Self-help
124
9. Connect the red
+
power supply lead on
the compressor to the battery jump
start terminal, for jump start terminal -
see page 117.
10. Connect the black
-
power supply lead
to a suitable earth point, e.g. engine
block or engine support bracket - see
illustration above.
11. With the engine running, set the rocker
switch on the compressor to
I
. The tyre
is filled with sealant.
12. While the sealant bottle drains (approx.
30 seconds) the pressure indicator on
the compressor briefly points to 6 bar
(87 psi). Pressure then sinks again.
13. All of the sealant is pumped into the
tyre and then the tyre is filled with air.
The prescribed tyre inflation pressure
(see page 159) should be reached within
10 minutes. Switch off the compressor
when the correct pressure is obtained.
Содержание MOVANO
Страница 1: ...M OVA N O MOVANO Operation Safety and Maintenance Owner s Manual...
Страница 2: ...VAUXHALL Movano Operation Safety Maintenance...
Страница 5: ......
Страница 11: ...6 In brief...
Страница 156: ...Vehicle care 151...
Страница 163: ...158 Technical data Weights approx kg optional equipment Accessories MTA Tecshift transmission Weight 8...
Страница 172: ...Technical data 167...