Vatech PaX-i Insight Скачать руководство пользователя страница 96

7. Setting up PC 
 

86 

PaX-i Plus / Insight (Model: PCH-30CS) Installation Manual 

4. 

Confirm the result after connections are as same as below. 

 

 

The illustrations may differ from the actual product. 

 

 

 

 

 

 

 

Содержание PaX-i Insight

Страница 1: ...Installation Manual Full version Model PCH 30CS Version 1 42 English ...

Страница 2: ......

Страница 3: ... manufacturer reserves intellectual property rights IPR for this manual and the equipment described herein This IPR is protected by related laws and reproduction of this manual in part or in full is prohibited without the prior written consent of the Manufacturer This Equipment is covered by one or more of the patents and published patent applications including US8634515 US9117301 US9486174 KR1032...

Страница 4: ...Notice ii PaX i Plus Insight Model PCH 30CS Installation Manual Manual Name PaX i Plus Insight Model PCH 30CS Installation Manual Document number VDH IM 070 Version 1 42 Publication Date 2022 07 ...

Страница 5: ...vice on a flat surface to maintain stability If the equipment is not stable property damage and or personal injury may occur Do not push or pull the equipment Equipment should only be installed by an authorized technician complying with proper installation procedures Failure to read and understand the information provided in this manual may result in physical injury damage to the equipment or equi...

Страница 6: ...Important Notes iv PaX i Plus Insight Model PCH 30CS Installation Manual This Page Intentionally Left Blank ...

Страница 7: ...fications 14 2 5 Exposure Switch Installation Options 15 2 6 Installation Versions 17 2 7 Installing the Warning Lamp and Door Interlock Switch 19 2 8 Installing the Emergency Stop Switch 19 3 Before Installing the System 20 3 1 Required Tools 20 3 2 Checking the ShockWatch and TiltWatch Indicators 22 3 3 Unpacking Boxes 23 3 4 Checking the Parts 30 4 Installing the Equipment Base Stand Optional 3...

Страница 8: ...he CEPH Unit Optional 70 5 6 Connecting the Cables to the Equipment 70 5 7 Leveling the Equipment 71 5 9 Tightening the Bolts 74 6 Completing Miscellaneous Works 75 6 1 Assembling Base Cover Optional 75 6 2 Assembling the Temple Supports and the Chinrest 77 6 3 Installing the Switch Holders 78 7 Setting up PC 79 7 1 Direct Connection Diagram 79 7 2 The Recommended PC Requirements 80 7 3 Installing...

Страница 9: ...5 9 5 Setting up the User Information 107 10 Technical Specifications 121 10 1 Mechanical Specifications 121 10 2 Environmental Specifications 123 10 3 Reconstruction Time 123 Appendix 124 A Installing the Warning Lamp and Door Interlock Switch 124 B Installing the Emergency Stop Switch 127 C Limiting the Column Height 128 D Connecting the 3rd party Exposure Switch Optional 132 E Checking PC BIOS ...

Страница 10: ...Table of Contents viii PaX i Plus Insight Model PCH 30CS Installation Manual This Page Intentionally Left Blank ...

Страница 11: ...al condition by the user s manual PC Software has been properly used by the manufacturer s installation instructions and user manuals 1 2 Customer s Responsibility Site planning and preparation are the responsibility of the customer The following points should beconsidered fundamentally important to all customers of this product Install all required materials prior to delivery of the system Comple...

Страница 12: ...RNING Indicates information that should be followed with the utmost care Failure to comply with a warning may result in severe damage to the equipment or physical injury to the operator and or patient CAUTION Indicates a situation that demands prompt and careful action a specific remedy or emergency attention IMPORTANT Indicates a situation or action that could potentially cause problems to the eq...

Страница 13: ...l 3 English Never touch or hold the Sensor or Tube Head areas while moving installing or operating the equipment Do not use the electrical power drill during installation unless it can do so Do not use the electrical power drill during installation unless it can do so ...

Страница 14: ...S Installation Manual The recommended holding area during transportation is as below Three installers are required to install the equipment safely The Main Power Switch and Emergency Stop Switch are located at the bottom of the Vertical Frame as below ...

Страница 15: ...1 3rd edition 2005 Any equipment not approved by VATECH must comply with the applicable standards IEC 60950 1 2nd edition 2005 for IT equipment Ex PC and IEC 60601 1 3rd edition 2005 for medical electrical equipment All operators of this equipment are responsible for ensuring that the requirements outlined in IEC 60601 1 1 3rd edition 2005 Safety Requirements for Medical Electrical Equipment are f...

Страница 16: ...tro medical systems IEC 60364 7 710 2002 It is strongly recommended that a UPS be installed at the same time as the equipment The equipment PC and all peripheral devices must be well grounded Warnings Regarding X ray Radiation Failure to install this equipment in an approved location may be dangerous to the patient and operator Stationary radiation shielding must be installed to protect the operat...

Страница 17: ...nology Equipment IEC60601 2 7 and IEC60601 2 28 X ray Tube Heads IEC60364 7 710 2002 Local Code Requirements for Electro Medical System Installation IEC 60601 1 1 2005 regulation shall be met to their full extent for the safety of the patients operators and the environment when any person assembles or modify a medical electrical system by combing it with other equipment Any equipment not provided ...

Страница 18: ...mbols Symbols Description Location Dangerous voltage Power board Inverter board Monoblock Protective earth Ground Column Off power disconnected to the Main Power Switch Main Power Switch On power connected to the Main Power Switch Main Power Switch Warns ESD hazard MCU board Board package ...

Страница 19: ...erator and the operator should be as near to the patient as possible This equipment should not be installed on thick carpets for stability reasons Anti static floor materials should be used on the equipment The PC monitor emergency cut off switch and X ray Exposure Switch should be installed near the operator so that he or she can manage them simultaneously in case of emergency Without CEPH Unit o...

Страница 20: ...2 Choosing an Installation Site 10 PaX i Plus Insight Model PCH 30CS Installation Manual With CEPH Unit optional 2 805 L x 2 233 mm W or wider Ceiling Height 2 420 mm H or higher ...

Страница 21: ...width of the Entrance The door of the X ray room should have a clearance of more than 800 mm 31 5 wide Floor Area The floor of the X ray room must be stable and level for system balance The floor must be able to support a minimum weight of 500 kg m2 110 lbs feet2 Protection against Radiation To protect against radiation hazards follow all federal and municipal requirements During exposure the oper...

Страница 22: ...he same MPSO Use a dedicated power outlet for the power cord Failure to do so may result in unstable system operation caused by power fluctuations It is strongly recommended that you install an AVR An AVR automatic voltage regulator maintains a constant voltage and allows for continuous operation in the event of power fluctuation Item Description Power supply voltage 100 240 V Frequency 50 60 Hz P...

Страница 23: ...central distribution panel with an over current circuit breaker rated for 20A must be used Maximally allowed deviation of the tube voltage tube current exposure time Tube Voltage kVp 10 Tube Current mA 20 Exposure Time s 5 50 ms according to IEC 60601 2 63 The mains resistance should not exceed 0 045 ohms at 100 V and 0 19 ohm at 240 V This equipment should be connected to the earthed outlet ...

Страница 24: ...S Installation Manual 2 4 Environmental Specifications Item Description During Operation Temperature 10 35 Relative humidity 30 75 Atmospheric pressure 860 1060 hPa During Transport and Storage Temperature 10 60 Relative humidity 10 75 Atmospheric pressure 860 1060 hPa ...

Страница 25: ...ions There are three options for installation depending on the configuration of the site Nevertheless the 2nd option is preferred Option No 1 The user operates the Exposure Switch from inside the X ray room Option No 2 The user operates the Exposure Switch from outside the X ray room The Exposure Switch holder is mounted on the wall ...

Страница 26: ...PaX i Plus Insight Model PCH 30CS Installation Manual Option No 3 The 3rd party Exposure Switch not VATECH s is used on the demand of the customers For this scenario see Appendix D Connecting the 3rd party The Exposure Switch for details ...

Страница 27: ...2 Choosing an Installation Site PaX i Plus Insight Model PCH 30CS Installation Manual 17 English 2 6 Installation Versions Base stand Type ...

Страница 28: ...2 Choosing an Installation Site 18 PaX i Plus Insight Model PCH 30CS Installation Manual Wall mount Type ...

Страница 29: ... ray is energized The warning lamp and Door Interlock Switch are not included in the equipment The warning lamp and the Door Interlock Switch must be installed by a qualified technician 2 8 Installing the Emergency Stop Switch Refer to Appendix B for a complete installation guide Install the Emergency Stop Switch along with the main power cable in the central distributionpanel Install this switch ...

Страница 30: ...checklist No 3 through No 6 in the Appendix F Installation Checklist 3 1 Required Tools The following tools are necessary to install the PaX i Plus Insight Item Figure Size Wrench Set 1 5 mm 10 mm 0 06 0 4 T shaped Hex Wrench 6 mm 10 mm 0 24 0 4 Hex Wrench w Handle 6 mm 10 mm 0 24 0 4 Ratchet Wrench Tips 3 mm 8 mm 0 12 0 3 Needle nose Pliers Regular Monkey Wrench n a Spanner Wrench n a ...

Страница 31: ...igure Size Cross Head Screw Driver w Magnetic Tip L 200 mm 7 9 Spirit Level n a Anti Static Glove n a Knife n a Tape Ruler for Wall Mount type 5 m Marker Pen thick tip for Wall Mount type n a Hammer for Wall Mount type n a Multimeter n a Hammer Drill for Wall Mount type L 200 mm 7 9 Transport Dolly n a ...

Страница 32: ...as suffered any physical impacts during transportation However a red indicator does not necessarily mean that the unit has been damaged These indicators are affixed only to the main box which contains the equipment very sensitive to external impacts Check the followings before opening each package 1 These indicators are affixed only to the main box which contains the equipment very sensitive to ex...

Страница 33: ...s equipment are recyclable Return the packaging to VATECH representatives or dispose of it in compliance with the legal regulations of your country 3 3 1 Box No 1 Main Box Component Size mm inch Weight kg lbs Column and Rotating Unit Assembly Accessories and Parts PC System Optional Monitor Optional 1 710 L x 680 W x 1 100 H 67 L x 27 W x 43 H 145 320 Main Box ...

Страница 34: ...l Removing the Cover 1 Move the Main Box to a convenient place as close as possible to the installation location 2 Remove the Top Cover 3 Remove a single side cover In case of unable to lift the side cover up fully due to ceiling height cut the box in half using the utility knife instead ...

Страница 35: ... 4 Put the PC System Optional down on the floor 5 Separate two side EPS A B The resulting view is as follows Do not discard these EPS A B so that they are reused later when the CEPH unit is installed 6 Separate two side EPS A B The resulting view is as follows 7 Remove the case column front cover ...

Страница 36: ...3 Before Installing the System 26 PaX i Plus Insight Model PCH 30CS Installation Manual The view after removal of the EPS is as below ...

Страница 37: ...Plus Insight Model PCH 30CS Installation Manual 27 English 3 3 2 Box No 2 Base Unit Component Size mm inch Weight kg lbs Base 1046 L x 1056 W x 185 H 41 L x 41 5 W x 7 H 47 103 Removing the cover 1 Open the box cover the Base Cover appears ...

Страница 38: ...3 Before Installing the System 28 PaX i Plus Insight Model PCH 30CS Installation Manual 2 Remove the upper box the Base Unit appears ...

Страница 39: ...CS Installation Manual 29 English 3 3 3 Box No 3 CEPH Unit Optional Component Size mm inch Weight kg lbs CEPH unit 1590 L x 820 W x 870 H 62 6 L x 32 3 W x 34 3 H 50 110 Removing the cover 1 Open the box cover and remove the packing material as shown in the figure ...

