![Vasco D60 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/vasco/d60/d60_user-and-installation-manual_3584224042.webp)
Binding and unbinding the additional optional RH RF switch (11VE20014):
Binding:
Turn off the power on the ventilation unit, then turn the power back
on.Subsequently, the ventilation unit will look for new switches during the next
10 minutes. Subsequently, remove the batteries from the sensor and return
them (see Replacing the batteries in the RH RF switch).
During minimum 3 seconds, touch the operation zone in the right-hand bottom
corner. You should release the operation zone as soon as all LEDs start flashing.
If the connection is successful, the LED in the top left-hand corner will light up
green twice and a LED will light up at the right-hand side to indicate the current
position of the RH RF switch.
Tip: You can connect a single switch to maximum 3 units.
Unbinding:
Briefly interrupt the power supply to the switch by removing the batteries from
the sensor and reinserting them (see Replacing the batteries in the RH RF
switch). The switch will disconnect the ventilation units during the next 10 mi-
nutes. During minimum 10 seconds, touch the operation zone in the right-hand
bottom corner. You should release the operation zone as soon as all LEDs start
flashing for the second time. This will disconnect all the connected units in case
you have more than one connected ventilation unit. The LED on the switch will
light up red four times to indicate that the units are disconnected.
INSPECTING / CLEANING THE HEAT EXCHANGER AND VENTILATORS 15
14 PUTTING INTO OPERATION & INITIAL SETTING
The user must make sure that the installer maintains the complete installation
periodically.
Remove the power of the unit, before you start the maintenance activities.
Once every four years:
•
Remove the power supply.
•
Remove the front panel of the unit.
•
Pull the unit out of the framing by pulling the strap of the unit and pushing
the plate above the unit upwards. NEVER remove this strap!
•
Remove the plate at the backside of the unit.
•
Unplug the power cord.
•
Remove the two temperature sensors from the top part of the unit.
•
Remove the top cover of the unit.
•
Now, the heat exchanger can be removed from the unit.
•
If necessary, clean the heat exchanger by wiping the four surfaces with a
damp cloth.
•
Do NOT use aggressive or dissolving cleaning agents.
•
Carefully slide the heat exchanger back into the unit without damaging
the sealing rubbers.
•
Assemble everything in the reverse order.
5 MAINTENANCE
INSPECTING/CLEANING
THE HEAT EXCHANGER
AND VENTILATORS
NL
FR
DE
EN
IT
PL
Step 1:
Remove the front panel.
Step 2:
Remove the device from its housing.
Step 3 :
Disconnect the power cord.
Step 4:
Remove the cover and the changer.
4
3
2
1
A
B
C
D
DATUM
SCHAAL
GET.
MACHINE NR.
TEKENING NR.
ISO
B 3650 DILSEN
Tel. +32 (089) 79.04.11
Fax. +32 (089) 79.05.00
PROJECT
BENAMING
A4
Decentrale ventilatie unit
207 D60
SHO
1/08/2017
207.00.00.00
(1:2)
4
3
2
1
A
B
C
D
DATUM
SCHAAL
GET.
MACHINE NR.
TEKENING NR.
ISO
B 3650 DILSEN
Tel. +32 (089) 79.04.11
Fax. +32 (089) 79.05.00
PROJECT
BENAMING
A4
Decentrale ventilatie unit
207 D60
SHO
1/08/2017
207.00.00.00
(1:2)
4
3
2
1
A
B
C
D
DATUM
SCHAAL
GET.
MACHINE NR.
TEKENING NR.
ISO
B 3650 DILSEN
Tel. +32 (089) 79.04.11
Fax. +32 (089) 79.05.00
PROJECT
BENAMING
A4
Decentrale ventilatie unit
207 D60
SHO
1/08/2017
207.00.00.00
(1:2)