3)
Unplug main power cord, unplug light bar
connector, and remove both #8 sheet metal
screws holding the light bar in place. Each
light bar has a power connector.
Note: It is important to wear dark shaded and UV
rated eye protection when testing LED Lights.
Do Not allow objects to contact the LED light lens.
Light Bar Replacement / Installation
1)
1)
Inspection of LED light Bars. Lift the lid
and override the safety switch on the left side
of the cabinet by depressing with your finger
or a pencil. Turn the vacuum timer all the
way down. Put your sunglasses on and hit
the start, with the lid up view if ALL lights
are working. If not proceed to step 2. Contact
factory for replacement light bar.
Depress Limit Switch
when testing lights
Troubleshooting
4)
Installing the new light bar. Install the #8
sheet metal screws, plug in the light bar
connector, plug in the main power cord.
It may be possible to expose screens with
LED lights out, but a repair is needed to
ensure optimal performance.
5)
Test the new light bar. See above section 1.
2)
Remove exposing unit glass, see Maintenance
section for glass removal.
6) Reinstall exposing unit glass. Installation is the
reverse of removal
Connector
Light Bar
8
Содержание E2-2128
Страница 11: ...11...