Страница 40: ...3 Before Installing the System 30 PaX i Plus Insight Model PCH 30CS Installation Manual 3 4 Checking the Parts 3 4 1 Location Layout of the Parts and Accessories ...

Страница 41: ...Confirmed OK 1 Manuals User Manual 1 Yes No Installation Manual 1 Yes No 2D Viewer Manual 1 Yes No Installation CD or USB 1 Yes No USB Key 2D Viewer key 1 Yes No 2 Exposure Switch 1 Yes No Exposure Switch Holder 1 Yes No Up Down Switch Holder 1 Yes No Double Sided Sticker 1 Yes No Screws M3 x 16 3 Yes No 3 Hand Plate Carpus 1 Yes No Handrest Sticker 1 Yes No 4 Plate Align Wall 1 Yes No ...

Страница 42: ...es 1 pair Yes No 7 Chin Block High ABS WHITE 1 Yes No 8 Blank 9 Blank 10 Blank 11 Pano Cover Box PP BAG 1 Yes No 12 Chin Bite PC transparent Black 1 Yes No Deep PC transparent Black 1 Deep Bite Block is only available in some Asian countries Yes No Chin Bite 2 PC transparent Black 1 Yes No Sinus TMJ Bite 1 Yes No 13 Blank 14 Cap For Ear Rods 2 2 CEPH Option 2 on the equipment Yes No Silicon Cover ...

Страница 43: ...on Figure QTY Comments Confirmed OK 15 Blank 16 Silicon Cap White 18 Yes No 17 Base Cap 1 4 Yes No Base Cap 2 3 Yes No 18 Blank 19 Blank 20 Cable Tie 10 Yes No 21 Frame Grabber System Optic Cable 1 Yes No FTG Card or VTG Card 1 Yes No 22 Wall Bracket 2 1 Yes No Protractor 1 Yes No 23 Wrench Bolt M10 x 20 w Spring 4 Yes No ...

Страница 44: ... No 25 Wrench Bolt M8 x 45 w Spring and Flat Washers 4 Yes No 26 Truss Bolt M5 x 8 3 Yes No 27 Truss Bolt M4 x 8 10 Yes No 28 Plate Switch Recta ngle One Switch C0000009 1 For domestic only Yes No 29 Wrench Bolt M8 x 20 w Spring and Flat Washers 4 Yes No 30 Set Screw M10 x 20 4 Yes No 31 Wall Plate 1 Yes No Terminal Block 3 Pole 1 Yes No 32 Blank 33 Up Down Switch 1 Yes No Up Down Switch Holder 1 ...

Страница 45: ...AM8N 4 column Yes No Wrench Bolt M10 L20 w Spring Washer 4 Yes No Ficher strong anchor M8 x 30 EAM8N 4 wall Yes No Hex Bolt M8 L15 w Spring Washer 4 Yes No Wood Screw M8 x 60 4 wall Wood Yes No Wood Screw M12 x 70 2 base Yes No Wrench Bolt M8 x 25 w Spring and Flat Washers 2 wall Bracket Yes No Nut M8 2 wall Bracket Yes No 35 Wall Bracket 1 1 Yes No Wall Bracket 2 1 For America only Yes No ...

Страница 46: ...talling the Equipment Base Stand Optional 4 1 Unloading the Base and Main Unit 1 First unload the Main Unit on the floor Place some protective stuff on the floor to avoid the scratches on the surface One installer should keep on holding the Vertical Frame area to keep the equipment stable after it is unloaded ...

Страница 47: ...nglish 2 Put the Main Unit back on the master packing EPS and remove the protective plastic cover with a knife Then put the cables down on the floor carefully Be careful not to damage the cables or have the column surface scratched 3 Assemble two wrench bolts as shown below Wrench Bolt M10 x 25 Part No 24 ...

Страница 48: ...4 Installing the Equipment Base Stand Optional 38 PaX i Plus Insight Model PCH 30CS Installation Manual 4 Remove the carrying handle at the bottom of the column unit Allen Wrench 6 mm 0 24 ...

Страница 49: ...he Base with the Column Unit If the installation site is a concrete floor go to section 4 5 Fixing the base Optional and do number 1 first after that turn back 4 2 Assembling the Base with the Column Unit 1 Hang the base unit onto two bolts temporarily as shown below An installer should hold the base unit to keep it from falling ...

Страница 50: ...Insight Model PCH 30CS Installation Manual 2 Fasten the Base Unit with two Wrench Bolts Allen Wrench 8 mm 0 3 Wrench Bolt M10 x 20 w Spring Part No 23 Put the bolts into the holes until about 20 mm are left outside 3 Tighten two Wrench Bolts firmly as shown below ...

Страница 51: ...English 4 Put the equipment in a vertical position slowly while holding the upper handle Be sure not to damage the cables Before erecting the equipment keep them clear of the equipment 5 Tighten the three Wrench Bolts to attach the base unit Allen Wrench 8 mm 0 31 Wrench Bolt M10 x 20 w Spring Part No 23 ...

Страница 52: ...2 PaX i Plus Insight Model PCH 30CS Installation Manual 4 3 Removing the Transportation Handle without the CEPH unit 1 Remove the upper carrying handles Allen Wrench 6 mm 0 24 One installer should hold the handle while the other is removing the bolts ...

Страница 53: ...l and Column Brackets Assembling the Column Bracket 1 Remove the plastic wrap covering the column unit by using a cutter 2 Prepare the column bracket Wall Bracket 2 Part No 22 3 Attach the above bracket to the back of the column with the four Wrench Bolts Wrench Bolt M8 x 20 w spring and flat washers Part No 29 Allen Wrench 6 mm 0 24 ...

Страница 54: ... Column and Wall Brackets 1 Prepare the wall bracket Wall Bracket Part No 35 2 Combine the column and wall brackets in the following manner with the 2 Wrench Bolts Allen Wrench 6 mm 0 24 Wrench Bolt M8 x 25 w Spring and Flat Washers Part No 34 Monkey Wrench n a Nut M8 Part No 34 Do not tighten the bolts fully yet ...

