Menu functions in the company mode
68
Instruction manual DTCO 4.1 - Edition 02/2023 - BA00.1381.41 100 102
• Access to data from an inserted driver
card
• Access to the front interface for au-
thorised download of the mass
memory data
In the EU, the data must be downloaded
every 3 months from the mass memory.
In the following cases, it is also useful to
download the data:
• Sale of the vehicle
• Immobilisation of the vehicle,
• When replacing the DTCO 4.1
■ Menu functions in the
company mode
The navigation within the menu functions
always follows the same system.
If the company card is inserted into
drawer 2, all main menus which are as-
signed to this card drawer remain locked.
In this case, you can only display, print
out or download data from a driver card
inserted in card drawer 1.
First menu level – Standard values
■ Registration – inserting
company card
IMPORTANT
Operation by contractor equals the op-
erating mode “Company” as per Imple-
mentation Regulation (EU) 2016/799
Annex I C, as amended.
• Insert the company card into a free
card drawer;
.
By inserting the company card, the
language stored on the card is set on
the display.
IMPORTANT
You can set your preferred language in-
dividually.
The menu displayed guides you step by
step to the complete operational readi-
ness of the DTCO 4.1:
Содержание DTCO 4.1
Страница 1: ...www fleet vdo com Digital tachograph DTCO 4 1 Instruction manual for contractors and drivers...
Страница 13: ...For your safety Basic safety information Legal requirements Intended use 2...
Страница 74: ...Menus First menu level Standard values Second menu level menu functions 7...
Страница 117: ...Print Notes for printing Starting print Cancel print Replacing the printer paper Clear paper jam 9...
Страница 121: ...Printouts Retaining printouts Printouts examples Explanation to the printouts Data set for events or faults 10...
Страница 125: ...10 Printouts examples Printouts Continental Automotive Technologies GmbH 125...
Страница 127: ...10 Printouts examples Printouts Continental Automotive Technologies GmbH 127 Speeding events Technical data...
Страница 143: ...Maintenance and inspection obligation Cleaning Compulsory inspection 11...
Страница 150: ...Technical data DTCO 4 1 Paper roll 13...
Страница 153: ...Appendix Declaration of conformity Authorisations Optional accessories VDO online shop 14...
Страница 163: ...Change overview Release overview 15...
Страница 171: ......