
Orbiter Gold / Lite Owners Operation & Installation Guide
Page 4 © Video Controls Limited 2001 MNGLXXXX0901UK
Chapter 1
Installation
1.2
False Ceiling Model
Note:
The Orbiter Gold / Lite is designed to be mounted in
a flat ceiling installation. Mounting the Orbiter Gold
/ Lite in an angled ceiling installation will affect the
units centre of gravity and, consequently,
programmed tours will be affected.
Note:
The false ceiling kit requires a clear area of 270mm
diameter for installation. See Figure v for details.
Figure v Dimensions Required for False Ceiling Kit
Step
Instruction
1
Ensure that the false ceiling is able to support the weight
of the false ceiling kit. (1.25 kg)
2
Using the retaining ring as a template, cut a 160mm
diameter hole in the ceiling using an appropriate tool.
3
Drill three 6mm holes on the 186mm PCD to accept the
mounting studs.
50m m (2”)
LA N YA R D
R E TA IN IN G
D IS C
270m m (10.7”)
148m m (5.9”)
145m m (5.8”)
75m m (3”)
Содержание Orbiter Gold Microspheres
Страница 2: ......