Страница 55: ...tion Manual 45 English Marking Points on the Wall 1 Move the equipment to the installation site as close as possible 2 Adjust the distance between the wall and equipment by moving it slightly so that the wall bracket touches the wall 3 Mark four anchor bolt locations on the wall Marker n a ...

Страница 56: ...ll the wall holes of size 10 5 mm x 30 mm depth using the concrete hammer drill 2 Remove the debris and clean the holes using the dust pump 3 Using the hammer insert a Ficher strong anchor into the hole Ficher Strong Anchor M8 x 30 Hammer N A 4 Using the hammer insert an EHS tool into the inner bolt EHS Tool EAW H 8x30 Hammer N A ...

Страница 57: ...ent on the alignment plate while observing 4 Hex bolts are being inserted properly through each hole Hex Bolt M8 x 15 Spring Washer M8 Flat Washer M8 Torque Wrench Spanner type 2 Remove the middle carrying handle If the CEPH unit is to be installed this is used as the carrying handle Do not detach it until indicated later after the equipment is moved to the installation site ...

Страница 58: ...Removing the Transportation Safety Bolts 1 Remove the semi transparent tape on both sides of the vertical top cover When removing the semi transparent tape be careful not to scratch the surface of the equipment 2 Remove the vertical top cover 3 Remove the safety lock bolt with a wrench Allen Wrench 6 mm 0 23 ...

Страница 59: ...ptional Never hold the areas of the collimator sensor and tube head 1 Now it is assumed that the CEPH box has already been opened 2 Remove the plastic wrap covering the column unit and the tape for fixing the CEPH cables by using a cutter 3 Move and mount the CEPH unit on the Main Unit carefully while observing the insertion state of 4 studs ...

Страница 60: ... bolts to attach the base unit Allen Wrench 6 mm 0 24 Wrench Bolt M8 x 45 w Spring and Flat Washers Part No 25 When fastening a bolt make sure that the cable is not stuck on the surface When removing the semi transparent tape be careful not to scratch the surface of the equipment 5 Connect the cable to the CEPH unit and main unit ...

Страница 61: ...of the MCU board 5 Connect the H002040A fiber optic cable to the CEPH port of the optic hub When handling fiber optic cable Do not bend pull and or crushing it Ensure that the caps of the fiber optic cable be removed Do not touch the tip of the fiber optic cable to prevent it from being dirty Insert the fiber optic cable fully until the click sound is heard ...

Страница 62: ...er n a Ficher Strong Anchor M10 x 40 Part No 34 Allen Wrench 8 mm 0 3 Wrench Bolt M10 x 25 w Spring and Flat Washers Part No 24 1 Put the base unit on the installation site and mark 2 locations on the floor before installing the equipment 2 Drill the floor holes of size 12mm x 30mm depth using the concrete hammer drill 3 Remove the debris and clean the holes using the dust pump ...

Страница 63: ...Stand Optional PaX i Plus Insight Model PCH 30CS Installation Manual 53 English 4 Secure the anchor bolts with the hammer 5 Place the base unit combined equipment in the proper position lock the nuts and washers using a ratchet wrench ...

Страница 64: ...ing the Equipment Base Stand Optional 54 PaX i Plus Insight Model PCH 30CS Installation Manual Wooden Floor Wood Screws M12 x 70 Part No 34 Hammer Drill L 200 mm 7 9 1 Secure the base unit using the wood screws ...

Страница 65: ...onal PaX i Plus Insight Model PCH 30CS Installation Manual 55 English 4 8 Connecting the Cables to the Equipment 1 Connect the cables in the back of the column as shown in the figure Optic Cable Cable No H002040A Part No 21 Cable Tie Part No 20 ...

Страница 66: ...the Equipment Base Stand Optional 56 PaX i Plus Insight Model PCH 30CS Installation Manual 2 Use the Cable Tie Part No 20 or Cable Holder Part No 20 to fix the cables as shown below after the connection is completed ...

Страница 67: ...Level n a Ensure that the Spirit Level should rest only on the locations indicated in the following figures to obtain the accurate center 1 Prepare the Spirit Level 2 Turn the Rotating Unit clockwise so that the X ray tube head faces the front as shown in the figure 3 Remove the case column front 4 Turn all screws on the base plate unit clockwise until they touch the ground ...

Страница 68: ...i Plus Insight Model PCH 30CS Installation Manual Leveling Right and Left 1 Place the Spirit Level as shown in the figure 2 Adjust the base until the bubble on the Spirit Level centers in the middle by turning left and right screws clockwise or vice versa ...

Страница 69: ...e Vertical Frame as shown in the following figure 2 Adjust the screws until the bubble of Spirit Level centers level by turning the front and or back screws clockwise or vice versa 3 When the leveling is completed make sure that all eight set screws touch the floor by turning them clockwise if necessary 4 Assemble the vertical top cover 5 Assemble the case column front ...

Страница 70: ...ch 8 mm 0 3 Allen Wench 10 mm 0 4 Spirit Level n a Ensure that the Spirit Level should rest only on the locations indicated in the following figures to obtain the accurate center Verify the Ceph unit is level on all four sides front back right and left and adjust the level as necessary Leveling the Front and Back Leveling the Right and Left ...

Страница 71: ...on Manual 61 English When the Ceph unit is tilted to the right or left 1 To adjust the Align bolt untighten four Wrench Bolts M8 slightly 2 Adjust the level of the Ceph unit on both the right and left sides until the bubble on the Spirit Level sensors in the middle by adjusting Align Bolt M10 ...

Страница 72: ...completed tighten four Wrench Bolts M8 of the Main unit fully When the Ceph unit is tilted to the front or back 1 Untighten four Wrench Bolts M8 of the Ceph unit slightly 2 Align the level of the Ceph on both the front and back sides unit until the bubble on the Spirit Level centers in the middle by adjusting the Align Bolt M10 ...

