VASTEX E2-2331 Скачать руководство пользователя страница 5

 

 

2) Install Lid Lifting Cylinders                       

Remove the acorn nut from the upper cylinder 
mounting studs located on both sides of the lid. 
Unlock and carefully lift lid far enough to slide 
lifting cylinders onto studs. Replace acorn nuts 
onto stud. 

Snug only 

with a 5/8” wrench. Do not 

over tighten! 

1) Install Legs on Exposing Unit 

(Models E2-2331/E2-4131/E2-4731) 

1a) 

Place Legs on a clear spot on the floor, 

28.5” (72.5cm) apart as shown in picture 1a. 

1a

 

1b) 

Lock lid handles as shown. Carefully lower the 

exposing unit down onto the legs. Two people are 
required to do this as caution must be taken to not 
damage the machine’s glass or rubber blanket. 

1b

 

1c)  

Legs are installed with (8) 3/8" bolts and (8) 

3/8” serrated nuts. Use (2) 9/16” open end wrench-
es and tighten all bolts well.  

1c

 

2

 

28.5” 

(72.5c

m) 

Assembly 

5

Содержание E2-2331

Страница 1: ...purchase for future reference Date ____ ____ VTX Vastex International Inc 1032 N Irving St Allentown Pa 18109 USA Phone 610 434 6004 Fax 610 434 6607 Web Site www vastex com Authorized Representative...

Страница 2: ...Power Supply P N 04 08 055 Warranty Floor Model Tabletop Standard Floor Model Glass Reorder Numbers P N 04 08 048 P N 04 08 049 Vacuum Blanket P N EUB 2331 P N EUB 4731 Lid Seal P N 04 08 039 P N 04 0...

Страница 3: ...en removed Do not operate if power cord is damaged Do not attempt to defeat safety interlocks Noise and Vibration This noise level produced by this equipment does not ex ceed 70 dB A Tools Required 9...

Страница 4: ...er Placing Exposing Units into service and operating them To place your unit into service follow steps 1 and 2 on page 5 of this manual To use your unit follow steps 1 through 9 on page 6 For tips on...

Страница 5: ...ll Legs on Exposing Unit Models E2 2331 E2 4131 E2 4731 1a Place Legs on a clear spot on the floor 28 5 72 5cm apart as shown in picture 1a 1a 1b Lock lid handles as shown Carefully lower the exposing...

Страница 6: ...art After the exposing time has ex pired the lights and vacuum pump will automatically shut off The screen is now exposed 9 Unlock the lid to break the vacuum and remove the screen Operation Vacuum Ti...

Страница 7: ...subjected to an impact Maintenance Side Glass Retainer Front Glass Retainer with 3 cams Rear Glass Seal 1 per side Do Not allow objects to contact the LED light lens 3 Reinstalling the glass Before i...

Страница 8: ...at all four sides If this seal is not contacting the glass it will be necessary to adjust the lid lower Proceed as follows Pictures below for reference a Remove both Lid Lifting Cylinders from their u...

Страница 9: ...ger or a pencil Turn the vacuum timer all the way down Put your sunglasses on and hit the start with the lid up view if ALL lights are working If not proceed to step 2 Contact factory for replacement...

Страница 10: ...atio will prevent a good gasket seal prevent good detail resolution and increase chances of saw tooth edges Manufacturers recommend an EOM ratio of 10 to 20 percent With an emulsion stencil more is no...

Страница 11: ...west Rz numbers possible and can save large amounts of screen room production time Fig 6 Capillary films are best applied with the emulsion up on a hard flat surface Fig 7 Fig 7 Place a screen squeege...

Страница 12: ...13...

Страница 13: ...f loss or damage in transit shall be borne by Buyer If the Buyer fails to accept the goods from the common carrier or licensed trucker the Seller shall be entitled to claim payment from the Buyer Sell...

Страница 14: ...tes will be paid by VASTEX if a warranty item 4 4 If the item in question must be replaced immediately and is more than a year old it will have to be purchased at list price and will be shipped COD A...

Отзывы: