2.1. Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
EN60598-2-17
The suspension devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation.
Basically installation has to be made by
suitable net. The second suspension must be designed and attached so no part of the installation can
fall down in case of failure.
During construction, reconstruction and deconstruction unnecessary st
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety
-
Before the first start-up or after critical
expert.
-
Review in the frame of the inspection test at least
-
Review by a qualified person at least once a year.
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of people
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used material an
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a professional installer. An
inappropriate installation can lead to injuries and
It is not allowed to install the device in the grip area of people.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The device may not be installed so it can swing freely in the
Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt
the safety of a possible installation form!
5 / 16
Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
17 Installations are to carry out by skilled personnel only.
The suspension devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation.
Basically installation has to be made by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety-related and mechanical facilities:
up or after critical changes before restarting it has to be checked by an
Review in the frame of the inspection test at least all four years by an expert.
Review by a qualified person at least once a year.
How to carry out the overhead installation:
should install the device out of the lounge area of people
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used material an
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a professional installer. An
inappropriate installation can lead to injuries and/or damaged properties.
It is not allowed to install the device in the grip area of people.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The device may not be installed so it can swing freely in the room.
Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt
the safety of a possible installation form!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
carry out by skilled personnel only.
The suspension devices have to be build and measured so they can withstand for an hour the tenfold
using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
ay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
changes before restarting it has to be checked by an
all four years by an expert.
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used material and the
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a professional installer. An
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt
Содержание LED Typhoon Strobe
Страница 1: ...Manual LED Typhoon Strobe...
Страница 8: ...8 16 3 2 Dimensions...