Страница 73: ...4 Installing the Equipment Base Stand Optional PaX i Plus Insight Model PCH 30CS Installation Manual 63 English 3 When the aligning is completed tighten four Wrench Bolts M8 fully ...

Страница 74: ... Installing the Equipment Base Stand Optional 64 PaX i Plus Insight Model PCH 30CS Installation Manual 4 11 Tightening the Bolts 1 Tighten the joint bracketbolts Allen Wrench 6 mm 0 24 Monkey Wrench n a ...

Страница 75: ...Installing the Equipment You are advised to plan and study the installation environment carefully in advance before proceeding since the installation involves drilling the wall and floor Pre installation planning is crucial to a successful installation Accurate marking is of critical importance for a successful installation Installation Overview ...

Страница 76: ...ht Model PCH 30CS Installation Manual Marking Points on the Floor 1 Put the aligning plate on the floor near the wall where the equipment should be installed as shown in the figure Alignment Plate Part No 4 2 Mark 6 anchor bolts holes on the floor Marker n a ...

Страница 77: ...g plate 2 Drill the floor holes size 10 5 x 30 mm by using the concrete hammer drill 3 Remove the debris and clean the holes withthe dust pump 4 Put the Ficher strong anchor bolts into the holes and attach them with the hammer Verify that the Ficher strong anchor s are secured Ficher Strong Anchor M10 x 40 Part No 34 Hammer Drill L 200 mm 7 9 ...

Страница 78: ...Anchor Bolts 1 Put the aligning plate on the floor while making sure that the align plate s holes engage in the anchored bolts 2 Put the equipment in a vertical position slowly while holding the upper handle as shown in the figure Be careful not to damage the cables before erecting the equipment Keep them clear of the equipment ...

Страница 79: ...4 Put the washers and nuts into the six anchored bolts on the floor and tighten the nuts loosely Make sure that you put the fasteners in the sequence as shown in the figure Allen Wrench 8 mm 0 3 Wrench Bolt M10 x 20 w Spring Part No 23 Do not tighten the nuts until the leveling is completed While one installer is tightening the nuts the other installers should hold the middle handle to prevent the...

Страница 80: ...alling the Wall and Column Brackets Please refer to section 4 4 Installing the Wall and Column Brackets 5 4 Removing the Transportation Safety Bolts Please refer to section 4 5 Removing the Transportation Safety Bolts 5 5 Installing the CEPH Unit Optional Please refer to section 4 6 Installing the CEPH Unit Optional 5 6 Connecting the Cables to the Equipment Please refer to section 4 8 Connecting ...

Страница 81: ...T shaped Hex Wench 8 mm 0 3 Spirit Level n a Ensure that the Spirit Level should rest only on the locations indicated in the following figures to obtain the accurate center 1 Prepare the Spirit Level 2 Turn the Rotating Unit clockwise so that the X ray tube head faces the front as shown in the figure 3 Remove the column front case ...

Страница 82: ...allation Manual 4 Put the set screws into the four holes and turn them clockwise with the hex wrench until they touch the aligning plate T shaped Hex Wench 8 mm 0 3 Set Screw M10 x 20 Part No 30 5 Put the Spirit Level on the location as shown in the figure Leveling Right and Left ...

Страница 83: ...PCH 30CS Installation Manual 73 English Leveling the Front and Back 6 Assemble the vertical top cover 7 Turn each set screw clockwise or counterclockwise to make the equipment level while another person monitors the level indicator 8 Assemble the column front case ...

Страница 84: ...unt 74 PaX i Plus Insight Model PCH 30CS Installation Manual 5 8 Tightening the Bolts 1 Tighten the joint bracketbolts Allen Wrench 6 mm 0 24 Monkey Wrench n a Allen Wrench 8 mm 0 3 2 Tighten the nuts in the anchored bolts on the floor ...

Страница 85: ...ing Miscellaneous Works 6 1 Assembling Base Cover Optional When removing the semi transparent tape be careful not to scratch the surface of the equipment 1 Assemble the base cover Base Cover 2 Fix the base cover with 3 truss bolts Truss Bolt M5 x 8 Part No 26 Cross Head Screw Driver w Magnetic Tip 6 mm 0 24 ...

Страница 86: ...6 Completing Miscellaneous Works 76 PaX i Plus Insight Model PCH 30CS Installation Manual 3 Cover the holes Cap1 3 Cap2 6 Base Caps 1 Part No 17 Base Caps 2 Part No 17 ...

Страница 87: ...hinrest Assembling the Temple Supports and the Bite Block should be done after Acquiring a test image is completed 1 Insert the normal Chinrest and the normal Bite Block into the unit Chin Block High Part No 7 Chin Bite Part No 12 Chin Bite 2 Part No 12 2 Insert the Temple Supports Temple Supports 1 set Part No 5 Cap Ear Rods 1 set Part No 5 ...

Страница 88: ...ws M3X16 Part No 2 Up Down Switch Holder 1 Peel out the papers on the double sided sticker 2 Attach the switch support to a suitable height on the left of the column Exposure Switch Holder 1 Locate the Exposure Switch Holder with a sticker and three screws 2 Install the Exposure Switch Holder on the wall at the appropriate height using three screws Up Down Switch When the installation of the Up Do...

Страница 89: ...H 30CS Installation Manual 79 English 7 Setting up PC 7 1 Direct Connection Diagram Fiber Optic Cable Used to transfer image data to thePC Warning System Panel Used to provide a visible indicator Light on when the equipment is irradiating X ray ...

Страница 90: ... supply it is strongly recommended to use the AVR automatic voltage regulator to keep the line voltage stable The PC system provided with the PaX i Plus Insight undergoes the rigorous test for software compatibility before shipping Therefore any later changes to the hardware and or software may cause malfunction PaX i Plus Item Specifications CPU Intel Core i3 7100 3 9GHz 3MB Cache 2cores Chipset ...

