3. Installing the Equipment
EzRay Air Wall (Model: VEX-S300W) Installation Manual
33
EN
G
L
ISH
Since the Power Box Assembly is shipped with one bolt
tightened, they are required to be loosened prior to leveling
it.
3.2.4
Leveling the Power Box Assembly: Left/Right
1.
Place the spirit level on the position as shown in the figure.
2.
After placing the spirit level on its position, adjust the two bolts until the bubble on the
spirit level is located in the middle.
Allen Wrench
Size: 3 mm
Содержание EzRay Air Wall VEX-S300W
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ...Table of Contents vi EzRay Air Wall VEX S300W Installation Manual This page intentionally left blank ...
Страница 12: ...1 Introduction 2 EzRay Air Wall Model VEX S300W Installation Manual This page intentionally left blank ...
Страница 60: ...3 Installing the Equipment 50 EzRay Air Wall Model VEX S300W Installation Manual 3 6 6 View after Completion ...
Страница 64: ...3 Installing the Equipment 54 EzRay Air Wall Model VEX S300W Installation Manual ...
Страница 66: ...4 Product Specifications 56 EzRay Air Wall Model VEX S300W Installation Manual ...
Страница 67: ...4 Product Specifications EzRay Air Wall Model VEX S300W Installation Manual 57 ENGLISH ...
Страница 73: ...Appendix EzRay Air Wall Model VEX S300W Installation Manual 63 ENGLISH Appendix Drilling Template Single Stud ...
Страница 74: ...Appendix 64 EzRay Air Wall Model VEX S300W Installation Manual Double Stud ...
Страница 79: ......
Страница 80: ...Copyright VATECH Networks All Rights Reserved ...