Страница 91: ...CC 2X8GB Unbuffered RAM Hard disk drive 1TB SATA 7200 1st HDD Graphic board NVIDIA GTX 1050Ti Ethernet interface Integrated Intel I218LM PCIe GbE Controller Serial Port RS232 PCIe type RS232 Port Power supply 400W 90 efficiency Slots 2 PCIe Gen3 x 16 slot 1 PCIe Gen3 x 8 slot 1 PCIe Gen2 x 4 slot 1 PCIe Gen2 x 1 slot 1 PCIe 32bit 33MHz CD DVD drive DVD RW Operating system Windows 10 Professional 6...

Страница 92: ...creen type Windows Defender in the search box 2 Click the Windows Defender icon to start Windows Defender on the search result 3 Click the Settings icon 4 On the Settings window click Add an exclusion in the Exclusions section 5 On Select Folder window type C VcaptureSW in the folder field and click Exclude this folder ...

Страница 93: ...ing the power cord from the main outlet or PC Disregard this section in case the PC system is supplied with the equipment The peripherals have already been installed inside the PC Whenever handling the fiber optic frame grabber board 1 Wear the anti static glove 2 Do not wear the likes of a thick jacket The following figures and descriptions are based on the PC model Z440 from HP ...

Страница 94: ...ile 2 Open the PC cover 3 Insert the fiber grabber board Part No 21 carefully into that PCIe2 x 4 slot and lock it or Double check the locking status between the board and its holder after the board installed A bad insertion of the board into the PC slot could cause failure for Dark calibration data acquisition or noisy image acquisition 4 Put the slot holder back to its initial position ...

Страница 95: ...from the bad cable or its bad contact condition Connect the regular cables for PC keyboard mouse and video in advance The following figures and descriptions are based on the recommended PC system described in 7 2 The Recommended PC Requirements Fiber Optic Cable Part No 21 EzDent I USB Key Part No 1 1 Remove the caps of the fiber optic cable 2 Connect the Fiber Optic Cable 3 Insert the EzDent i US...

Страница 96: ...7 Setting up PC 86 PaX i Plus Insight Model PCH 30CS Installation Manual 4 Confirm the result after connections are as same as below The illustrations may differ from the actual product ...

Страница 97: ...on of images should be installed on the formatted PC where no other program s except the operating system OS is present Before InstallShield installation ensure that the video card driver installed on the PC is the most up to date version To check this go to the website of the graphics card manufacturer Checking PC BIOS Settings Generally the PC is shipped with its BIOS settings as specified in Ap...

Страница 98: ...mission For this reason it is required to disable the Windows Firewall by using the following procedures 1 Open the Start screen type Windows Firewall in the search box 2 Click the Windows Firewall icon to start the Windows Firewall on the search result 3 On the Windows Firewall screen click the Turn Windows Firewall on or off 4 Select the Turn off Windows Firewall for both Home or work private an...

Страница 99: ...t Options To avoid disruptive and abnormal operation while acquiring an image it is required to reconfigure some parameters on the Windows operating system Disable the Screen Saver 1 Open the Start screen type Screen Saver in the search box 2 On Screen Saver Settings screen select None in the pull down menu 3 Click OK to apply the settings ...

Страница 100: ...ion Manual Selecting the Power Options Monitor and System 1 Open the Start screen type Power Options in the search box 2 Click Choose when to turn off the display 3 Select Never for both Turn off the display and Put the computer to sleep fields 4 Click Save changes to apply the settings ...

Страница 101: ...l PCH 30CS Installation Manual 91 English 8 4 Turning off the User Account Control 1 Open the Start screen type User Account Control in the search box 2 Disable the UAC by moving the slider bar down to the bottom Never notify Then click OK to apply change settings ...

Страница 102: ... all scans performed by the anti virus software For the PaX i Plus Insight the following folders and files inside for relevant software should be excluded from the virus scan Path Software C ProgramFiles Vatech EzDent i C VCaptureSW Console Software Suppose the anti virus program from McAfee is running in the background The procedure to set folder exclusions is similar for most anti virus programs...

Страница 103: ...on and view on the same PC There may be subtle conflicts between them leading to the malfunction The image viewer program such as EzDent i or the one from the 3rd party should be installed in advance before the InstallShield installation For the information on their installation procedures refer to the corresponding manuals Before InstallShield installation ensure that the video card driver instal...

Страница 104: ...allation Manual 9 2 Software Installation Flow 9 3 Installing Image Viewer Program One of the image viewer programs among EzDent i or 3rd party program must be installed at this time For the details on the installation procedures refer to the corresponding manuals ...

Страница 105: ...rive provided as an accessory Please check the serial number txt eg 047 011752 txt file 1 Turn on the PC and the equipment if they are not yet 2 Insert the CD into the CD ROM drive or connect the USB drive to the USB connector and then perform a virus scan for the PC before installing the CD 3 Go to the InstallShield folder and run Setup exe 4 The following screen will appear Click Next ...

Страница 106: ...el PCH 30CS Installation Manual 5 Check the equipment model PaX i Plus_Insight and click Next 6 Make sure that all modalities are checked as the following If the equipment does not include the CEPH feature uncheck the CEPH option and then click Next ...

Страница 107: ...7 English 7 Make sure that I2Pano or WidePano is selected in the Pano sensor type selection window and then click Next 8 Optional Confirm that the WideCeph is selected in the CEPH sensor type selection window and clickNext 9 Select COM2 for the default port number and click Next ...

Страница 108: ...11 Select the 3rd party software in use and click Next when EzDent i is installed selectSDK Then click Next to continue 12 Check the options according to the product specifications When the AutoSave is checked the image data acquired saved automatically 13 Select the components according to the product specifications ...

Страница 109: ...h 14 Confirm that the following drivers are selected For the first time installation select all 15 You can check the information entered so far with the Ready to Install window If necessary you can modify it by clicking Back 16 When the information is confirmed click Install to continue ...

Страница 110: ...lling Software 100 PaX i Plus Insight Model PCH 30CS Installation Manual Installing the DirectX 1 InstallShield will continue to DirectX installation process Select I accept the agreement in the Welcome window ...

Страница 111: ...9 Installing Software PaX i Plus Insight Model PCH 30CS Installation Manual 101 English 2 Click Next to start the installation ...

Страница 112: ...9 Installing Software 102 PaX i Plus Insight Model PCH 30CS Installation Manual 3 Click Finish to exit the wizard ...

Страница 113: ...ual Serial 1 x Flectron Grabber 1 After completing the Direct X installation Grabber Driver Setup will be started Select the language in the installer language window and press the OK button 2 When the Grabber Driver Setup window appears click the Next button 3 Enter the installation location and click the Install button ...

Страница 114: ...ill appear and disappear and the Completing Grabber Driver Setup window will appear Choose the Reboot now or I want to reboot later and click the button manually If an error occurs during installation it will be displayed in red font color below If no abnormality is found it is displayed in blue font color ...

Страница 115: ...nstallation the installation program will be started Select the language in the installer language select window and press the OK button 2 Press the V Grabber s Install button 3 The installation is completed and the V Grabber Installation Program window appears Click the Yes button to immediately reboot or the NO button to reboot later ...

Страница 116: ..._Insight_Install_Log txt on the desktop 2 Open it to check the file You can find out that all components are installed 3 Go to section 9 5 Setting up the User Information Uninstalling Software 1 Open the Start screen type Uninstall a Program in the search box 2 Find the programs you want to uninstall and double click the program to uninstall 3 When you are asked if you want to continue click Yes o...

Страница 117: ...Console program with automatic interworking function and EzDent i program If it is not able to use the automatic interworking function or if it needs to set it manually after the automatic interworking follow the procedure below Running EzDent i as an Administrator Because of the different levels of authority between Console Software and EzDent i the program may not run properly Configure the EzDe...

Страница 118: ...the Compatibility tab select Run this program as an administrator in the Settings section and click OK to apply the settings In case there are multiple log in users to the computer and it needs to apply the settings to all users on the computer utilize Change settings for all users button ...

Страница 119: ...i Plus Insight Model PCH 30CS Installation Manual 109 English 9 5 1 Setting EzDent i Setting the Imaging Acquisition Options 1 Start EzDent i on your PC 2 Click Main Menu then select Settings 3 In setting widow click Acquisition ...

Страница 120: ...4 In the Acquisition tab click Console Program In the Console Program tab check whether Sync capture setting with console program is selected Console software path Patient information fire path Display acquisition button 5 Click OK and restart the computer to apply the new setting ...

Страница 121: ... the features not explained in this section go to the EzDent i user manual 1 Click the Add Patient from the PATIENT tab 2 Enter the required fields in the patient information Chart number First name Last name the rest of the fields are optional but it is recommended that you fill them in 3 Click Add to save the patient record ...

Страница 122: ...n menu may differ due to your equipment s option CEPH or non CEPH or the Display option you selected in the setting menu 2 Select an imaging mode from the menu Based on your selection the console software window appears If the equipment is still in packing mode the error code E001 appears Go to 9 5 2 Setting Console Software Disabling the Packing Mode to disable packing mode 3 Proceed to the secti...

Страница 123: ...uring the Parameters The following information should be entered by the user requirements 1 From the main GUI window click the settings icon in the upper right corner 2 Log in the tap will be open by default On the right side of the screen select Engineer and type the password vatech and then click Log In 3 Click the User tab ...

Страница 124: ...string in the Label Text field is displayed By default the equipment model name is displayed 5 Set the DAP Dose Area Product Level and DAP Unit for the unit which is displayed on the screen 6 In the Language Option change the language if necessary and click Machine Set 7 Click the General tab and type the serial number of the equipment in the Machine information ...

Страница 125: ...tallation Manual 115 English 8 In the Patient Information Setting configure Link Type and File Path as shown below 9 In the Database Linking configure Link Type and File Extension as follows Fields When EzDent i is used CT CR Link Type SDK Link CR Save Name DCM ...

Страница 126: ...aX i Plus Insight Model PCH 30CS Installation Manual 10 Click the Default Set tab and configure the user defined parameters The default feature can be modified according to the user s requirement 11 Click Save if changes occurred ...

Страница 127: ...he packing mode at this step is required for a successful installation 1 Click the General tab in the control panel 2 In the Networking option select the Serial checkbox and set Serial port and baud rate as follows and then click Manager If an error has occurred during connection make sure the COM port setting is correct as follows 1 Run Device Manager 2 Check the COM port assigned to virtual seri...

Страница 128: ..._0000 to exit the packing mode Now note that the equipment is out of the packing mode 5 Click the Exit button and terminate the control panel 6 Exit the imaging program and restart the equipment to take the changes into effect If you want to return to the packing mode enter PKEN_0001 on the command window ...

Страница 129: ...ach mode 0001 PANO CEPH Music The same for each mode 0002 Default PANO CEPH Beep The same for each mode 1 Send the command by the command specification as specified in the table above Refer below for some examples Default mode 0002 beep for each imaging mode When the same Music Announcement is desired for PANO and CEPH imaging modality Enter the command SPM_MPOP_0001 in the command field followed ...

Страница 130: ...ht Model PCH 30CS Installation Manual Finalizing the Console Software Settings 1 Click the Exit Close button and terminate the control panel 2 Important Exit the imaging program main GUI and restart the equipment to take the changes into effect ...

Страница 131: ...Specifications PaX i Plus Insight Model PCH 30CS Installation Manual 121 English 10 Technical Specifications 10 1 Mechanical Specifications Dimensions unit mm With CEPH Unit Without CEPH Unit With Base Without Base ...

Страница 132: ...Base Max 2292 mm With Base Max 2320 mm Dimensions during operation Length x Width x Height Without CEPH unit 970 mm L x 1333 mm W x 2292 mm H without Base 990 mm L x 1333 mm W x 2320 mm H with Base With CEPH unit 1905 mm L x 1333 mm W x 2292 mm H without Base 1905 mm L x 1333 mm W x 2320 mm H with Base Rotating Unit Vertical Movement Max 700mm Installation type Base Stand Wall Mount Default Wall M...

Страница 133: ...uring Transport and Storage Temperature 10 60 Relative humidity 10 75 Atmospheric pressure 860 1060 hPa 10 3 Reconstruction Time PANO Option Reconstruction Time Insight PAN Approximately 1 minute Reconstruction time exists for PaX I Insight only The above data is obtained from a computer system which is based on HP Z440 and GeForce GTX1060 6GB Image reconstruction time varies depending on computer...

Страница 134: ...l be agreed with the local radiation protection advisor RPA customer 3 A fluorescent lamp shall not be used in the X rays on sign 4 The customer shall be responsible for the proper installations for the warning controlsystem including the lamp and door interlock switch based on the MEIGaN guideline MEIGaN Medical Electrical Installation Guidance Notes 5 Pre installation planning is crucial to the ...

Страница 135: ...nsight Model PCH 30CS Installation Manual 125 English Schematic Diagram Components Supplied Procedures The individual cable length Signal Cable 5m 198 Door interlock cable 5m 198 Warning lamp 1m 40 Power source cable 1m 40 ...

Страница 136: ...re the Warning System Panel Part No 28 2 Install the Warning System Panel at the proper height after taking each cable length into account 3 Connect the warning lamp not provided 4 Connect the door interlock switch not provided 5 Connect the power source for the warning lamp ...

Страница 137: ...y to reach in the emergency case but can t be pushed bymistake The switch shall be a type of mistake proof The switch is not supplied The switch shall be installed at a height of 1 2 to 1 5 meters 47 to 60 1 The cable sizes N L and PE 12 AWG 3 x 4 mm2 2 The cable to Emergency Stop Switch shall be the same size as the power cable itself 3 Install the socket connector terminal on the 2nd protective ...

Страница 138: ...n Height This section explains how to limit the column height within the permissible range 1 Measure the ceiling height in the X ray shield room Hceiling Removing the column covers 2 Remove three Fixing Bolts as shown in the figure 1 Remove the Column Rear Top Cover as shown in the figure ...

Страница 139: ...Appendix PaX i Plus Insight Model PCH 30CS Installation Manual 129 English 2 Remove the side cover ...

Страница 140: ...by using the following formula Hscrew height Hceiling d where d is the minimum distance 30 cm 12 between the ceiling and the top of the equipment when the equipment is fully loaded e g If d 30 cm Hceiling 250 cm 99 Hscrew height Hceiling d 250 30 220 cm Accordingly set the height to this level by using the height adjustment bolt ...

Страница 141: ...he screw from the default current position to the new one 1 Loosen two bolts halfway important Do not unscrew completely the bolt If not it could drop into the column and may cause big trouble to retrieve it out 2 Looking up the scale slide the Limit Block down to a new location Hscrew height 220 mm and fix it back 3 Put the covers back in reverse order and fix them with the bolts ...

Страница 142: ...how to connect the third party Exposure Switch with the equipment from VATECH How to 1 Cut the Exposure Switch cable provided with the equipment 2 According to the following schematic diagram rewire the cables 3 Double check the wiring before use Tape the end of each unused wire to prevent the wires from causing an inadvertent short circuit ...

Страница 143: ... Checking PC BIOS Settings HP PC BIOS Setup PC Model HP Z440 PC BIOS default Main Menu Sub1 Menu Sub2 Menu Setup Value Advanced Power Options Runtime Power Management Disable Advanced Power Options Idle Power Savings Normal Advanced Power Options Enhanced Halt State C1E Disable ...

Страница 144: ...ation Manual F Installation Checklist 1 General Information Customer Information about the Equipment Purchaser Name of Clinic or Hospital Address Phone E Mail Website Dealer Information about the Equipment Seller Name of Dealer Address Phone E Mail Website ...

Страница 145: ... Date of Installation Date of installation Model Serial No 3 System Delivery to Site Yes No Did you review and identify the delivery route and method for equipment in advance Is the freight elevator available Is the security guard if any notified of the installation in advance Are two installers including the helpers available to move and unload the equipment ...

Страница 146: ...dedicatedcircuit Does the electrical input condition to the installationsite meet the MEIGaN requirements Is the local Network IP address of clinic 192 168 33 xx Is a compressor or air conditioner suction located right next to X ray Room Is the floor flat and level Is the carpet on the floor If so remove it Before Opening Boxes Yes No Did the delivery company carry and handle with caution Did the ...

Страница 147: ...ere are not any suspicious holes or scratches on the box after opening 5 While Installing Equipment Yes No Are the installers careful with any sensitive parts while carrying equipment Did the installers make sure that various cables especially optic cables are not coiled too much Did the installers perform installations according to the manual Did the installers not touch or place pressure on sens...

Страница 148: ...en Do the equipment Up Down switch works properly 7 Software Compatibility Yes No Is the Anti virus software installed Is the firewall installed If yes indicate software or hardware Type Is the 3rd party software installed If yes indicate the name s and versions Are they compatible with software from Vatech If No indicate the name s and versions Version 8 Electrical Requirements Yes No Is the circ...

Страница 149: ...9 Network Configuration Yes No Is the network configured with 1 Gbit s of CAT5 Is the equipment connected to the network Is the network installation company identified What is the TCP IP addressassigned Address What is the subnet masking address Address Is there a DHCP server ...

Страница 150: ......

Страница 151: ...anufacturer We reserve the right to make any alterations that may be required due to technical improvement For the most current information contact your VATECH representative Tel 82 1588 9510 Email gcs vatech co kr Website www vatech com Headquarters 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do 18449 Korea Factory 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do 18449 Korea The CE symbol grants this...

Страница 152: ...설치 설명서 Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com ...

Отзывы: